-
Curnamona Province.
CURNAMONA PROVINCE SUMMARY Age: Sedimentation - late Palaeoproterozoic to early Mesoproterozoic. Felsic and mafic volcanism - late Palaeoproterozoic to early Mesoproterozoic. Granitic intrusion - late Palaeoproterozoic to early...-
Document
Published: 01 Jan 2003
-
Frome Downs Homestead. Progress and technical reports to licence expiry/renewal, for the period 1/1/1969 to 31/12/1970.
Reconnaissance shallow stratigraphic drilling with subsequent borehole geophysical electric and radioactivity logging in the south-western Frome Embayment (21 rotary mud partly cored holes, total 8841 feet), over areas lying adjacent to outcropping...-
Document
Published: 31 Dec 1970
-
Summary report on Honeymoon assessment programme (Phase 1), Honeymoon uranium deposit, South Australia.
This report summarises results of a rotary drilling and coring programme undertaken between 21/10/1978 and 16/2/1979 at the Honeymoon uranium deposit. 99 open plug holes totalling 12,452.7 m and 16 core holes totalling 1894 m were drilled in a...-
Document
-
Lake Frome [part of the Paralana Plains Uranium Project joint venture area]. Progress reports and technical reports to licence surrender/re-issue over a different area, for the period 22/4/1971 to 21/4/1973.
Exploration on SML 564 has consisted of a continuation of deep rotary mud open hole, plug and core drilling plus washing-out of existing, older Petromin "P...w" series drillholes to allow new generation downhole geophysical logging, aimed at further...-
Document
-
Report on recent exploration in SMLs 543, 544, Crocker Well prospect 22, Lake Frome, South Australia.
A 64 line km gravity survey, with stations located at 150 m spacing, was conducted to locate the position of the main Billeroo West palaeochannel within the northern part of SML 543, in order to assess the need to retain under exploration tenure the...-
Document
-
South Eagle. Data release made at transfer of licence ownership : annual reports for the period 17/9/1997 to 16/9/2000.
The majority of mineral exploration undertaken in the South Eagle area, centred 40 km north-east of Olary, has targeted stratabound Pb-Zn-Ag, stratabound massive sulphide Cu-Zn-Co-Mn, and Cu-Au mineralisation that may have formed in Proterozoic rocks...-
Document
-
Yarramba. Progress reports to licence expiry/renewal for the period 8/3/1976 to 7/3/1978.
Ongoing exploration for sedimentary uranium ore deposited in buried 1.5 - 6 km wide and 50 m thick Tertiary palaeochannels in the Yarramba area, located adjacent to the SA-NSW border 50 km northwest of Cockburn, included three detailed and...-
Document
Published: 17 Apr 1978
-
Paralana Creek and Four Mile Creek [part of the Paralana Plains Joint Venture area]. Progress reports for the period 15/4/1968 to 14/4/1971.
A licence area covering the flat alluvial Paralana Plains extending out eastwards from the northern Flinders Ranges was taken up by the the consortium of Exoil NL, Petromin NL and Transoil NL to explore for possible economic buried occurrences of...-
Document
-
Report on drilling results, Beverley prospect, SML 564, Paralana Plains, SA.
Following the February 1972 farm-in of US-based company Western Uranium Ltd (WU) for 42 months to SML 564 in the Lake Frome area of South Australia, a drilling programme was undertaken by it to evaluate a series of buried fluvial uranium occurrences...-
Document
-
Soil and groundwater investigation, Beverley prospect, SML 564. Report on Stage I feasibility study.
The Stage 1 feasibility study carried out during February-May, 1973 has included regional groundwater studies, pumping tests, logging and laboratory tests on drill cores, slope stability analyses, preliminary design of pit slopes and dewatering...-
Document
Published: 31 May 1973
-
Report on Honeymoon deposit coring programme, June 1975 - South Eagle portion of EL 132, SA.
This report summarises the drilling and coring operations conducted during June and July 1975 to obtain representative core samples of the Honeymoon sedimentary uranium deposit. The work was carried out to determine uranium content, associated...-
Document
Published: 21 Oct 1975
-
Honeymoon project - hydrological report on the HC 9 pumping test conducted February-March, 1980.
Regional and site-specific geological and hydrological factors are discussed, and a groundwater model is proposed for the Honeymoon uranium deposit, based on the results of the HC 9 drilling and testing programme, and on other existing data. A...-
Document
-
Data release - as updated : Lake Frome South. Annual reports to licence expiry/full surrender, for the period 9/5/2005 to 25/11/2015.
A large area centred ~110 km north-northwest of Olary and lying adjacent to the south-eastern margin of Lake Frome has been explored initially for buried sedimentary or calcrete type uranium deposits that may have formed in Pleistocene and Recent...-
Document
Published: 26 Nov 1915
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Yerila. Annual reports for the period 27/8/2009 to 26/8/2015.
During the 2009-2010 licence year, 8 vertical open rotary mud drillholes, YR035 to YR042, were completed along two drill traverses for a total penetration of 1614 m. They were designed to intersect the Eyre Formation adjacent to interpreted faults in...-
Document
Published: 10 Sep 1913
-
Data release : Goulds Dam. Annual reports submitted until the commencement of licence joint reporting with EL 3906 Katchiwilleroo Dam, for the period 18/3/1997 to 26/8/2009.
An area located on the southern edge of the Mesozoic to Tertiary Frome Embayment, 100 km north-west of Olary, which overlies Proterozoic igneous and metamorphic basement of the Curnamona Province, is being explored primarily for possible buried...-
Document
Published: 01 Feb 1911
-
Data release : Katchiwilleroo Dam. Annual reports submitted until the commencement of licence joint reporting with EL 3906 Goulds Dam, for the period 16/9/2003 to 26/8/2009.
No field work was conducted in the second year of EL 2978 ending on 26/6/2004. However, other activities undertaken by Southern Cross Resources had a direct bearing on sedimentary uranium exploration of EL 2978, i.e. during January 2004, the company...-
Document
Published: 28 Jun 1910
-
Jacks Find, Kopi Flat, Thurlooka, Yalkalpo East, Moolawatana, Billeroo, Frome, Coonee, Yalkalpo and Prospect Hill South (the Curnamona Uranium Project). Joint annual reports for the period 1/6/2007 to 31/5/2015.
A dispersed group of tenements covering the known and inferred subcrop extent of the Tertiary Yarramba Palaeovalley in the eastern and northern Lake Frome Plains region is being explored by Curnamona Energy, in a search for possible economic...-
Document
-
Curnamona [Sedimentary Uranium Exploration] Project. Joint annual report for the calendar year 2012.
During 2012, Afmeco conducted a fourth exploratory drilling campaign spread over six of its eight Curnamona Project tenements, which was designed to test the extensions of the Erudina, Yarramba and Coolibah Palaeochannels, as well as probing in basin...-
Document
-
Moolawatana. Fourth partial surrender report at licence expiry/renewal, for the period 27/1/1999 to 28/7/2014.
Work conducted on the recently relinquished portions of the Moolowatana exploration licence, over the 10-year period since the tenement was granted, has included the conduct of four gravity surveys plus the drilling of two deep diamond cored holes,...-
Document
Published: 04 Feb 1915
-
Yarramba. Final report at licence full surrender, for the period 27/8/2009 to 26/8/2014.
No field work was performed on EL 3904 Yarramba during the period August 2009 to August 2011. During Year 5 of EL 3904 ending on 26/8/2012, the following activities occurred: - Fugro Airborne Surveys were contracted by Uranium One to complete an...-
Document
Published: 25 Nov 1914