-
Moonabie Homestead. Progress reports and final report to licence expiry/full surrender, for the period 2/7/1984 to 1/7/1986.
Exploration of a thick sequence of Middle Proterozoic sediments and volcanics deposited within the Moonabie Graben, and regarded as similar in age and tectonic setting to that seen at Olympic Dam, has comprised aerial magnetic, radiometric and INPUT...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 2 of 2].
The Telephone Dam lead-zinc-silver prospect is located in the north-eastern part of the now renewed Wilcherry Hill EL 4162. During the 1980s and 1990s, diamond, RC and RAB drilling done on this prospect by Aberfoyle Resources had identified a...-
Document
Published: 31 Dec 2008
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
ExpNotes YARDEA: Explanatory Notes YARDEA, SI 53-03.
The YARDEA 1:250,000 scale regional geological map area straddles the southern margin of the Gawler Ranges on northern Eyre Peninsula. The only major township within the area is Minnipa, with Kimba and Wudinna both located immediately south of the...-
Document
-
RB 2006/00020 Compilation of SHRIMP U-Pb geochronological data for the Gawler Craton, South Australia, 2006
This report book contains zircon - derived U-Pb geochronological data, which was obtained between January 2005 and April 2006, for basement rock samples taken from the Gawler Craton of South Australia. The data has been generated as part of the...-
Document
Published: 01 Nov 2006
-
ExpNotes LINCOLN: Explanatory Notes LINCOLN, SI 53-11.
The LINCOLN 1:250,000 scale regional geological map area covers southern Eyre Peninsula and includes numerous islands lying off its eastern, southern and western coasts. The region encompasses a complex geological history and contains a variety of...-
Document
-
Black Eagle Rock. Annual reports and progress reports plus final report to licence full surrender, for the period 10/1/1997 to April 2001.
Four styles of mineralisation formed the basis for exploration in the Paney-Buckleboo area, namely, stratiform sedex (Broken Hill style), shear-hosted epigenetic gold and base metals (Tunkillia style), skarn-related gold and base metals (Menninnie Dam...-
Document
Published: 30 Mar 2001
-
Pearlah. Final report at licence full surrender, for the period 10/1/2013 to 17/10/2013.
A small licence area consisting of three separate sub-blocks situated inland to the west from Boston Bay, in that vicinity and at Green Patch and at Wanilla, has been explored for possible economic near surface graphite mineralisation. A desktop...-
Document
Published: 11 Dec 2013
-
The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 2018
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 2008
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-44, Wilgerup (southern Gawler Craton) haematitic iron ore prospect. Project final report.
Centrex Metals commenced reverse circulation exploration and resource definition drilling at the Wilgerup iron ore deposit on 6/9/2006, which was partly funded by the PACE Initiative as a Year 3 approved project, with funds allocated for 1000 m of RC...-
Document
Published: 20 Apr 2007
-
Wilcherry Hill. Data release made in lieu of submitting a first partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 8/9/1980 to 15/4/2003.
[incomplete : to be continued when time permits] - The Wilcherry Hill licence area was originally taken up in September 1980 by the Shell Company as EL 719, forming part of a larger regional mineral exploration tenement package on northern and...-
Document
Published: 14 Dec 2005
-
Stony Hill (part of the Northern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 2/12/2004 to 23/12/2016.
During the life of the subject licence, the focus of exploration was to determine the area's potential for DSO haematite iron ore, with a secondary consideration being magnetite and haematite BIF. After conducting geophysical surveys and exploratory...-
Document
Published: 17 Jan 2017