-
Data release [made at SA Director of Mines' discretion] : Eucla Basin Project tenement Group 1. Joint annual reports, for the period 1/1/2016 to 31/12/2018. Plus EL 6369 surrender.
27 contiguous licence areas within the eastern Eucla Basin, that span a combined 21,772 square km of ground between points as far as 90 km north of the Trans Australian Railway, 50 km east of Nullarbor and extending right down to the coastline, and...-
Document
Published: 28 Feb 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : North-west Olympic Domain Project. Joint annual reports plus annual reports for the period 8/10/2013 to 7/10/2018. Plus partial/expiry/full surrender reports to 24/04/2024.
Ten licences distributed across a broad region of the north-eastern Gawler Craton, between Roxby Downs and Coober Pedy, are being explored for possible buried economic IOCG style mineralisation. Research and interpretation completed by the licensee...-
Document
Published: 20 Nov 1918
-
Data release made in lieu of submitting a final report at the full surrender of EL 5285 Ingomar on 23/6/2018 : Jumbuck Project. Joint annual reports for the period 1/11/2013 to 31/10/2018.
A large area of the west-central Gawler Craton which is underlain by inferred gold-prone Archaean high grade metamorphosed rocks is being explored for Challenger style orogenic type lode gold that may have formed in the buried basement. The subject...-
Document
Published: 28 Dec 1918
-
Andamooka, Stuart Creek, Arcoona, Lake Torrens, Todds Dam, Lake Arthur, Woodforde Hill and Murdie Island (the Stuart Shelf Project). Joint first partial surrender report at licences' expiry/renewal, for the period 2/5/1975 to 16/6/1986.
WMC's Stuart Shelf exploration activities from 1975 to 1985 have sought mainly Olympic Dam style mineralisation (copper - uranium - precious metals in haematitic breccia host rocks), with lesser emphasis directed at: possible distal analogues of the...-
Document
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
The Olympic Domain Project. Joint annual reports for the period 1/1/2011 to 31/12/2016, plus individual licence full surrender final reports.
During the sixth year of the project, three gravity anomalies located on West Lake Torrens EL 4754, a short distance east of the Carrapateena IOCG prospect, were identified by Copper Range as worthy of follow up. A detailed infill ground gravity...-
Document
Published: 01 Mar 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 1/1/2015 to 31/12/2018.
During the fourth year of project licences' joint reporting, for the Theseus Project, Endeavour undertook further RC and diamond core drilling at the Minos prospect on EL 5280, and did detailed auger calcrete geochemical sampling over the Lake...-
Document
Published: 21 Feb 1919
-
Ilkina, Acraman, Yarranna Hill, Poondana Rock, Waddikee Rocks, Mount Sturt, Yaninee, Nunjikompita, Poochera, Wandana and Smoky Bay (Narlaby Palaeochannel area). Combined progress and technical reports for the period 5/1/81 to 31/12/83.
Carpentaria's exploration for sandstone type uranium deposits in the West Coast region of SA over the period 1979-1982 has revealed a major Tertiary buried palaeochannel system. The main Narlaby Palaeochannel is 170 km long, up to 10 km wide and is...-
Document
-
Indooroopilly, Muckanippie and Commonwealth Hill. Data release made in lieu of submitting a joint partial surrender report for ELs 5799, 6166 and 6348: all project licences' joint annual reports for the period 21/3/2015 to 30/6/2019.
An agglomeration of exploration licences which partly surrounds the Challenger gold deposit at distances of between 35 and 80 km is being explored for similar type economic lode gold mineralisation that may exist in buried Archaean bedrock relatively...-
Document
-
Midgerie, Barton South, Immarna, Barton Siding, Mount Christie Siding, Lake Bring, Mulgathing, Wynbring (TARCOOLA and BARTON 1:250k mapsheets region). Joint progress reports and final reports, for the period 11/4/1981 to October 1990.
Stockdale's exploration for diamonds in the Barton region, at the start of the licence period, commenced with the evaluation of 136 potential kimberlite targets generated by the detailed in-house interpretation of data acquired from an extensive new...-
Document
-
Mount Willoughby, Marla, Nicholson Hill, Hope, Manya, Emu, Moorefield, Lake Meramangye, Dingo Claypan and Alinya (Officer Basin). Progress, technical and partial relinquishment reports for the period 20/8/1980 to 19/8/1985.
