-
Houghton. Annual reports and partial relinquishment report to licence expiry/full surrender, for the period 22/10/2001 to 21/10/2006.
Three potentially economic gold and platinum / palladium - bearing, known primary uranium-mineralised targets in the Palaeoproterozoic Houghton basement inlier have been evaluated through the conduct of office-based geological and geophysical studies,...-
Document
Published: 26 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-18. Western Musgrave Province - Mount Caroline area magmatic nickel-copper-PGE and stratiform or epithermal / hydrothermal base metal mineral prospects. Final report.
In late 2008 PepinNini Minerals completed a stratigraphic drilling programme in the western Musgrave Province as an approved PACE Initiative Year 5 collaborative project with PIRSA. The programme was designed to investigate the Mount Caroline...-
Document
Published: 20 Jan 1909
-
Koppio. Annual reports and final report to licence full surrender, for the period 6/1/1995 to 7/4/1997.
Geochemical sampling of ferruginous lag, stream sediments, BLEG soils, and rock chips, targeted possible Thompson Belt - type nickel-copper and precious metal mineralisation hosted by Lower Proterozoic Hutchison Group metasediments in an area 40 km...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Fig Tree Corner. Second partial surrender report, for the period 10/3/2005 to 4/4/2019.
Most of a sizeable licence area located on SA's Far West Coast, which formerly extended for 10 to 90 km inland from the vicinity of Bookabie, has now been partially relinquished owing to its perceived diminished prospectivity for Tertiary marine...-
Document
Published: 12 Apr 1919
-
Poondinga. Third partial surrender report, for the period 27/10/2004 to 4/4/2019.
309.6 square km or ~18.77% of the pre-existing area of EL 5564 Poondinga was partially relinquished on 19/2/2019 because in the licensee's view this south-eastern portion of the licence are does not appear to exhibit the geological features required...-
Document
Published: 12 Apr 1919
-
Nyllow Hill (near Tumby Bay). Progress and final reports for the period 2/9/88 to 1/9/90.
TARGET: Precious metals, specifically platinum group metals and gold, associated with ultrabasic intrusives and strongly faulted and altered metasediments in the Tumby Bay area. EXPLORATION: Geochemical sampling including rock chip, gravel and BCL...-
Document
-
Cambrai. Combined first quarterly / final report to licence full surrender, for the period 1/8/1990 to 21/12/1990.
TARGET: Within a small area centred on Cambrai township, all metallic minerals, but primarily gold which might occur in the Black Hill Norite complex. EXPLORATION: Limited surface rock chip grab geochemical sampling (5) at the Black Hill council...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Nullarbor, Yalata North and Yalata East (the Western Gawler Craton Project). Joint annual reports for the period 24/10/2012 to 2/4/2018.
A cluster of adjoining licence sub-blocks taken up in the Yalata region are being explored for possible buried Thompson Belt style magmatic copper-nickel mineralisation which could be associated with large strike-slip fault structures transecting the...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Ceduna. Licence-specific annual reports submitted until the commencement of project joint reporting, for the period 28/11/2001 to 18/4/2008.
EL 2870 Ceduna covers 1390 square km located adjacent to the coast near Ceduna on north-western Eyre Peninsula. Minotaur believed that the area, which lies relatively close to the continental Fowler Suture Zone, was prospective for Proterozoic...-
Document
Published: 12 Jun 1908
-
Mount Howe. Annual and final reports for the period 26/9/1994 to 25/9/1998.
An aeromagnetic/radiometric survey and an aircore drilling program (41 holes, total 247 metres) were carried out near the SA/NT border to the north, north-east and west of De Rose Hill, to test three positive aeromagnetic features which potentially...-
Document
-
Houghton. First partial surrender report for the period 22/10/2001 to 21/10/2005.
Three potentially gold and platinum / pallidium - bearing, known primary uranium-mineralised targets in the Palaeoproterozoic Houghton basement inlier, have been evaluated through the conduct of office-based geological and geophysical studies followed...-
Document
-
Fowler. Annual report plus final report to licence expiry/full surrender, for the period 30/8/1993 to 29/8/1995.
Exploration for nickel, chromium and precious metals, 60 km north-west of Fowlers Bay, comprised ground magnetic and Protem surveys, plus RC drilling (5 holes, total 637 m). No ultramafic intrusive rocks were encountered, and no anomalous downhole...-
Document