-
Glenorchy. Progress reports for the period 3/10/85 to 2/4/87.
An assessment of the uranium and base metal potential of an area located 75 km north of Yunta included the inspection of historic uranium prospects, geological mapping at 1:25,000 scale, rock chip and groundwater sampling, reprocessing of aerial...-
Document
-
Olary region. Progress and annual reports for the period 23/9/1976 to 22/9/1978.
Intensive exploration of granitoid environs in the Crocker Well area has outlined new areas of, and extended known areas of, primary uranium mineralization. A regional field evaluation was also made of the Glenorchy and Plumbago areas, leading to the...-
Document
-
Wilkinson Lakes. Progress reports to licence expiry/full surrender, for the period 14/7/1978 to 5/10/1981.
TARGET: Sedimentary uranium in Tertiary paleochannels draining the western margin of the Gawler Craton, and in sediments of the Wilkinson Trough. Base metals in Proterozoic basement rocks. EXPLORATION: Rotary drilling (48 holes totalling 3213 m),...-
Document
Published: 06 Apr 1981
-
RB 00038 Performance of mineral dressing pilot plant at Radium Hill.
Laboratory tests leading to installation of magnetic separation plant, and to heavy media plant, are decribed. Operations of plants are reviewed. Lab. tests of flotation are described. Operating costs of pilot plant are discussed.-
Document
-
Kalabity. Annual reports and final report to licence expiry/full surrender, for the period 18/11/2000 to 28/3/2014.
An area situated ~100 km west of Broken Hill has been explored for buried base and precious metals epigenetic mineralisation that might have formed within Palaeoproterozoic meta-igneous and metasedimentary basement rocks of the north-eastern Olary...-
Document
-
RB 2004/00009 Radium Hill uranium mine and low level radioactive waste repository management plan. Phase 1 - Preliminary investigation, 2004.
This report is Phase 1 of a management plan for the 'Radium Hill Mine Site and Low-Level Radioactive Waste Repository', and is essentially a preliminary investigation to establish a greater understanding of the characteristics of the site. Phase II...-
Document
Published: 01 Jul 2004
-
Calico Dam. Progress and annual reports, and final report to licence full surrender, for the period 3/7/1989 to 23/7/1999.
Interpretation of sets of airborne magnetic / radiometric survey data acquired over Proterozoic metasedimentary and granitoid basement terrain in the Kalabity area identified three discrete radiometric anomalies, one of which was traced by rock chip...-
Document
-
Mineralization geology and structure SML 118 Olary Province SA.
There is no abstract created for this record-
Document
Published: 01 Jan 1968
-
Plumbago. Progress and technical reports to licence expiry/renewal for the period 1/7/1968 to 30/6/1970.
The aim of a new round of company exploration in the Crocker Well - Mount Victoria region of the Olary Province has been to re-appraise the reserves and ore grade at three known uranium deposits, and also to try to find orebody extensions and new...-
Document
-
Plumbago - Glenorchy area [= Olary 'B' Farmin Block]. Progress and final reports to licence expiry/full surrender for the period 10/2/1972 to 9/2/1973.
In a search for possible remaining economic primary or secondary uranium deposits in an area of known such mineral occurrences located around Mount Victoria, a consultant was engaged by Esso Minerals to conduct detailed 1:12,000 scale geological...-
Document
-
Ethiudna [= Olary 'B' Farmin Block]. Progress reports to licence expiry/renewal for the period 14/1/1971 to 13/1/1972.
Exploration carried out mainly to look for possible large primary deposits of uranium ore in localities surrounding Ethiudna Hill initially addressed the potential of several hard rock showings of uranium mineralisation which had been found by...-
Document