-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 3 partnership no. DPY3-28, Mount Woods IOCG Project mineral prospect. Project final report.
PACE Initiative Year 3 drilling project funds were secured by Goldstream Mining to explore for base metals and gold within two licence areas taken out over concealed Proterozoic basement of the Mt Woods Inlier, and which also cover parts of the Coober...-
Document
Published: 12 Dec 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-19. White Hill igneous complex Proterozoic magmatic PGE-Ni-Cu mineral prospects. Project final report.
Following a review of historic exploration data for the Mount Woods Inlier, OZ Minerals decided that the White Hill igneous complex, located 6 km north-west of the Prominent Hill mining lease, is comprised of mafic and ultramafic cumulate rocks having...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2000 to 6/11/2010. [ Index Part 1 of 2 ].
The large Kangaroo Dam exploration licence covers the mostly concealed western portion of the Palaeoproterozoic Mount Woods Inlier, a large block of variable magnetic intensity lying to the east and south-east of the Coober Pedy Ridge and the Mabel...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2005 to 6/11/2010. [ Index Part 2 of 2 ].
During the first year of renewed tenure under EL 3445, the work done consisted of performing diamond and RC drilling programmes which were partly funded by PIRSA's PACE Initiative as Theme 2, Year 2 and 3 approved Drilling Collaboration Projects. The...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Hawks Nest. Annual reports to licence expiry/renewal, for the period 12/3/1999 to 11/3/2004.
An area comprising two separate sub-blocks centred ~115 km south-southeast of Coober Pedy and located to the west of the Stuart Highway is being explored for Archaean to Palaeoproterozoic banded iron formation iron ore mineralisation of economic...-
Document
Published: 05 Feb 1904
-
Data release [made at SA Director of Mines' discretion] : The Twins (part of the South Mount Woods Joint Venture). Annual reports to licence expiry/renewal, for the period 7/3/2002 to 6/3/2007.
An area covering ground adjacent to the southern boundary of current EL 3056 (formerly EL 2483), on which licence the newly discovered (in November 2001) Prominent Hill IOCG deposit is situated, is being explored for similar style buried...-
Document
Published: 03 Apr 1907
-
Balta Baltana Creek. Annual reports to licence expiry/full surrender, for the period 11/8/2016 to 10/8/2021.
A small area centred ~95 km east-southeast of Coober Pedy has been explored for possible buried Olympic Dam style IOCG mineralisation, epigenetic and stratiform base metal deposits and structurally controlled Tennant Creek style orogenic lode gold...-
Document
Published: 22 Oct 1921
-
Mount Woods. Progress reports to licence expiry/full surrender, for the period 1/5/1965 to 31/10/1966.
The results of IP surveys carried out over two aeromagnetic anomalies identified in an area east of Coober Pedy were not sufficiently encouraging to warrant further activity. Thirteen lines spaced 2000 feet apart were profiled, with stations read at...-
Document
Published: 15 Aug 1966
-
Warrina North and Warrina South. Joint third partial relinquishment report, for the period 23/9/1996 to 22/9/2001.
Exploration for iron oxide-hosted gold and base metals over a wide area spreading NW-SE, north-east from Coober Pedy and near Lake Cadibarrawirracanna, was initially by review of historical data and interpretation of airborne geophysical data. A...-
Document
-
Mount Paisley. First partial relinquishment report for the period 23/3/2003 to 22/3/2004.
Proterozoic iron oxide copper-gold mineralisation of the Olympic Dam style was the target of exploration in the Mt Paisley area, 145 km south-east of Coober Pedy. Extensive re-interpretation and evaluation of available regional geophysical data...-
Document
-
Safari, Lake Woorong, Leonard Rise, Thunderstorm Creek and Brumby Creek areas (Coober Pedy Ridge Project). Quarterly and six-monthly progress, plus annual and final, joint activity reports for the period 22/4/1991 to 22/3/2000.
The Coober Pedy Ridge / Mount Woods Inlier project investigated a 170 km long east-west belt of medium to high grade Proterozoic metamophics and syn- and post tectonic granites, centred 25 km south of Coober Pedy, for Broken Hill type stratiform...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-47 - [prospecting for] water in Permian palaeochannels draining the Mount Woods Inlier. Project final report.
Development of the Prominent Hill copper-gold deposit in the Mount Woods region will require an adequate source of water to support planned mining and ore processing operations, currently estimated to involve at least 6 million tonnes of ore per year....-
Document
Published: 10 Jun 1905
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-13, Gemini mineral prospect. Project final report.
The Mount Woods South Joint Venture (Adelaide Resources Ltd and Perilya Ltd) successfully made application for a share of the SA Government's PACE Initiative funding in 2004 to test geophysical anomalies located on EL 2901 which were defined by...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [Index Part 1 of 2 ].
An area centred approximately 50 km south-east of Coober Pedy has been taken up after it was surrendered early in 2000 by the BHP Minerals / Western Mining Corp. joint venture consortium (cf. Env 8434). The main mineral commodities now being sought by...-
Document
-
The Gawler Craton Project [Part]. Data release made in lieu of partial surrender/joint annual reports for the period 3/2/2010 to 1/2/2019, plus letters giving permission to release owed licence partial relinquishment and surrender reports.
As part of a regional search for possible major deposits of IOCG type mineralisation, Golden Cross Resources took up six exploration tenements in the northern Gawler Craton that lie to the north and north-east of Coober Pedy, and which are within or...-
Document
Published: 23 Jun 1915
-
Anna Creek. Annual reports to licence expiry/full surrender, for the period 9/4/2019 to 8/4/2021.
A large area centred ~10 km north of The Mulgas Outstation on Anna Creek Station, and lying ~80 km north-east of Prominent Hill, has been explored for inferred buried IOCG-U type volcanic breccia deposits which might exist in Proterozoic basement...-
Document
Published: 27 Apr 1921
-
The Northern Gawler Project. Data release made in lieu of submitting partial surrender reports for ELs 5566 and 5567 upon renewal of those licences : joint annual reports for the period 1/2/2015 to 31/1/2020.
Portions of two tenements located to the south and south-east of Coober Pedy were relinquished at the start of 2020, and all mineral exploration data previously acquired by licensee Southern Iron on these tenements and on four others that now comprise...-
Document
Published: 28 May 1920
-
Balta Baltana Creek. Annual reports to licence expiry/full surrender, for the period 21/1/2010 to 20/1/2015.
An area located within the Mount Woods Inlier in the north of the Gawler Craton, which is centred ~70 km east-southeast of Coober Pedy, has been explored for possible economic buried Prominent Hill type IOCG mineralisation. No past mineral exploratory...-
Document
Published: 02 Feb 1915
-
Warrina North & South and Yarrabolina Hill (formerly part of the Cairn Hill Iron Ore Project, subsequently part of the Mount Woods JV Project). Joint final report report at licences' joint full surrender, for the period 1/5/2010 to 16/11/2017.
No work has been conducted on any of the three subject tenements during the reporting period. IMX Resources' exploration attention prior to the tenements' handover date was focussed on the Mount Woods Joint Venture with OZ Minerals, which was...-
Document
Published: 01 Sep 1917