-
North Fowlers Bay - Chundaria. Annual reports and progress reports for the periods 15/9/1993 to 14/9/1998, and 28/10/1998 to 12/3/1999.
North Ltd's Barton Project commenced in 1990 across a number of licences progressively taken out over the western Gawler Craton, which eventually came to include EL 1865. Initial exploration for heavy mineral sand in the Barton-Ooldea area, 100-200...-
Document
Published: 06 May 1999
-
RB 91/00041 Geology of the KINGOONYA 1:250 000 map sheet area.
Extensive field geological mapping, augmented by petrological and geochemical studies, reinterpretation of company drilling and water-bore logs and a nine-hole drilling programme has detailed the geology of the KINGOONYA area. The stratigraphy spans...-
Document
Published: 01 Apr 1991
-
RB 92/00037 Review of mineral exploration, KINGOONYA 1:250 000 map area.
This report was prepared as a summary of all open file mineral exploration data from the KINGOONYA 1:250000 mapsheet area that are held in the SADME records management Envelope system. The aim of the holdings review was to describe past exploration,...-
Document
Published: 29 Nov 1991
-
RB 96/00016 Review of mineral exploration - CHILDARA region.
Mineral exploration on CHILDARA 1:250 000 geological map sheet was reviewed from SADME open file Envelopes, to complement an overview of regional prospectivity supported via the recent acquisition of high quality aeromagnetic data and a compilation by...-
Document
Published: 01 May 1996
-
Gina Outstation (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 30-45 km east of Commonwealth Hill, commenced with a re-assessment of open file airborne magnetic data...-
Document
-
Wynbring [Siding]. Data release made in lieu of submitting a first partial surrender report upon licence expiry/renewal : annual reports for the period 30/8/2004 to 29/8/2009.
An area located approximately 160 km north-northwest of Ceduna is being explored for possible economic nickel-copper-platinum group metal magmatic mineral deposits, which may have formed within Archaean to Proterozoic basement rocks in a geological...-
Document
-
Commonwealth Hill, Perfection Well, Wirrida North, Nelson Bore and Ingomar (the Commonwealth Hill Joint Venture Project). Joint annual reports and final report to licences' respective expiry/renewal, for the period 6/10/1995 to 6/12/1998.
Exploration for Challenger - type primary gold deposits that may possibly have formed within buried Archaean basement rocks in the Commonwealth Hill area, which is the purpose of one of two joint venture agreements currently in force between Minotaur...-
Document
Published: 06 Jan 1999
-
Lake Labyrinth. First partial relinquishment report for the period 31/10/2001 to 30/10/2004.
Exploration for possible buried epithermal or hydrothermal gold deposits within Precambrian basement 20-30 km east of Tarcoola has targeted the potential of a series of prominent northwest - trending linear demagnetised zones, representing probable...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-52, Notrab mineral prospect, Barton West area. Project final report.
Dominion Gold Operations applied to PIRSA for PACE Initiative Year 2 funding in 2005 to assist with the drilling evaluation of the geology and mineral potential of a 6 km x 2 km, peak 86 ppb gold-in-calcrete geochemical anomaly at the Notrab prospect,...-
Document
-
Yerda Well. Second partial surrender report, for the period 20/1/2004 to 19/1/2008.
Exploration for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the subject area of the north-western Gawler Ranges utilised existing and newly acquired regional gravity data to attempt to identify...-
Document
-
Sandstone Outstation area (part of the Central Gawler Project). Second partial surrender report, for the period 20/5/2005 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) for the subject 39 square km of relinquished portions of EL 3343, located about 70 km south-west of Coober Pedy, commenced with a...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Johns Outstation / Giffen Well. Annual reports for the period 8/10/2007 to 7/10/2018.
To date, land access restrictions imposed by the Commonwealth Department of Defence have prevented any field work from occurring on the subject tenement, taken up to cover the Giffen Well magnetite iron ore deposit and adjacent inferred prospective...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ooldea. Annual reports for the period 1/9/2010 to 19/9/2018.
Due to catastrophic flood damage to Cosmo’s financial investments, no field work was undertaken during the twenty-first year of tenure under renewed EL 4565. In December 2010, Cosmo submitted to PIRSA a Declaration of Environmental Factors for its...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-20 - Golf Bore (part of the Jumbuck Project). Archaean basement, supergene zone, metamorphic/hydrothermal gold prospect. Drilling project final report.
The subject Golf Bore prospect and its currently subeconomic gold occurrence are located in the north-eastern corner of the Jumbuck Project mineral exploration tenement package, which incorporates ~8000 square km of ground – approximately 2500 square...-
Document
-
Rounsevell Hill. First partial relinquishment report, for the period 25/10/2002 to 24/10/2003.
Exploration undertaken in an area situated 40 km north-west of Tarcoola, targeting possible economic iron oxide - associated copper-gold mineralisation that may have formed within altered near-surface Hiltaba Suite granitic intrusions, has comprised...-
Document
-
Rounsevell Hill. Information status at licence second partial relinquishment, for the period 25/10/2002 to 24/10/2004 : no work performed.
There is no abstract created for this record-
Document
-
Heartbreak Hill. Annual reports to licence expiry/full surrender, for the period 27/9/1996 to 26/9/1997.
Mulgathing Complex and Hiltaba Suite rocks were interpreted from aeromagnetic data obtained in areas located 10 km north of, 70 km south-east of, and 35 km south of Tarcoola. Calcrete sampling was followed by RAB drilling (178 holes, total 5047 m)...-
Document
-
Barton East (part of the Gawler Joint Venture Project). Second partial surrender report at licence expiry/renewal, for the period 14/3/1997 to 13/3/2002.
Approximately 894 square km or 37.6% of the former area of EL 2282 Barton East has now been relinquished at this licence's expiry on 13/3/2002 and its subsequent renewal for a second 5-year term. The now relinquished portion of ground, which is...-
Document
-
Barton West and Barton East (part of the Gawler Joint Venture Project). Joint first partial surrender report, for the period 14/3/1997 to 26/10/1999.
Approximately 1113 square km or 62.8% of the former area of EL 2281 Barton West, plus 378 square km or 13.7% of the former area of EL 2282 Barton East, have now been jointly relinquished as of 26/10/1999 due to the perceived diminished prospectivity...-
Document
Published: 26 Oct 1999
-
Tarcoola - Tallaringa Bedrock Drilling Project.
Archaean, Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...-
Document