-
RB 2017/00038 PACE Copper Coompana Drilling Project: Drillhole CDP002 preliminary field-data report.
The Geological Survey of South Australia, in partnership with Geoscience Australia, is undertaking a regional pre-competitive geoscience research drilling program in the far west of South Australia called the Coompana Drilling Project. The Coompana...-
Document
Published: 01 Dec 2017
-
RB 2017/00022 PACE Copper Coompana Drilling Project: Drillhole CDP001 preliminary field-data report.
The Geological Survey of South Australia, in partnership with Geoscience Australia, is undertaking a regional pre-competitive geoscience research drilling program in the far west of South Australia called the Coompana Drilling Project. The Coompana...-
Document
Published: 01 Oct 2017
-
RB 2017/00041 PACE Copper Coompana Drilling Project: Drillhole CDP005 preliminary field-data report.
The Geological Survey of South Australia, in partnership with Geoscience Australia, is undertaking a regional pre-competitive geoscience research drilling program in the far west of South Australia called the Coompana Drilling Project. The Coompana...-
Document
Published: 01 Dec 2017
-
RB 2017/00039 PACE Copper Coompana Drilling Project: Drillhole CDP003 preliminary field-data report.
The Geological Survey of South Australia, in partnership with Geoscience Australia, is undertaking a regional pre-competitive geoscience research drilling program in the far west of South Australia called the Coompana Drilling Project. The Coompana...-
Document
Published: 01 Dec 2017
-
RB 2021/00016 Delamerian Orogen mineral potential mapping : the Cu-Mo-Au mineral system. Interim report.
A mineral systems analysis for Cu-Mo-Au in the Delamerian Orogen has been conducted to assess the orogen's potential for containing this type of mineral occurrence. A conceptual model was delineated, and prospectivity maps were created. These maps can...-
Document
Published: 01 Nov 2021
-
RB 2017/00024 Report on Mineral Systems Drilling Program drillhole MSDP03, Six Mile Hill area.
MSDP03 is one of four diamond drillholes drilled during 2015 in the Six Mile Hill area as part of the Mineral Systems Drilling Program (MSDP). The hole was drilled vertically to 262.6 m depth over the period 25/9/2015-2/10/2015, and intersected two...-
Document
Published: 01 Aug 2017
-
RB 2017/00023 Report on Mineral Systems Drilling Program drillhole MSDP01, Six Mile Hill area.
MSDP01 is one of four diamond drillholes drilled during 2015 in the Six Mile Hill area as part of the Mineral Systems Drilling Program (MSDP). The hole was drilled vertically to 1116.8 m depth over the period 31/7/2015-15/9/2015, and intersected six...-
Document
Published: 01 Aug 2017
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Caroline, Mount Harcus and Pine Ridge (the Musgrave Project). Joint annual reports for the period 1/7/2011 to 31/12/2018.
Three Exploration Licences spread across the central and eastern Musgrave Ranges are now being explored by NiCul Minerals Limited (a wholly owned subsidiary of PepinNini Minerals Limited) which currently owns 100% of each tenement. The ground held is...-
Document
Published: 28 Feb 2019
-
Data release - as updated [made at SA Director of Mines' discretion] : The North-western Murray Basin Project. Joint annual reports for the period 29/8/2012 to 28/8/2014.
During Year 7 of the project, Goldfields did no more field work, but undertook office-based analyses of bedrock geochemical and geological data obtained in its 2012 aircore drilling campaign. Image processing and interpretation of the Canegrass...-
Document
Published: 28 Feb 2015
-
Data release (in part made in lieu of submitting a second partial surrender report) : Uno Range (part of the East Eyre Peninsula Project). Annual reports for the period 1/8/2011 to 31/7/2020.
A licence consisting of two separate sub-blocks located ~30 km west-northwest of Iron Knob is being explored for possible economic buried Paris type epithermal/hydrothermal gold and silver mineralisation, as well as for Menninnie Dam type...-
Document
Published: 18 Dec 2020
-
Data release - as updated [made at SA Director of Mines' discretion] : Old Wartaka. Annual reports for the period 8/5/2013 to 7/5/2019.
A small area located on the eastern side of the Roopena Fault Zone, proximal to the south-eastern margin of the Gawler Ranges, is being explored for possible buried epigenetic gold and silver mineralisation, or IOCG type base metal sulphide...-
Document
Published: 13 May 2019
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 2018
-
Data release - as updated [made at SA Director of Mines' discretion] : Kalkaroo (part of the Mundi Mundi Plains JV Project). Annual reports for the period 21/4/2005 to 20/4/2010.
An area of shallowly covered Curnamona Province metalliferous basement rocks abutting the South Australia / New South Wales border, approximately 80 km north-east of Olary, is believed to be prospective for Broken Hill and McArthur River style...-
Document
Published: 06 Oct 2010
-
Dudley East area 2 (part of the Dudley Project). Final report at licence expiry/full surrender, for the period 3/8/2018 to 2/8/2020.
A small area which was centred on the eastern end of Kangaroo Island, ~10 km south-east of Penneshaw, has been explored for exploitable quantities of lithium or tantalum-bearing minerals, specifically spodumene, zinnwaldite and lepidolite, because...-
Document
Published: 14 Sep 2020
-
Iron Knob. Information status at licence fourth partial surrender, for the period 17/2/2005 to 26/4/2019 : no work performed.
There is no abstract created for this record-
Document
Published: 16 Jul 2019
-
Iron Knob (part of the Parkinson Dam Project). Fifth partial surrender report, for the period 17/2/2005 to 26/4/2020.
50% of the former area of EL 5602 has been surrendered, splitting the licence into two remnant sub-blocks. Late in 2014, an initial field reconnaissance followed by surface geochemical sampling was carried out in the soil covered, previously untested...-
Document
Published: 26 Jun 2020
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 2 of 2].
The Telephone Dam lead-zinc-silver prospect is located in the north-eastern part of the now renewed Wilcherry Hill EL 4162. During the 1980s and 1990s, diamond, RC and RAB drilling done on this prospect by Aberfoyle Resources had identified a...-
Document
Published: 31 Dec 2008
-
Thurlga. Information status at licence surrender, for the period 24/10/2012 to 17/10/2013 : no work performed.
There is no abstract created for this record-
Document
Published: 06 Dec 2013
-
Iron Baron. First partial surrender report at licence renewal, for the period 4/4/2011 to 3/4/2018.
An attenuated licence area centred ~80 km south-west of Port Augusta is being explored for possible buried IOCG-U mineralisation and shear-hosted uranium deposits that may be associated with parts of the Roopena Fault and the Kalinjala Mylonite Zone....-
Document
Published: 31 Jul 2018
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 2010