-
Algebuckina and Peake [Algebuckina South]. Third and second partial surrender respectively : reports for the period 3/8/2004 to 2/8/2009.
Data from part of a heliborne EM survey conducted in September 2007 over the now relinquished portions of EL 3226 has been released. This survey was flown in a search for possible stratabound roll-front style or palaeochannel hosted sedimentary...-
Document
Published: 12 Mar 2010
-
Peake Hill. Annual and final reports to licence expiry/full surrender, for the period 16/7/2007 to 15/7/2012.
An area located on and closely marginal to the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 80 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed...-
Document
Published: 03 Aug 2012
-
Boundary Dam. First partial surrender report, for the period 20/7/2007 to 19/7/2010.
A small licence area taken up approximately 130 km north of Marla, near the SA/NT state border, is being explored for possible economic secondary uranium mineralisation formed in sandstone or calcrete. Prior to Tianda Resources deciding to apply for...-
Document
Published: 27 Sep 2010
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 2012
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Frome North. Annual reports for the period 19/8/2013 to 18/8/2016.
An area in the south-west of the Frome Embayment, that is centred ~80 km south-southeast of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium...-
Document
Published: 08 Sep 2016
-
Kybunga (latterly a part of the Balaklava HMS Project - Iluka tenements Group 9). First annual report 3/5/2012 to 2/5/2013, plus a joint annual report and final report for Group 9 submitted at the five project licences' full surrender on 24/9/2015.
Ground within the northern onshore Saint Vincent Basin was taken up by Iluka Resources to re-appraise the heavy mineral sands (HMS) potential of buried Tertiary sediments there, after some unsuccessful exploration had previously been undertaken in the...-
Document
Published: 22 Sep 2015
-
Lake Arthur East and Lake Arthur (the Lake Surprise Project). Data release - as updated - made in lieu of submitting these licences' third partial surrender reports : joint annual reports for the period 29/8/2014 to 28/8/2018.
A wide basinal area located east of Marree and bordering the northern Willouran Ranges is being explored afresh for sedimentary uranium occurrences in response to market conditions and the demonstrated prospectivity of the local cover rocks, which...-
Document
Published: 10 Jul 2018
-
Algebuckina. Sixth partial surrender report, for the period 3/8/2004 to 28/9/2013.
Portions of an exploration licence situated at the northern end of the Denison Range, on and south of the Neales River, have recently been relinquished due to their perceived diminished potential to contain buried IOCG style or other economic metallic...-
Document
Published: 18 Oct 2013
-
Mineral Resource Potential Map Series - Encounter.
There is no abstract created for this record-
Map
Published: 01 Jun 2015
-
Mineral Resource Potential Map Series - Angaston.
There is no abstract created for this record-
Map
Published: 01 Jun 2015
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 2007
-
ELs 4653 - 4661 (the Marla Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 25/1/2011 to 9/9/2014.
Nine licence areas occupying a 70 km x 30 km region overlying a west-northwest trending structural corridor situated along the northern margin of the Gawler Craton, have been explored for possible buried large-scale deposits of iron oxide - associated...-
Document
Published: 23 Oct 2014
-
Data release [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports and technical reports to licence expiry/renewal, for the period 29/8/1992 to 28/9/2009.
In the reporting period to 30th June 1995 for Exploration Licence 1944, Heathgate Pty Ltd completed no fieldwork, however geological evaluation work was undertaken. This work consisted of laboratory testing of drill core from a 1991 drilling program...-
Document
Published: 18 Jun 2010
-
Algebuckina. Annual reports to licence expiry/full surrender, for the period 3/8/2008 to 28/9/2014.
The only field work undertaken by Red Metal during its final six years of tenure of EL 3226/4307 Algebuckina was the assaying in 2011 of 88 soil and rock chip samples which it had collected from the vicinity of historically reported surface copper...-
Document
Published: 01 Oct 2014
-
Peake. Fifth partial surrender report, for the period 3/8/2004 to 28/9/2013.
Portions of an exploration licence situated at the southern end of the Denison Range, north-east of Edward Creek township, have recently been relinquished due to their perceived diminished potential to contain buried IOCG style or other economic...-
Document
Published: 18 Oct 2013
-
Data release - as updated [made at SA Director of Mines’ discretion] : Arkaroola. Annual reports for the period 5/12/2008 to 3/12/2015.
During the 2008-2009 licence year, most of the new work done consisted of appraisal rotary mud drilling at Four Mile East (112 holes for 24,460 m) and Four Mile West (113 holes for 19,120 m), with the addition of one NQ diamond cored hole (AKC093) for...-
Document
Published: 20 Jan 2016
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 2015
-
Mineral Resource Potential Map Series - Halbury.
There is no abstract created for this record-
Map
Published: 01 Jun 2015
-
Mineral Resource Potential Map Series - Willunga.
There is no abstract created for this record-
Map
Published: 01 Jun 2015
-
Mineral Resource Potential Map Series - Milang.
There is no abstract created for this record-
Map
Published: 01 Jun 2015