-
EPP 32 Annual and Technical reports.
EPP 32 covering 76 graticular blocks (approx. 5300 km2) over the Duntroon Basin was granted to Santos Offshore Pty Ltd on December 13th 2002 for an initial term of 6 years. During their tenure, Santos completed one 2D seismic Survey covering 556 km,...-
Document
-
EPP 26, Duntroon Basin, [migration trap] lead summaries. Fairways: Platypus-Duntroon, Greenly, Outer Basin.
Report summarises the risked volumetric oil potential of leads in the post - Greenly 1 highgraded petroleum migration fairways (Duntroon-Platypus, Greenly and Outer Basin) that were identified in the BHPP Duntroon Basin regional study of December...-
Document
Published: 25 Jul 1995
-
EPP 6, Eucla and western Duntroon Basins. Progress, technical and relinquishment reports for the period 20/9/68 to December 1975.
The programme of work pursued over EPP 6 was as follows: Permit Year 1 - interpretation of 566 line km of regional reconnaisance 6 and 24-fold reflection seismic data recorded in the 1968-69 R 3 Marine Seismic Survey, plus the ongoing review and...-
Document
-
Evaluation report on South Australia offshore permits SA-6 and SA-7.
Based on the latest (R 6 survey) seismic interpretation, after intergration with previous seismic survey results and newly obtained well information, Shell's Duntroon Basin permit areas can now be subdivided into 4 structural zones: (i) a monoclinal...-
Document
-
2003 Duntroon marine seismic survey (DS03 MSS) - EPP 32.
The DS03 seismic survey was acquired by Santos Ltd during 5th-9Th December 2003 using the PGS vessel Orient Explorer. The survey consisted of 556kms of new 2D data and the reprocessing of 2977kms of existing data over 71 lines. All data was processed...-
Document
-
EPP 5. 1973 evaluation report.
Following an unsuccessful attempt at farming out part of EPP 5 in late 1972, Shell resolved to continue exploring that permit area in its own right, subject to the offshore Designated Authority's approval of a variation in permit conditions, which was...-
Document
-
1995 marine seismic survey, HD95, final report.
AIM: To obtain detailed coverage of potential drilling prospects, and add to the regional grid over the permit area. Work would initially focus on the Rocky strong lead, the main permit Year 6 drilling candidate, and then embrace the remaining six...-
Document
-
1973 Shell R 7 Marine Seismic Survey, Great Australian Bight. Reports for the period 5/1/1973 to March 1974.
AIM: The primary aim of the 1973 Shell R 7 Marine Seismic Survey programme was to acquire further detailed coverage over several previously disclosed anticlinal leads within Duntroon Basin EPPs 6 and 7, to attempt to define suitable prospective...-
Document
-
GEOGRAM [synthetic seismogram] processing report for Duntroon 1 well velocity survey of 25/2/86.
There is no abstract created for this record-
Document
Published: 07 Mar 1986
-
1992 DH92 Marine Seismic Survey, EPP 26. Reports.
There is no abstract created for this record-
Document
-
Assessment of the relationship between variations in porosity and reservoir facies (in) EPP 26.
There is no abstract created for this record-
Document
Published: 12 Aug 1996
-
1970-1971 Shell R 5 Marine Geophysical Survey on Petroleum Titles SA-5, SA-6, SA-10 and SA-11. Reports for the period 25/8/1970 to 9/3/1972.
AIM: Shell's R 5 Marine Geophysical (seismic plus magnetic) Survey, the most extensive yet conducted in the SA offshore, was spread over its entire concession area. The object of the seismic work was to define and confirm prospects for drilling in...-
Document
Published: 09 Mar 1972
-
Duntroon 1 core analysis report.
There is no abstract created for this record-
Document
Published: 28 Feb 1986
-
EPP 26, Duntroon Basin. Quarterly progress reports for the period 13/3/91 to 12/6/96.
Reports review the progress of drilling, seismic data reprocessing, seismic data acquisition, seismic data processing and geophysical mapping activities and formal exploration report preparation for 5 years of permit tenure.-
Document
-
1991 marine seismic reprocessing, D83 and D84, final report.
Comprises details of the reprocessing of marine seismic surveys D83 (acquired and processed by GSI in 1983) and D84 (acquired and processed by Western Geophysical in 1984). The reprocessed data yielded generally good data quality, providing improved...-
Document
-
1972-73 marine seismic survey (part of), M/V Petrel, final report.
This report represents an evaluation by Shell's deep water exploration team of geophysical data collected during the 1972-73 survey by the MV Petrel in southern Australia. The Petrel survey was conducted with the object of investigating the...-
Document
-
Geological and petroleum engineering completion report, BP Duntroon 1.
Duntroon 1 was drilled to test the petroleum potential of the Cenomanian Platypus Formation sandstone reservoir within a large tilted Late Cretaceous horst block, the Numbat prospect. A secondary target was the underlying Barremian to Aptian Madura...-
Document
-
EPP 21 Duntroon Basin 1983 geochemical sniffer survey, 1983 marine seismic survey final reports.
2034.81 line km of 240 channel, 60 fold seismic data were recorded from 20.1.83 to 25.2.83. Quality is better than previous surveys because of more sophisticated recording and advanced seismic data processing techniques. The seismic interpretation...-
Document
Published: 01 Jan 1984
-
1982 marine seismic survey, Aywon, final report.
AIM:To obtain regional reconnaisance seismic information to provide support in the reprocessing and reinterpretation of existing data, and to try to broadly identify potential drillable structures within the EPP 19 area and link them to existing well...-
Document
-
Duntroon Basin. [Well critiques].
Contains summary pictorial montages of the operator's post-mortem assessment of the value of drilling each Duntroon Basin wildcat completed to date.-
Document