-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Kingoonya. Annual reports and final report to licence full surrender, for the period 27/11/2006 to 21/4/2015.
An area surrounding the township of Kingoonya and straddling the Trans Australia Railway line, that comprises six tenement sub-blocks,has been explored for possible economic occurrences of buried Tertiary roll-front style secondary uranium...-
Document
Published: 23 Apr 1915
-
Comet Outstation, Gina Outstation, Commonwealth Hill Station - Central and East, and Aurora Tank areas (the Commonwealth Hill Project). Joint annual reports for the period 15/12/2008 to 30/6/2013.
A group of contiguous exploration licences centred ~100 km south-west of Coober Pedy are being explored principally for epithermal and Challenger-style gold mineralisation hosted by covered Archaean basement rocks, as well as for any economic base...-
Document
Published: 31 Aug 1913
-
Data release [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports to licence expiry/renewal, for the period 17/2/2005 to 16/2/2010.
Tasman Resources is exploring an area that is centred about 78 km north-west of Tarcoola for possible economic buried occurrences of sedimentary roll front style uranium in Tertiary palaeochannels and nickel mineralisation in Archaean -...-
Document
Published: 19 Apr 1910
-
Lake Anthony. Quarterly reports, first joint annual report (with SML 711) and joint final report to licence full surrender, for the period 1/9/1971 to 31/5/1973.
An area located just to the east of the edge of the Nullarbor Plain, occupied by many scattered large and small salt lakes surrounded by sand dunes, with Precambrian basement [of the western Gawler Craton] subcropping near the surface, has been...-
Document
Published: 26 Jun 1973
-
Data release - as updated : Lake Woorong. Annual reports to licence expiry/full surrender, for the period 8/6/2012 to 7/6/2019.
A large area centred ~80 km south-west of Coober Pedy has been explored for possible buried economic iron ore, including inferred DSO haematite mineralisation, and for base metal massive sulphide deposits that may have formed in Proterozoic basement...-
Document
Published: 30 Jul 1919
-
Lake Barry, Lepa and Mount Christie. Joint progress reports and final report to licences' joint expiry/full surrender, for the period 16/11/1981 to 15/11/1983.
Intensive surface sampling of mineralogical anomalies associated with possible buried intrusive plugs in the Mount Christie region has recovered one only small diamond, now interpreted as a false source indicator and probably due to laboratory...-
Document
Published: 05 Dec 1983
-
Mulgathing. First quarterly and final report for the period 31/3/87 to 30/6/87.
Exploration for gold and platinum in banded iron formations and ultramafic units of the Mulgathing Complex consisted of reconnaissance rock chip sampling. Assay results provided no encouragement for further work.-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 27/4/2000 to 8/8/2010.
During the sixth licence year, on renewed EL 2717 covering the same area as previously, the licensee, now a wholly owned subsidiary of AuIron Energy Limited (formerly Meekatharra Minerals Limited), progressed its investigations of the geology of the...-
Document
Published: 01 Sep 1916
-
Warrior. Progress reports to licence full surrender, for the period 28/7/1982 to 30/3/1987.
Continuing investigation of the sedimentary uranium potential of the Tertiary Warrior Palaeochannel, in an area 40 km west of Tarcoola, initially comprised undertaking a test radon emanometry survey over a site of known uraniferous roll-front...-
Document
-
Mount Finke [Heartbreak Hill]. Progress reports to licence expiry/full surrender, for the period 28/7/1982 to 27/1/1984.
Exploration of an area extending from 20 km south to 35 km south-west and west of Tarcoola was designed to assess the potential of Archaean to Middle Proterozoic volcanics, granites and sediments for possible gold, base metal or tin deposits of...-
Document
Published: 29 Dec 1983
-
Mount Finke. Progress reports to licence expiry/full surrender, for the period 2/3/1987 to 28/9/1989.
TARGET: Gold in the Mount Finke region. EXPLORATION: A photogeological study, aerial magnetic and radiometric surveys, image processing of aeromagnetic data reprocessed by the BMR, a regional geophysical interpretation, ground magnetic traverses,...-
Document
-
Commonwealth Hill Station - East (part of the Commonwealth Hill Project). First partial surrender report, for the period 2/7/2007 to 1/7/2017.
Five small portions of the subject licence, with a combined total area of 143 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium and base metals. During the period of their tenure,...-
Document
Published: 04 Dec 1917
-
Commonwealth Hill Station - East (part of the Commonwealth Hill Project). Second partial surrender report, for the period 2/7/2007 to 1/7/2019.
Two portions in the north and south of the subject licence area, with a combined total area of 45 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium and base metals. During the period of...-
Document
Published: 30 Jan 1920
-
Blowout, Campfire Bore, Mulgathing, Jumbuck, Mobella and Sandstone (the Gawler Project Central Tenements Area). Joint venture operators' separate joint annual reports for the period 1/7/2010 to 30/6/2017.
Work targeting Archaean to Proterozoic iron ore in BIF that was carried out by the Iron Road JV partners during 2010-2011 comprised studies of the geological setting and physical characteristics of magnetite iron mineralisation delineated by Stage I...-
Document
Published: 30 Nov 1918
-
Indooroopilly, Muckanippie and Commonwealth Hill. Data release made in lieu of submitting a joint partial surrender report for ELs 5799, 6166 and 6348: all project licences' joint annual reports for the period 21/3/2015 to 30/6/2019.
An agglomeration of exploration licences which partly surrounds the Challenger gold deposit at distances of between 35 and 80 km is being explored for similar type economic lode gold mineralisation that may exist in buried Archaean bedrock relatively...-
Document
-
Gina Outstation (part of the Commonwealth Hill Project). Final report at licence full surrender, for the period 1/7/2013 to 3/4/2017.
No field work was performed on the subject licence during its last year of tenure. However, this Envelope contains all of the earlier (including that collected within the last 5 years) licence-specific soil calcrete geochemical, gravity survey and...-
Document
Published: 27 May 1917
-
Commonwealth Hill Station - Central (part of the Commonwealth Hill Project). Second partial surrender report, for the period 11/5/2007 to 10/5/2017.
Six separate portions of the subject licence, with a combined total area of 35 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium, PGEs and base metals. During the period of their tenure,...-
Document
Published: 04 Dec 1917
-
Malbooma. Progress reports and final report to licence expiry/full surrender, for the period 14/9/1987 to 13/3/1990.
TARGET: Gold in Lower Proterozoic rocks of the Tarcoola Formation and part of the Mulgathing Complex, possibly as a metamorphosed equivalent of the high grade gold orebodies of The Granites (Tanami Desert, NT). EXPLORATION: Interpretation of aerial...-
Document
-
Lyons, Mount Christie, Barton, Immarna and Immarna South. Final report at licences' joint expiry/full surrender, for the period 3/6/1983 to 2/6/1988.
TARGET: Possible diamonds in the Barton region. EXPLORATION: Acquisition of an aerial magnetic-radiometric-VLF EM survey (line spacing: 300 m; altitude: 70 m) led to field investigations of 142 potential kimberlite targets generated from this survey...-
Document