-
Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2013 to 6/10/2018.
An area located ~25 km north-east of Woomera is being explored for possible economic buried Cu-Co-Au mineralisation which may have formed in the Adelaidean metasedimentary cover rocks of the Stuart Shelf. Under Gunson Resource's prior tenure of EL...-
Document
Published: 07 Dec 2018
-
Whiting. Annual reports to licence expiry/full surrender, for the period 15/2/2010 to 14/2/2014.
A number of small, disjoint parcels of available exploration ground in the Moonta-Wallaroo district were taken up by Minotaur early in 2010 to assess their basement IOCG mineralisation potential. A preliminary review done by Minotaur of historic...-
Document
Published: 21 Mar 2014
-
Emu Lookout and Mount Norwest (the Northern Lake Torrens Project). Final report at licences' joint surrender, for the period 10/9/2012 to 18/3/2014.
As part of a regional brownfields exploration programme addressing the potential for discovering buried economic Olympic Dam style IOCG mineralisation, a desktop study was undertaken for the subject tenements which included the compilation and...-
Document
Published: 16 May 2014
-
Pernatty Lagoon. Final report, Project ADI RD02-295 [Accelerated Discovery Initiative Round 2, 2022].
This report pertains to the Pernatty C Zambian Copperbelt (ZCB) Project which was partially funded by a $298,500 grant through the State Government’s Accelerated Discovery Initiative (ADI) which aims to make a major contribution to achieving the South...-
Document
Published: 02 Aug 2022
-
Punt Hill Project. 3D data package.
South Australia’s Olympic Cu-Au Province hosts some of the world’s great iron oxide copper gold (IOCG) deposits, such as Olympic Dam, Prominent Hill and Carrapateena. The same causative thermal event resulted in variants of this deposit class being...-
Model
- ZIP,
-
RB 2011/00003 PACE Geochronology: Results of collaborative geochronology projects [performed during] 2009-2010.
This report book presents the results of seven geochronology research projects completed during 2009 and 2010 as a new part of the ongoing PACE Initiative geoscientific data gathering activity underwritten by the South Australian Government. It has...-
Document
Published: 01 Apr 2011
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-43 - Torrens Hinge Zone - Yadlamalka Horst Adelaidean sediment-hosted copper and Palaeoproterozoic basement IOCG mineral prospects. Project interim and final reports.
In February 2008, Lincoln Minerals Ltd was awarded a grant of $100,000 in Round 5, Theme 2 of PIRSA's PACE Initiative to conduct drill tests for the possible presence of sediment-hosted copper mineralisation in Adelaidean successions, as well as for...-
Document
Published: 30 Jun 2009
-
The Gawler Craton Project [Part]. Data release made in lieu of partial surrender/joint annual reports for the period 3/2/2010 to 1/2/2019, plus letters giving permission to release owed licence partial relinquishment and surrender reports.
As part of a regional search for possible major deposits of IOCG type mineralisation, Golden Cross Resources took up six exploration tenements in the northern Gawler Craton that lie to the north and north-east of Coober Pedy, and which are within or...-
Document
Published: 23 Jun 2015
-
Data release - as updated : Maitland (the Yorke Peninsula Copper Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/8/2008 to 24/8/2017.
An area of the western Yorke Peninsula, comprising three separate sub-blocks, was taken up to explore for possible economic buried IOCG-U deposits similar to those at Hillside (located 25 km to the east of sub-block 'B'), Olympic Dam, Prominent Hill...-
Document
Published: 18 Oct 2017
-
Data release [made at SA Director of Mines' discretion] : Mullaquana. Annual reports for the period 20/11/2006 to 19/11/2009.
A tenement area located close to and along the eastern seaboard of the Eyre Peninsula, and which extends from Whyalla southwards for approximately 60 km, has been taken up to explore for possible economic buried primary, hard rock hosted uranium and...-
Document
Published: 20 Jun 2010
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-06 - Intercept Hill, Stuart Shelf, Mesoproterozoic IOCGU mineral prospects. Drilling project final report.
EL 5372 Intercept Hill is centrally located in the world class Olympic Dam Iron Oxide Cu-Au-U Province, at the centre of a cluster of iron oxide copper occurrences including Emmie Bluff, Oak Dam and Winjabbie. The Intercept Hill area has available...-
Document
Published: 19 Jan 2016
-
Data release - as updated [made at SA Director of Mines’ discretion] : Pernatty [Station]. Annual reports for the period 29/11/2005 to 28/11/2009.
An area centred approximately 110 km north of Port Augusta, covering part of the Pernatty Ridge plateau on the south-western side of Lake Torrens, approximately 145 km south-east of the Olympic Dam mine, was taken up to explore for possible economic...-
Document
Published: 24 May 2010
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 2 of 2].
In March 2010, once the terms of the joint venture agreement had been finalised, Argo passed its complete data sets to Xstrata, who immediately commenced a re-logging of Argo's drill cores besides conducting comprehensive unconstrained 3-D modelling...-
Document
Published: 15 Nov 2013
-
Francis Swamp and Margaret Creek (part of the Billa Kalina G2 Diamond Project). Data release made upon the full surrender of subsequent licences: annual reports and combined annual reports to licences' joint renewal, 13/10/2000 to 12/10/2005.
Exploration for possible commercial diamond deposits has been carried out along a portion of the G2 gravity lineament located immediately south of William Creek and the southern Peake and Denison Ranges, looking for inferred diamondiferous kimberlite...-
Document
Published: 06 Jun 2007
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 2018
-
Finniss Springs. Annual reports plus final report to licence expiry/full surrender, for the period 20/1/2012 to 19/1/2015.
A large area centred ~60 km west of Marree, near the south-eastern margin of Lake Eyre South, has been explored for possible buried economic sedimentary type base metal mineralisation which may have formed in the Adelaidean cover sequence, as well as...-
Document
Published: 10 Apr 2015
-
Griffin Well. Annual reports and final report to licence full surrender, for the period 20/10/2005 to 17/3/2009.
An area within the north-western Stuart Shelf which lies about 80 km west of Olympic Dam and 40 km south of Prominent Hill was explored for possible similar IOCG-U type economic mineral deposits by a new industry entrant uranium explorer, Uranium...-
Document
Published: 05 Jun 2009
-
Kootaberra (part of the Port Augusta Project). First partial surrender report at licence expiry/renewal, for the period 3/8/2018 to 24/1/2022.
47 square km or ~13% of the former area of EL 6218 Kootaberra has been relinquished to comply with the Amalgamated Expenditure Arrangement mandatory area reduction conditions for FMG's Port Augusta Project. This licence lies outside of and to the...-
Document
Published: 11 Feb 2022
-
Data release - as updated : Crystal Brook and Port Pirie (the Wandearah Project). Joint annual reports to licences' respective full surrenders, for the period 2/8/2008 to 26/4/2018.
Buried basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation of either Moonta-Wallaroo or Olympic Dam style is the target of ongoing exploration on the two adjacent subject tenements. In addition, the current holder considers that...-
Document
Published: 29 May 2018