-
PEL 56. Progress reports for the period June 1991 to November 1994.
No work performed - licence cancelled.-
Document
Published: 29 Nov 1994
-
1982 seismic survey, Christmas Creek, final report.
AIM:The 1982 Christmas Creek Seismic Survey was designed to cover a wide area of the sparsely explored western farmout blocks of PELs 5 and 6, where Eromanga Basin sediments thin and overly sub-basins of variously aged prospective sediments. Primary...-
Document
-
PEL 50, Tirari Desert. Progress and technical reports for the period 1/7/91 to 30/6/2001.
There is no abstract created for this record-
Document
-
PEL 50, Eromanga Basin, South Australia. Farm-out brochure and supporting data.
Petroleum Exploration Licence 50 in northern South Australia covers approximately 9714 square km of the prospective Eromanga Basin, in which over 400 million barrels of oil in place have been discovered since 1977. To date, only 3 exploratory wells...-
Document
-
PEL 54. Progress and technical reports for the period June 1991 to June 1993.
Duerden Energy NL contracted Exploration Laboratories Pty Ltd to carry out a soil gas geochemical survey of 1012 line kms between 27/8-11/9/91, to hand sample the near ground surface (< 40 cms depth) soil profile for extractable hydrocarbons in the...-
Document
Published: 16 Jun 1993
-
Petroleum exploration review, PEL 55, Eromanga Basin, South Australia.
This report examines the prospectivity of PEL 55 in considerable detail, in order to construct a dataset suitable for attracting new farminees so that outstanding drilling work on the licence may be progressed. The favourable setting of the licence...-
Document
-
PEL 42. Progress and technical reports for the period September 1989 to February 1993.
The operator completed the Year One geophysical and geological data review, but the seismic reprocessing project and a subsequent Year Two commitment to acquire new seismic, later varied to be the conduct of a soil geochemical survey, were not carried...-
Document
Published: 23 Feb 1993
-
PEL 49, Simpson Desert. Progress and technical reports for the period 1/7/91 to 30/6/2001.
There is no abstract created for this record-
Document
-
Technical assessment of the petroleum geology and hydrocarbon prospects within PEL 55.
This review of the geological and geophysical data from the PEL 55 area forms a major part of the Year 1 work commitment on the licence, apart from the remaining obligation to carry out reprocessing of 200 line km of seismic. Available reports from...-
Document
-
PEL 55. Technical review reports.
Contains licence prospectivity review reports commissioned by the operator to demonstrate the broad stratigraphic oil source and reservoir potential of the PEL 55 region, thereby confirming and enhancing the hydrocarbon prospectivity of the licence to...-
Document
-
RB 00655 Delhi-Frome-Santos Innamincka no. 1 well. Subsurface stratigraphy and micropalaeontological study. Final report.
Innamincka no. 1 well was drilled to a depth of 12,638 feet KB and penetrated a sedimentary sequence of Mesozoic and Palaeozoic rocks ranging in age from Cretaceous to ?Devonian. Marine Cretaceous (Albian) carbonaceous mudstones and siltstones were...-
Document
Published: 08 Feb 1960