-
RB 35/00042 Nairne pyrite milled on a pilot scale. Iron sulphides concentrated in a flotation pilot plant operated by the South Australian Department of Mines.
There is no abstract created for this record-
Document
Published: 01 Jan 1953
-
RB 41/00100 1: Mining industry developments during 1953-54 and prospective developments for 1954-55. 2: Annual report of the Director of Mines, 1953 with appendix, The establishment of an integrated steel industry in South Australia.
There is no abstract created for this record-
Document
Published: 01 Jan 1955
-
RB 54/00055 Summary report on the investigation of the Razorback Ridge deposit (Braemar Iron Formation).
Sturtian glacial sediments south of Yunta contain haematitic and magnetitic siltstones (banded iron formation) and haematitic and magnetitic tillites formed by chemical deposition of magnetite euhedra in a finer grained haematite groundmass. Both...-
Document
Published: 09 Mar 1962
-
RB 46/00184 Trial blasting with ammonium nitrate and diesel oil at Iron Knob.
The use of ammonium nitrate mixed with carbon as an explosive has been pioneered in the United States of America. Advantages: The advantages are that ammonium nitrate can be freighted in bags by rail, truck, or ship similarly to superphosphate at much...-
Document
Published: 01 Jan 1958
-
RB 79/00028 Wilgena Hill jaspilite.
A strikingly attractive red and black banded iron formation of Proterozoic age outcrops at Wilgena Hill, 14 km east of Tarcoola. The iron formation is fine-grained, finely laminated and polishes to a high finish. Reserves of banded iron formation...-
Document
Published: 01 Jan 1979
-
RB 91/00085 Mineral occurrences of the KIMBA 1:250 000 map sheet area.
There is no abstract created for this record-
Document
Published: 01 Sep 1991
-
RB 96/00035 South Australian Steel and Energy Project. Geotechnical logging of boreholes from iron ore deposits.
Mines and Energy South Australia are currently investigating the geometry and ore grades of banded iron formation deposits within the Gawler Craton near Coober Pedy, for possible use in the production of pig iron. Core samples from five diamond cored...-
Document
Published: 01 Nov 1996
-
Data release - as updated [made at SA Director of Mines' discretion] : Johns Outstation / Giffen Well. Annual reports for the period 8/10/2007 to 7/10/2018.
To date, land access restrictions imposed by the Commonwealth Department of Defence have prevented any field work from occurring on the subject tenement, taken up to cover the Giffen Well magnetite iron ore deposit and adjacent inferred prospective...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2005 to 6/11/2010. [ Index Part 2 of 2 ].
During the first year of renewed tenure under EL 3445, the work done consisted of performing diamond and RC drilling programmes which were partly funded by PIRSA's PACE Initiative as Theme 2, Year 2 and 3 approved Drilling Collaboration Projects. The...-
Document
-
Olary (part of the Braemar Iron Project). Annual reports to licence expiry/cancellation, for the period 20/9/2010 to 19/9/2015.
A licence area in the Olary district comprising three separate sub-blocks has been explored for possible economic stratabound iron ore occurrences within partly concealed Neoproterozoic bedrock. The subject ground was taken up by Wentworth Metals...-
Document
-
Manunda, Tiverton Outstation, Iron Peak and Pualco Range (the Razorback Ridge Iron Ore Project, later the Mawson Iron Project). Joint annual reports for the period 10/12/2009 to 9/12/2016.
Three adjoining licence areas in the Baratta Trough within the northern Nackara Arc have been taken up to explore for possible economic buried Neoproterozoic metasedimentary semi-stratabound iron ore. Central EL 4267 covers ~3 km strike length of the...-
Document
-
Razorback Ridge. First partial surrender report, for the period 7/5/2015 to 6/5/2018.
A small licence area centred ~ 28 km south-southeast of Yunta which consists of two separate sub-blocks is being explored for possible economic stratabound iron ore mineralisation that could occur within buried glacial tillitic/siltstone strata of the...-
Document
-
Outalpa [Siding - West]. Annual reports to licence forfeiture/cancellation, for the period 30/4/2015 to 20/6/2019.
A licence area centred ~25 km west of Olary township has been explored for possible economic stratabound iron ore mineralisation that could occur within buried glacial tillitic/siltstone strata of the Neoproterozoic Braemar Ironstone, beneath sparse...-
Document
-
Braemar. First partial surrender report, for the period 30/4/2015 to 29/4/2018.
A small licence area centred ~ 55 km south-east of Nackara, which consists of three separate sub-blocks, is being explored for possible economic stratabound iron ore mineralisation that could occur within buried glacial tillitic/siltstone strata of...-
Document
-
Braemar. Annual reports to licence forfeiture/cancellation, for the period 30/4/2015 to 20/6/2019.
A small licence area centred ~ 55 km south-east of Nackara, which consisted of three separate sub-blocks, has been explored for possible economic stratabound iron ore mineralisation that could occur within buried glacial tillitic/siltstone strata of...-
Document
-
Olary. Annual reports to licence forfeiture/cancellation, for the period 30/4/2015 to 16/7/2019.
A licence area which consists of three separate sub-blocks located ~45 km WNW and ~5 km and 35 km ENE of Olary township has been explored for possible economic stratabound iron ore mineralisation that could occur within buried glacial...-
Document
-
Outalpa [Siding - East]. Annual reports to licence forfeiture/cancellation, for the period 30/4/2015 to 20/6/2019.
A licence area centred ~5 km WSW of Olary township has been explored for possible economic stratabound iron ore mineralisation that could occur within buried glacial tillitic/siltstone strata of the Neoproterozoic Braemar Ironstone, beneath sparse but...-
Document
-
Bindarrah. Annual reports to licence forfeiture/cancellation, for the period 30/4/2015 to 16/7/2019.
A licence area which consists of two separate small sub-blocks located ~35 km NE of Olary township has been explored for possible economic stratabound iron ore mineralisation that could occur within buried glacial tillitic/siltstone strata of the...-
Document
-
Razorback Ridge. Annual reports to licence forfeiture/cancellation, for the period 7/5/2015 to 20/6/2019.
A small licence area centred ~ 28 km south-southeast of Yunta, which consists of two separate sub-blocks, has been explored for possible economic stratabound iron ore mineralisation that could occur within buried glacial tillitic/siltstone strata of...-
Document
-
SADM / Amdel Project 1/1/177 : Geochemistry of South Australian copper gossans and other ironstones. Progress reports 1 and 2 for the period May 1976 to August 1977.
85 samples of potential mineral deposit- related surface ironstones (68 copper gossans, 6 lead-zinc gossans and 11 false gossans) were analysed chemically and examined mineragraphically in polished section to try to determine geological parameters...-
Document
Published: 12 Aug 1977