-
Mutooroo [Station]. Progress reports to licence full surrender, for the period 11/9/1989 to 6/9/1994.
Exploration for possible heavy mineral sand marine placer deposits within Tertiary sediments on the northern margin of the Murray Basin comprised aircore drilling (28 holes, total 744 m) in the Mutooroo station area, 50 km south-east of Olary. The...-
Document
-
RB 98/00022 Review of open file company exploration data from the early 1980s to mid-1997, over the Yunta, Winnininnie, Anabama and Oakvale 1:100 000 map sheets, OLARY 1:250 000 map sheet, South Australia.
Significant exploration focussed on: · stratabound 'Telfer-style' gold in Adelaidean metasediments in the Nackara Arc, using stratiform or stratabound structurally-controlled genetic models; and structurally controlled gold and base metal...-
Document
Published: 01 Jul 1997
-
Lilydale. First annual report and final report to licence full surrender, for the period 10/3/2004 to 6/7/2005.
Exploration for possible concealed porphyry style Cu-Au deposits of a kind similar to the nearby Blue Rose prospect surface skarn occurrence was undertaken over an area of the eastern Nackara Arc, 50 km south-east of Yunta. Work comprised inspection...-
Document
Published: 06 Jul 1905
-
Anabama. First partial surrender report, for the period 14/8/2015 to 13/8/2017.
Half of a small licence area located in the Anabama district has lately been surrendered. The ground had been taken up to explore for possible economic buried base metal mineralisation that might have formed on and near the south-eastern margin of the...-
Document
Published: 12 Dec 1917
-
Anabama Hill. Prospectivity report and data review for the period 2/1/1980 to 14/7/1980.
A memo received from Asarco's Arizona-based geologist Mr J H Courtright (27 December 1978) drew the attention of that company's Perth office staff to the similarities between the Anabama breccia pipes, which he had seen during a visit to the prospect...-
Document
Published: 14 Jul 1980
-
Data release - as updated : Florieton. Annual reports to the commencement of project licences' joint reporting, plus final report to licence full surrender, for the period 5/11/2007 to 18/2/2015.
During initial exploration of the Florieton area, located approximately 40 km south-east of Burra, the compilation and reprocessing of available gravity and magnetic data were used to interpret the bedrock geology hidden under a widespread 150-200 m...-
Document
-
Jubilee Dam. Annual reports to licence expiry/full surrender, for the period 4/3/1997 to 3/3/2001.
Regional calcrete geochemical sampling was carried out in the Mutooroo - Anabama area in a search for precious and base metals. Initial surface calcrete sampling at several prospects was followed by auger drill sampling to depths up to 2 m on an...-
Document
Published: 28 May 1901
-
Anabama. Annual and final reports for the period 18/8/1998 to 17/8/2000.
Results of previous work were reviewed for an area located near the contact of the Anabama Granite and a major NE trending fault system within Adelaidean sediments and volcanics, 60 km south of Olary. Low grade disseminated Cu mineralisation,...-
Document
Published: 21 Jul 1900
-
Netley Hill. Progress and final reports to licence expiry/full surrender for the period 1/12/1968 to 30/11/1969.
A rotary percussion drilling programme (8 vertical holes for a total penetration of 1920 feet) was undertaken at Netley Hill to look for economic copper and molbdenum mineralisation in a greisen (hydrothermally altered granite) body which has an...-
Document
Published: 19 Nov 1970