-
RB 2002/00030 [South Australian earth] resources production statistics for [the] six months ended 30 June 2002.
This report presents a detailed statistical record of the State's output and sales values for petroleum, minerals and materials during the six monthly period ended 30 June 2002. The first part of the report details the production sales figures for...-
Document
Published: 01 Nov 2002
-
RB 2016/00003 South Australian mineral resource production statistics for the six month [period] ended 30 June 2015.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2015, and compares the data with that returned for the previous six...-
Document
Published: 01 Mar 2016
-
RB 2012/00011 South Australian mineral resources production statistics for the six month [period] ended 31st December 2011.
There is no abstract created for this record-
Document
Published: 01 May 2012
-
RB 2016/00033 South Australian mineral resource production statistics for the six month [period] ended 30 June 2016.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2016, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2016
-
RB 2010/00009 [South Australian mineral] resources production statistics for the 6 month [period] ended 31 December 2009.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2009, and compares the data with that returned for the previous six...-
Document
Published: 07 May 2010
-
RB 2016/00006 South Australian mineral resources production statistics for the six month [period] ending 31 December 2015.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2015, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2015
-
RB 2015/00020 South Australian mineral resources production statistics for the six month [period] ending 31 December 2014.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2014, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2014
-
RB 2009/00021 [South Australian] mineral resources production statistics for the 6 month [period] ended 30 June 2009.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2009, and compares the data with that returned for the previous six...-
Document
Published: 03 Nov 2009
-
Cowell nephrite deposit. Consultant's geological appraisal reports (including a progress report about detailed mapping of nephrite pods on Schiller's leases), compiled over the period June to November 1970.
A mining consultant was engaged by mineral claim option holder Murumba Minerals to assess the commercial potential of a rare (for Australia) grouping of lens style nephrite deposits located about 20 km north of Cowell, which had only been mined on a...-
Document
Published: 11 Nov 1970
-
Mineral Resource Potential Map Series - Angaston.
There is no abstract created for this record-
Map
Published: 01 Jun 1915
-
RB 56/00067 Re-interpretation of the Burra Burra copper deposits.
The Burra Burra (sic) copper mine is located in complexly folded Torrensian dolomites and limestones forming the faulted axial region of a major anticline. The orebody formerly mined was largely of secondary origin and confined between two faults,...-
Document
Published: 01 Feb 1963
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-49, Bird-In-Hand Mine Deeps Project gold mineral prospects. Project final report.
At the historic Bird-In-Hand mining claim, where previous mine exploration drilling beneath the old workings by current licence operator Maximus Resources had delineated an inferred remaining gold resource of 53,000 ounces over the depth extent from...-
Document
-
Mungerowie. Progress and final reports for the period 8/11/82 to 7/11/86.
Exploration for base metals associated with iron formations, and also for deposits of graphite or uranium, over the southern part of Eyre Peninsula west and north-west of Port Lincoln, included compilation of a Tertiary isopach and basement geology...-
Document
Published: 05 Nov 1986
-
Pinerow. Data release made in lieu of submitting a first partial surrender report : annual reports for the period 23/5/1996 to 2/10/2004.
As part of a regional search for hydrothermal / epithermal gold and base metals, EL 2167 joint venturer Goldstream Mining over the period October 1996 - March 1999 undertook three phases of regional and detailed geochemical sampling in the poorly...-
Document
Published: 10 Mar 1905
-
Mount Painter area (Yudnamutana Mining Field and Shamrock Valley). Progress and final relinquishment reports for the period 1/10/1968 to 31/3/1970.
Kennecott took up 3 SMLs in the Mount Painter district during 1968 to evaluate known copper-uranium occurrences and to search for new occurrences. At the same time, they secured the ground surrounding four 40-acre Mineral Claims already in their...-
Document
-
The Needles - Sitting Bull area [portion of Arkaroola Station]. Progress and final reports to licence expiry for the period 1/7/1968 to 30/6/1969.
Numerous small, occasionally high grade occurrences of talc and asbestiform amphibole minerals, barite, vermiculite and sodic feldspar were discovered by prospecting across a wide, often rugged hilly area lying to the north-west of Arkaroola...-
Document
-
Angaston - Sedan Hill area. Progress reports and final report to licence expiry/full surrender, for the period 18/11/1975 to 17/11/1976.
Regional stream sediment and rock chip geochemical sampling of an area extending from 15 km north-east to south-east of Angaston was undertaken to search primarily for stratabound Mississippi Valley style Pb-Zn mineralisation in lower Cambrian Hawker...-
Document
-
Kanappa. Final report at licence full surrender, for the period 1/12/1964 to 31/5/1965.
Reconnaissance stream sediment sampling (4000 samples taken over 5 square miles) and follow-up traverse soil sampling (350 samples) have been completed in the vicinity of the historic Kanappa copper mine, 7 miles north-east of Springton, to look for...-
Document
-
Yudnamutana Project SML 704. Chalcopyrite mineralization in the Wywyana Formation Yudnamutana district Feb-March 1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Progress report on [near-mine] exploration activities [performed by the] Burra [Joint] Venture, for the period 10/10/1965 to 28/2/1967.
At the invitation of the South Australian Department of Mines, a mining company consortium has been formed to continue recent SA Government studies at Burra aimed at establishing the economic feasibility of re-opening the historic copper workings to...-
Document
Published: 29 Mar 1967