-
Trans-Australia Seismic Survey (TASS) 1972 - operational report.
During 1970/71, two large explosions set off at the Ord River Dam building site in Western Australia were recorded on 2000 km long land-based shot recording lines by the BMR and a number of university seismic research groups, and the results were used...-
Document
Published: 01 Jan 1974
-
Amdel service work report on uranium-lead [radiometric] dating of an outcrop sample [of the Boucaut Volcanics].
An absolute age of 677 Ma +/- 12 Ma was determined from analyses of six selected zircon grains separated from the subject volcanic rock sample, but the result is strongly affected by the need to impose large corrections to the data to compensate for...-
Document
Published: 06 Oct 1988
-
Criteria for the Abandonment of Seismic Lines and Wellsites in the South Australian Portion of the Cooper Basin - Stage 2 Identification and Evaluation of Assessment Criteria.
This review is aimed at identifying and assessing the impacts of seismic lines and wellsites in the South Australian area of the Cooper Basin. The impacts are assessed in terms of their relative significance (adverse or long lasting effects) to the...-
Document
Published: 01 Feb 1997
-
Criteria for the Abandonment of Seismic Lines and Wellsites in the South Australian Portion of the Cooper Basin - Stage 3 Validation of Assessment Criteria and Methodologies.
This review is aimed at identifying and assessing the impacts of seismic lines and wellsites in the South Australian area of the Cooper Basin. The impacts are assessed in terms of their relative significance (adverse or long lasting effects) to the...-
Document
Published: 01 Aug 1997
-
South Australian Magnesium Metal Project.
There is no abstract created for this record-
Document
-
Significance of silica cements for the identification of silcrete generations around Coober Pedy.
There is no abstract created for this record-
Document
-
TEISA Coober Pedy Drilling Project.
There is no abstract created for this record-
Document
-
Clare Valley groundwater resources. Progress report 4: drilling Phases III and IV.
Two additional phases of the drilling program to assess the groundwater resources in the Clare Valley were undertaken during March 1998 at Wendouree (Phase III), and during July 2000 at Wendouree and Watervale Oval (Phase IV). The Phase III program...-
Document
-
Statement of environmental objectives: geophysical operations.
This document details the environmental objectives for geophysical exploration activities that are required to be achieved by any licensee operating in the South Australian part of the Cooper Basin and adjacent areas as indicated in Figure 1. It...-
Document
-
Definition of major sedimentary and igneous units of the Olary Domain, Curnamona Province.
This paper introduces a formal lithostratigraphic scheme for major subdivisions of the Olary Domain, and compares these subdivisions to those of the Broken Hill Domain, these two domains being the main components of the Curnamona Province. The scheme...-
Document
-
Kangaroo Flat hydrogeological investigation - Well drilling.
The Department for Water Resources drilled three wells at Kangaroo Flat in October and November 2000 as part of a hydrogeological investigation of the area. The wells were drilled as observation wells, and water levels will subsequently be monitored...-
Document
-
Mintaro Slate and Flagstone - more than 150 years of production.
Mintaro Slate is produced from what is believed to be the oldest continuously operating quarry in Australia. The quarry was opened in the early 1850s, after Mintaro farmer Peter Brady discovered outcrops of slate in a creek bed on his property and...-
Document
-
Dating of samples from the Yorke Peninsula palaeochannel.
There is no abstract created for this record-
Document
-
Yalarna. Progress reports and final report to licence expiry/full surrender, for the period 4/9/1980 to 3/9/1982.
In a search for East Alligator River - type metamorphic uranium deposits, a review of previous geophysical data plus the conduct of ground and airborne radiometric surveys disclosed a number of anomalies in an area on central Eyre Peninsula extending...-
Document
-
Mount Mitchell. Progress reports and final report to licence full surrender, for the period 20/10/1980 to 19/10/1982.
Exploration was undertaken for lode and alluvial tin mineralisation which might exist within ground adjacent to the abandoned Mount Mitchell tin mine, and also for reef gold in altered granite and dolerites outcropping adjacent to the numerous small...-
Document
-
Lake Yantawena (West). Progress and final reports for the period 26/11/1970 to 25/11/1972.
Acquisition and interpretation of an airborne scintillation spectrometer survey, and the unhindered drilling and gamma and electric logging of 16 rotary open holes (total 3242 feet), were undertaken. Lower Tertiary non-marine palaeochannel sand...-
Document
Published: 09 Feb 1973
-
Lake Frome area. Progress reports for the period 20/11/1969 to 19/11/1970.
Ongoing exploration for sedimentary uranium deposits and other radioactive minerals, in the plains area north-west of Lake Frome, consisted of the drilling and geophysical logging of 56 rotary holes for a total of 29,708 feet. Drillhole 355-1, which...-
Document
Published: 20 Aug 1970
-
Parabarana. Progress and technical reports to licence expiry/full surrender, for the period 18/5/1972 to 17/5/1974.
Under a joint venture agreement made between North Flinders Mines and Dampier Mining Co. (a BHP Exploration subsidiary), operative over the 7 square mile SML 705 between 14/9/1973 and 14/3/1974, at least 3500 feet of additional appraisal diamond...-
Document
-
Copper Hill [and Cameron Hill]. Progress reports and joint final report to licence expiry/full surrender, for the period 12/10/1972 to 11/2/1974.
In a search for possible economic Permian coal seams buried at the southern end of the Boorthanna Trough of the Arckaringa Basin, the Petromin joint venture consortium selected an area to drill where it was inferred that such coal might lie within 300...-
Document
-
Mount Frome. Progress and final reports to licence expiry/full surrender for the period 22/10/1973 to 21/10/1974.
A re-investigation of base metal geochemical anomalies detected during Electrolytic Zinc Co.'s former stream sediment and rock chip sampling programme conducted near an historic copper-lead mine prospect at Mount Chambers in the eastern Flinders...-
Document
Published: 06 Sep 1974