-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Woomera, Portulacca Ridge and Red Lake. Joint final report at licences' joint full surrender, for the period 15/2/1983 to 7/11/1986.
The three licences now being surrendered were originally taken out by Seltrust in the mid-1970s to search for stratabound base metals and Olympic Dam type mineralisation. After Seltrust withdrew from the subsequently formed Stuart Shelf joint venture...-
Document
-
RB 87/00039 Results of SADME diamond drilling, Waukaringa Goldfield, 1985.
8 fully cored diamond holes tested possible fold structures near old mines, for Telfer type stratabound gold mineralization in shoots similar to those mined in the Alma and Victoria mines. 5 distinctive auriferous reefs were intersected in each...-
Document
Published: 01 Jan 1987
-
Coondambo. Second partial surrender report, for the period 7/6/2001 to 6/6/2009.
As part of a search for possible buried economic Olympic Dam type IOCG-U deposits in volcanic basement, or for stratiform Athabasca Basin type uranium occurrences in the overlying cover, farminee Marathon Resources carried out detailed calcrete...-
Document
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release made upon the expiry/full surrender of subsequent licences : respective annual and joint annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 1 of 2 ].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. The subject two areas covering the northern outcropping Peake and Denison Ranges basement inliers were taken up by Pancontinental Mining to test for possible...-
Document
-
Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 1 of 4 ].
The abstract for this Envelope is contained (in three parts) as separately indexed records, due to SAMREF database system individual record data size limits presently applicable.-
Document
-
Woorong Creek. Annual and final reports to licence expiry/full surrender for the period 7/3/2006 to 6/3/2008.
Exploration for possible economic, Mesoproterozoic basement-hosted iron oxide - associated copper-gold-uranium (IOCGU) deposits, within an area lying 40 km west-northwest of Coober Pedy, primarily addressed a strongly expressed northeast-trending...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-19, Murninnie mine area (north-eastern Spencer Domain) IOCG mineral prospects. Project final report.
The Murninnie Cu-Bi-Au deposit and mine environs, located approximately 40 km south-west of Whyalla, have not been seriously explored in more than 50 years due to quarantining of the deposit under Private Mine title. The lode-style deposit is exposed...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-38, Central Gawler Gold Province, Barns West and Baggy Green North gold prospects. [8 x RC drillholes] Project final report.
PACE Initiative Year 3 drilling project funds were secured by Adelaide Resources to evaluate a number of previously detected IP anomalies inferred to originate from sources in the Mesoproterozoic basement and saprolitic cover in the vicinity of the...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-57, Streaky Bay area gravity highs and lows - IOCG and sedimentary uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 subsidised drilling programmes, Minotaur Exploration proposed exploring a large tenement package in the Streaky Bay area simultaneously for Prominent Hill style iron oxide copper gold (IOCG) and palaeochannel...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Kottata Well and Broadacres (part of the Yaninee Project). Final report at licences' joint full surrender, for the period 29/9/2003 to 5/6/2008.
Mineral exploration in the Streaky Bay district has addressed the potential for finding Prominent Hill - style Proterozoic IOCG deposits, Phanerozoic iron-depleted gold mineralisation, and Tertiary palaeochannel - hosted sedimentary uranium...-
Document
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kainton, Melton and Paskeville (the Melton Project). Joint annual reports for the period 27/8/2007 to 26/8/2019.
Exploration for possible buried sandstone-hosted uranium mineralisation which could have formed within early Tertiary palaeochannel sediments of the northern Saint Vincent Basin is being carried out in a small area near Kainton on north-eastern Yorke...-
Document
-
Princess Royal, Burra West, Burra North, Florieton, Mount Bryan, Burra Central, Mongolata, Redbanks, Hallett Hill and The Gums (the Burra Project tenement group). Joint annual reports for the period 1/5/2009 to 30/4/2017.
A multi-licence project area centred on the historic abandoned Burra copper mine is being explored for possible economic, buried Burra type copper oxide and copper carbonate mineralisation that may have formed within Neoproterozoic metasedimentary...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2005 to 6/11/2010. [ Index Part 2 of 2 ].
During the first year of renewed tenure under EL 3445, the work done consisted of performing diamond and RC drilling programmes which were partly funded by PIRSA's PACE Initiative as Theme 2, Year 2 and 3 approved Drilling Collaboration Projects. The...-
Document
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
Roopena and Iron Knob. Joint progress reports, joint annual reports and final report to licences' joint full surrender, for the period 22/4/1992 to 23/2/2000.
Exploration for Mount Isa style, Fe-oxide associated Cu-Au mineralisation has targeted Whyalla Group metasediments and associated Hiltaba Suite granitic intrusions within a 110 km long x 15 km wide, north - south aligned corridor situated west of...-
Document