TRONA EXPLORATION: Of the 9 rotary/diamond holes drilled, only the first, Meramangye 1, intersected a unit equivalent to the Observatory Hill Beds, which was the target horizon for trona. Drillholes Manya nos 2-6 and Marla 7 intersected Cambrian red...-
Document
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Woomera Project. Joint annual reports for the period 29/9/2008 to 15/6/2017. Includes information status for EL 6085 at licence expiry, for period 16/06/2017 to 01/01/2023: no work performed.
No field work was performed on the three subject licences during the period 2008-2010 inclusive. During 2010, Dominion Gold Operations undertook a desktop evaluation of the possible iron ore potential of the licences. During 2011, the licensee...-
Document
Published: 01 Jan 1923
-
Andamooka Ranges, Island Dam and Stuart Shelf (part of the Stuart Shelf Project). Joint third partial surrender report, for the period 16/1/1981 to 25/9/2018.
There is a long history of exploration on the subject three Stuart Shelf tenements, with first tenure originally taken up in 1981. A summary of significant exploration activities conducted on the three now relinquished ground portions is believed by...-
Document
Published: 22 Nov 1918
-
North-eastern Officer Basin area. Progress reports and final report to licences' joint full surrender, for the period 20/8/1980 to 8/11/1986.
Exploration for trona and base metals was centred on the Marla region. Work included regional gravity and magnetic studies, acquisition of airborne magnetic and multi-channel radiometric data, with follow-up ground magnetic and gravity surveys,...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : South Gawler Project. Joint annual technical report for the period 01/01/2017 to 31/12/2018.
Southern Gawler Ranges Project. This Report has been prepared by Terramin Australia Ltd on behalf of Menninnie Metals Pty Ltd (a 100% subsidiary of Terramin Australia Ltd). The Southern Gawler Ranges Project forms the eastern part of the Gawler...-
Document
-
Poondinga, Jellabinna, Pureba North, Kalanbi, Penong, Chinta and Ceduna (the Eucla Basin Heavy Mineral Sands Project tenement Group 2). Joint annual reports for the period 2/11/2004 to 30/9/2015.
Iluka Resources’ Eucla Basin Heavy Mineral Sands Project tenement Group 2 consisted initially ELs 3268, 3283, 3322 and 3330, which spanned the south-eastern portion of the Eucla Basin, extending from 24 km to 140 km north of Ceduna. Regionally, the...-
Document
Published: 28 Feb 1916
-
Data release - as updated : Gum Flat, Wanilla, Cummins, Tarlinga and Yeelanna (the Gum Flat Iron Ore Project). Joint annual reports submitted until the joint full surrender of remaining project licences, for the period 1/7/2010 to 18/01/2022.
During 2010-2011, the third year of the Gum Flat Iron Ore Project, owner Lincoln Minerals' exploration activities included: - Planning, site preparation and supervision of an RC and aircore drilling program; - Surveying and vegetation clearing for...-
Document
Published: 09 Jan 1920
-
Warrina North, Warrina South, Mount Brady, Yarrabolina Hill, Mount Woods and Kangaroo Dam (the Mount Woods JV Project). Joint annual reports [on JV partners' independent exploration programmes] for the period 1/5/2010 to 31/1/2017.
During the 2011-2012 project reporting period, exploration activities within the Mount Woods Project area which were conducted by OZL primarily targeted IOCG style mineralisation. Work included: · a continuation of office-based target generation and...-
Document
-
Blowout, Campfire Bore, Mulgathing, Jumbuck, Mobella and Sandstone (the Gawler Project Central Tenements Area). Joint venture operators' separate joint annual reports for the period 1/7/2010 to 30/6/2017.
Work targeting Archaean to Proterozoic iron ore in BIF that was carried out by the Iron Road JV partners during 2010-2011 comprised studies of the geological setting and physical characteristics of magnetite iron mineralisation delineated by Stage I...-
Document
Published: 30 Nov 1918