-
Data release - as updated : England Hill, Arckaringa and Copper Hill (the Arckaringa Coal Project). Joint annual reports and joint final report to licences' expiry/full surrender, for the period 7/6/2005 to 6/6/2019.
Under a new strategic focus, three licence areas covering three Early Permian buried coal deposits located at Wintinna, Westfield and Murloocoppie in the northern part of the Arckaringa Basin, ~120 km north of Coober Pedy, have been evaluated both for...-
Document
Published: 29 Aug 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 27/4/2000 to 8/8/2010.
During the sixth licence year, on renewed EL 2717 covering the same area as previously, the licensee, now a wholly owned subsidiary of AuIron Energy Limited (formerly Meekatharra Minerals Limited), progressed its investigations of the geology of the...-
Document
Published: 01 Sep 1916
-
Organic petrology: Macumba 1 and Poolowanna 1 wells through the Eromanga, Simpson Desert and Pedirka Basins.
The dispersed organic matter content of drill cuttings samples from the subject wells was examined microscopically to assess its hydrocarbon potential. In general it appears that the Cretaceous and Permian sediments are unlikely to be good source...-
Document
-
Organic petrology of samples from a group of four wells in the Simpson Desert and Pedirka Basins.
Sixty five samples from 4 wells were examined for organic matter type and abundance, and maturation levels. The Late Permian Purni and Early Jurassic Poolowanna Formations contain the best source rocks in the Poolowanna Trough. These sequences are...-
Document
-
Lyons, Mount Christie, Barton, Immarna and Immarna South. Final report at licences' joint expiry/full surrender, for the period 3/6/1983 to 2/6/1988.
TARGET: Possible diamonds in the Barton region. EXPLORATION: Acquisition of an aerial magnetic-radiometric-VLF EM survey (line spacing: 300 m; altitude: 70 m) led to field investigations of 142 potential kimberlite targets generated from this survey...-
Document
-
Wintinna Coalfield hydrogeological and geotechnical study.
This study has formulated a geotechnical and hydrogeological model of the Wintinna Coalfield which satisfies the following objectives: - to provide answers to the hydrogeological and geotechnical questions raised by Fluor in their mining study; - to...-
Document
Published: 05 Dec 1983
-
Margaret Creek and Francis Swamp (part of the Billa Kalina Project). Joint first partial surrender report, for the period 23/2/2006 to 22/2/2009.
Within the now relinquished portions of the subject licences, as part of a regional search across several tenements in the Billa Kalina district for possible kimberlites or diamonds, Flinders Mines carried out scout exploratory drilling in two...-
Document
-
Warrior. Progress reports for the period 4/4/79 to April 1982.
The licence was relinquished following conduct of intensive exploration in the Malbooma area since 1973. Drilling of 514 percussion holes (totalling 21 355 metres) and 29 cored holes (totalling 1 111 metres) defined widespread uranium mineralisation,...-
Document
Published: 01 Jan 1982