-
Venus Bay. Annual reports and final report to licence full surrender, for the period 27/7/1994 to 21/12/1998.
Diamonds and base and precious metal exploration undertaken north-east of Port Kenny on western Eyre Peninsula comprised loam sampling for kimberlite indicator minerals, RC drilling (7 vertical holes, total 470 m), plus bedrock petrological, heavy...-
Document
-
Lake Gilles (part of the Wilcherry Hill JV Project). Final report at licence surrender for the period 10/10/2002 to 9/10/2005.
Exploration for possible Mesoproterozoic iron oxide - associated gold and base metal deposits in an area located approximately 20 km north of Kimba has consisted of a review of past exploration results, the conduct of a Landsat multiband image...-
Document
Published: 15 Dec 2005
-
Lake Gilles (part of the Wilcherry Hill Project). First and second partial relinquishment reports, for the period 10/10/2002 to 9/10/2004.
Exploration for economic near-surface deposits of gold and base metals, in an area of possibly hydrothermally-altered Hiltaba Suite Mesoproterozoic basement located approximately 20 km north of Kimba, has comprised an assessment of previous...-
Document
Published: 15 Nov 2004
-
Data release - as updated [made at SA Director of Mines’ discretion] : Warramboo (the Central Eyre Project). Annual reports [but excluding four separately held joint annual reports] for the period 6/6/2001 to 8/2/2019.
During the sixth year of tenure of the Warramboo licence, now held by Adelaide Exploration Limited as renewed EL 2846 covering the same 1363 square km area as before, the only exploration-related activity which occurred was the acquisition during...-
Document
Published: 28 Mar 2018
-
Mount Hope, Moorlands and Brimpton Lake (the Mount Hope Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 24/5/2005 to 4/6/2010.
Monax Mining has been exploring the subsurface geology of three licences in the Mount Hope region of south-western Eyre Peninsula, seeking possible economic komatiite - hosted nickel deposits and also any felsic volcanic sediment - hosted massive...-
Document
Published: 27 Oct 2010
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 2014
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 2018
-
The Western Eyre Peninsula JV Project. Data release made in lieu of submitting a first partial surrender report for EL 2662, and a final report at the surrender of EL 2711: joint annual reports for the period 26/8/1994 to 11/4/2002.
A high amplitude, linear N-S trending magnetic feature, dubbed the Coffin Bay Magnetic Anomaly, and the recognition of basement lithologies analogous to those of metallogenically prospective late Archaean terranes in Canada, were the impetus for...-
Document
Published: 17 Jun 2002
-
RB 2012/00010 Geochronology and geochemistry of a Kimban diorite, drillhole LED001, Lake Gilles, eastern Gawler Craton.
The geology of the Lake Gilles locale in the south-west of the PORT AUGUSTA 1:250k map sheet area is poorly understood. Outcrop of basement rocks there is sparse, and typically occurs along the margins of the salt lake, where it is highly weathered....-
Document
Published: 01 Apr 2012
-
RB 90/00001 Explanatory Notes for the KIMBA 1:250 000 geological map.
The KIMBA 1:250 000 geological map sheet (hereafter referred to as KIMBA) lies in central Eyre Peninsula, extending between latitudes 33° to 34° S and longitudes 135° to 136°30'E (Fig 1). The principal towns are Kimba and Cleve, with smaller towns at...-
Document
Published: 01 Dec 1989
-
ExpNotes YARDEA: Explanatory Notes YARDEA, SI 53-03.
The YARDEA 1:250,000 scale regional geological map area straddles the southern margin of the Gawler Ranges on northern Eyre Peninsula. The only major township within the area is Minnipa, with Kimba and Wudinna both located immediately south of the...-
Document
-
Data release [made at SA Director of Mines' discretion] : Malbrom. First annual report submitted until the commencement of joint venture project joint reporting, for the period 5/4/2013 to 4/4/2014.
A licence composed of four separate small sub-blocks which generally lie ~90 to 120 km north-northeast of Port Lincoln is being explored primarily for extensions to known graphite-bearing horizons which may exist to the north and south of the...-
Document
Published: 29 May 2014
-
Data release - as updated [made at SA Director of Mines’ discretion] : Verran. Annual reports submitted until the commencement of joint venture project joint reporting, for the period 29/1/2010 to 28/1/2014.
An area located in the Cowell Hills is being explored for possible economic buried iron ore deposits. The desired commodity is DSO (Direct Shipping Ore) haematite mineralisation similar to that of the Middleback Range iron deposits, where pods of...-
Document
Published: 23 May 2014
-
Yalanda Hill (part of the East Eyre Peninsula Project). Third partial surrender report at licence expiry/renewal, for the period 5/12/2005 to 7/2/2013.
Nearly half of the area of EL 4665 has been relinquished after the joint venture partners decided that it holds diminished potential for the discovery of economic uranium mineralisation that could be associated with Olympic Dam style IOCG deposits, or...-
Document
Published: 07 Mar 2013
-
Smoky Bay. Progress and surrender reports for the period 1/5/1997 to 1/9/2000.
Exploration in an area centred on Smoky Bay, 40 km south-east of Ceduna, targeted shear - hosted mineralisation associated with granitoids of the Hiltaba and St Peter Suites. Several lineaments were identified from aeromagnetic data. Undertaking...-
Document
Published: 01 Sep 2000
-
Brimpton Lake. Data release made in lieu of submitting a second partial surrender report at licence expiry/renewal : annual reports for the period 22/10/2001 to 21/10/2004.
Following the farm-in of Anglo American Exploration to this tenement in March 2003, new activity has focussed on the rapid definition of drilling targets in a search for possible Archaean basement volcanic or sediment-hosted base metal massive...-
Document
Published: 21 Oct 2004
-
RB 2012/00019 Geochemistry of pre-1570 Ma mafic magmatism within southern Australia: implications for possible tectonic settings and timing of major mineralisation events in South Australia.
Geochemical and isotopic data from mantle-derived mafic rocks provide important constraints on our understanding of the composition and evolution of the lithosphere through time. Since the lithosphere is sensitive to tectonic processes such as...-
Document
Published: 01 Dec 2012
-
Tooligie - Verran, Ungarra and Darke Peake areas, south-eastern Eyre Peninsula. Combined partial surrender report for the period 12/11/1978 to 11/11/1982.
Exploration for unconformity-related uranium deposits has been performed within the subject ELs by Pancontinental Mining on behalf of joint venture partners since 1979. The initial exploration concept was to look for economic deposits occurring at or...-
Document
Published: 15 Nov 1982
-
RB 2016/00030 Mineral Systems Drilling Program in the southern Gawler Ranges, South Australia.
The Mineral Systems Drilling Program (MSDP) was a $3.5M cash and $4.11M in-kind collaborative drill program involving government, researchers, service providers and the minerals industry. The objective of the MSDP was to further the understanding of...-
Document
Published: 01 Sep 2017
-
RB 2020/00006 SHRIMP geochronology of the Mount Double area, Southern Gawler Ranges margin
This geochronological study was undertaken within the scope of the Mineral Systems Drilling Program (MSDP), a program that was aimed at improving the understanding of the geology and prospectivity of the southern Gawler Ranges margin area on northern...-
Document
Published: 01 Oct 2020