-
Mount Painter district (the Gunsight Joint Venture Project). Individual licence's progress reports and annual reports to project licences' joint full surrender, for the period 1/12/1982 to 16/11/1993.
There is no abstract created for this record-
Document
-
RB 41/00100 1: Mining industry developments during 1953-54 and prospective developments for 1954-55. 2: Annual report of the Director of Mines, 1953 with appendix, The establishment of an integrated steel industry in South Australia.
There is no abstract created for this record-
Document
Published: 01 Jan 1955
-
RB 78/00152 Murnaroo 1. Well completion report.
During September-December 1976, Murnaroo 1 was drilled by the SA Department of Mines to TD 627.5 m near Observatory Hill in the central southern part of the Officer Basin, to investigate the local subsurface stratigraphy and economic potential, and...-
Document
Published: 01 Jul 1979
-
RB 93/00026 Pulpara Kia Ora Bendigo bedrock drilling programme, 1992.
During the period September to December 1992, as part of the SA Exploration Initiative (SAEI), SADME completed an investigative drilling programme of concealed bedrock in the area of the Delamerian Bendigo Granite and surrounding metasediments of...-
Document
Published: 01 Jun 1993
-
RB 98/00010 Regolith studies related to the Challenger gold deposit, Gawler Craton, South Australia. Geochemistry and stratigraphy of the Challenger gold deposit - Volume 1: text, and Volume 2: appendices.
The Challenger gold deposit lies in the northern Gawler Craton, South Australia, 750 km NW of Adelaide, and 140 km NW of Tarcoola. A 1.5 km traverse (the regolith line) was chosen for the study of geochemical dispersion and regolith stratigraphy...-
Document
Published: 01 Mar 1998
-
RB 98/00008 Geochemical studies of the regolith at the Mount Gunson copper deposits, Stuart Shelf, South Australia.
The principal objective of the Cooperative Research Centre for Landscape Evolution and Mineral Exploration (CRC LEME) Shields Program and the Primary Industry and Resources of South Australia (PIRSA) Regolith Terranes Group in South Australia is to...-
Document
Published: 01 Feb 1998
-
RB 98/00026 Partial leach geochemical survey, Monarto South, South Australia.
A partial leach soil geochemical survey has been conducted over shallowly buried Cambrian Kanmantoo Trough metasediments in the Monarto South area. The survey was designed to cover a aeromagnetic high anomaly, that is interpreted to be related to a...-
Document
Published: 01 Apr 1998
-
RB 93/00004 Tarcoola - Tallaringa bedrock drilling 1991. Summary.
Archaean and Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...-
Document
Published: 01 Feb 1993
-
RB 94/00022 Review of heavy mineral sand exploration in South Australia - Eucla Basin.
The Cainozoic Eucla Basin has been the focus of recent heavy mineral exploration due to the recognition of Tertiary coastal features including the Ooldea Range. Hypsometric and Landsat data, together with detailed work on the Tertiary stratigraphy of...-
Document
Published: 01 Jun 1994
-
Black Hill Intrusive Complex (northern [Bower - Florieton] and southern [Cambrai] areas). Joint annual report plus final report to licences' joint expiry/full surrender, for the period 17/2/2005 to 16/2/2007.
Inco Resources has been exploring the outcropping portion of the Ordovician Black Hill Intrusive Complex for possible Voisey's Bay style nickel, copper and platinum group element (PGE) mineralisation since 2004, when it signed a joint venture...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
A petrographic study of regolith samples from the Challenger Project, Gawler Craton, South Australia.
60 weathered rock samples collected from the overburden to the Challenger gold deposit in South Australia have been studied using petrographic and carbonate staining methods. Most of the samples represent near-surface regolith materials taken from...-
Document
Published: 26 Feb 1998
-
Caltowie. Annual reports to licence expiry/full surrender, for the period 18/12/1995 to 17/12/1997.
Exploration for Cu-Au deposits associated with possible intrusive plutons in the Caltowie area, 5 km north-east of Gladstone, comprised a review of previous company geochemical data, gravity surveying to confirm an existing anomaly (97 new stations...-
Document
-
Tarcoola - Tallaringa Bedrock Drilling Project.
Archaean, Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...-
Document
-
Unalla Hill, Moonaree and South Lake Gairdner (Lake Gairdner Project). Annual and final reports for the period 25/10/96 to 24/10/99.
Exploration targeted Olympic Dam style mineralisation associated with Hiltaba Suite intrusives and Gawler Range Volcanics at the southern end of Lake Gairdner, between Mount Ive and Moonaree. Sampling of poorly developed calcrete together with rock...-
Document
Published: 02 Dec 1998
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Moseley Nobs (part of the Wilcherry Project). First partial surrender report, for the period 23/3/2017 to 22/3/2019.
The easternmost and westernmost thirds (portions totalling ~52%) of the former area of EL 5931, located approximately 30 km north of Kimba, have been relinquished due to their perceived diminished prospectivity for economic buried occurrences of...-
Document
-
Strathalbyn (part of the Fleurieu Project). Final report at licence full surrender, for the period 4/6/2007 to 10/4/2019.
Base metal exploration of buried Cambrian metasediments, undertaken over part of the Bremer River valley located east and south-east of Strathalbyn, has consisted of a review of historical exploration results, limited new geochemical sampling of...-
Document
-
Todmorden (part of the Mount Sarah Project). Final report to licence expiry/full surrender, for the period 8/3/2018 to 7/3/2020.
An area located immediately west of Mount Alice on Todmorden Station has been explored for possible buried economic IOCG type basement-hosted mineralisation, that may have formed within Paleo to Mesoproterozoic rocks like those hosting IOCG deposits...-
Document
-
Pinkawillinie (part of the Wilcherry Project). Final report at licence full surrender, for the period 1/11/2012 to 10/4/2019.
An area originally consisting of three separate licence sub-blocks that are centred ~30 km north-west of Kimba has been explored for possible economic buried occurrences of basement-hosted epithermal/hydrothermal/metamorphic gold, silver, iron,...-
Document