-
Data release - as updated : Bulgunnia. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
An area centred approximately 70 km north-northeast of Tarcoola has been explored for possible economic buried basement-hosted IOCG style or other (e.g. Menninnie Dam and/or Mount Gunson type) altered rock facies - hosted metallic mineralisation,...-
Document
Published: 27 Oct 1922
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty Lagoon. Annual reports for the period 27/6/2007 to 22/7/2018.
Continuing exploration for possible buried economic IOCG mineralisation on the western side of an area located between Lake Torrens and Pernatty Lagoon, under tenure of renewed EL 3854, was focussed on determining mineral systems geochemical...-
Document
Published: 23 Aug 1918
-
Data release [made at SA Director of Mines' discretion] : Mount Ive [South] (part of the Mount Ive Project). First annual report, for the period 20/6/2014 to 19/6/2015.
An area centred on the southern part of Mount Ive Station is being explored primarily for buried economic, basement hosted and structurally controlled hydrothermal Ag-Zn-Pb and epithermal Au-Ag-(Cu) vein style mineralisation, as well as for possible...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Kolendo [not "Taringa"] (part of the Menninnie Zinc Project). Annual reports for the period 21/2/2011 to 20/2/2013.
An area located adjacent to the southern margin of the Gawler Ranges, that includes some exposures of Mesoproterozoic Gawler Range Volcanics (GRV), and which at its southern boundary lies approximately 15 km north-east of the Menninnie Dam Pb-Zn-Ag...-
Document
-
South Gap. Annual reports and final report to licence expiry/full surrender, for the period 24/7/2017 to 23/7/2021.
A small area situated just north of the Beda Arm of Lake Torrens, and ~20 km north-northeast of the Carrapateena deposit, has been explored for possible buried high grade IOCG mineralisation that may be present in Proterozoic basement rocks. It was...-
Document
Published: 23 Aug 1921
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gairdner - Unalla Hill (part of the Mount Ive Project). Annual reports for the period 7/6/2013 to 6/6/2015.
A licence consisting of three separate small sub-blocks located on the northern part of Mount Ive Station is being explored primarily for buried economic, basement hosted and structurally controlled hydrothermal Ag-Zn-Pb and epithermal Au-Ag-(Cu) vein...-
Document
-
Gilles Downs. Combined first annual/final report at licence expiry/full surrender, for the period 23/8/2018 to 22/11/2019.
An area centred ~55 km west-northwest of Whyalla, extending between the northern shore of Lake Gilles and country to the west of Iron Baron, has been explored for possible buried economic epithermal style base and precious metal mineralisation...-
Document
-
Data release - as updated : Woordlemmie. Annual reports to licence full surrender, for the period 22/6/2011 to 22/11/2019.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings, covering ground adjacent to the south-western and southern margins of Pernatty Lagoon, has been explored for possible buried economic...-
Document
Published: 26 Nov 1919
-
Data release [made at SA Director of Mines' discretion] : Mount Ive [North] (part of the Mount Ive Project). Annual reports for the period 21/06/2013 to 20/06/2015.
An area centred on the northern part of Mount Ive Station and adjacent to the southern shoreline of Lake Gairdner is being explored primarily for buried economic, basement hosted and structurally controlled hydrothermal Ag-Zn-Pb and epithermal...-
Document
-
Data release [made at SA Director of Mines' discretion] : Tanner (part of the Mount Ive Project). First annual report for the period 01/8/2014 to 31/7/2015.
A licence area centred on Tanners Dam which is located ~26 km south-west of Lake Gairdner is being explored primarily for buried economic, basement hosted and structurally controlled hydrothermal Ag-Zn-Pb and epithermal Au-Ag-(Cu) vein style...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-12 - Corunna Station, north-eastern Eyre Peninsula, structurally controlled Mesoproterozoic epithermal Ag-Au and base metal prospects. Drilling final report.
Musgrave Minerals Ltd (MGV) is the holder of the subject EL 5497 Corunna North, located in the southern Gawler Ranges approximately 65 km west of Port Augusta and 10 km north of Iron Knob, where it is exploring for economic base and precious metal...-
Document
-
Yudnapinna [West]. Combined first annual/final report to licence expiry/full surrender, for the period 22/9/2020 to 21/9/2021.
Two contiguous exploration licences, ELs 6522 and 6523, were secured in the Yudnapinna district to apply new concepts and techniques aimed at revitalising the rate of copper-gold mineral deposit discovery in South Australia. The licences’ area lay...-
Document
Published: 03 Nov 1921
-
Yudnapinna [East]. Combined first annual/final report to licence expiry/full surrender, for the period 22/9/2020 to 21/9/2021.
Two contiguous exploration licences, ELs 6522 and 6523, were secured in the Yudnapinna district to apply new concepts and techniques aimed at revitalising the rate of copper-gold mineral deposit discovery in South Australia. The licences’ area lay...-
Document
Published: 03 Nov 1921
-
Yarna Hill. Annual reports to licence expiry/full surrender for the period 19/11/2002 to 4/12/2010.
An area of sparse basement outcrop situated to the west of Lake Acraman in the central Gawler Ranges district was taken up to explore for possible economic Olympic Dam style mineralisation, based on the licensee's evaluation of past drillhole data...-
Document
-
Palthrubie Hill. Annual reports to licence expiry/full surrender for the period 21/5/2002 to 4/12/2010.
An area situated to the west of Lake Acraman in the central Gawler Ranges district was taken up to explore for possible economic Olympic Dam style mineralisation, based on the licensee's evaluation of past drillhole data which indicated that a number...-
Document
-
Deception Hill. Annual reports and final report to licence full surrender, for the period 26/10/2004 to 9/10/2013.
The iron oxide - associated copper-gold (IOCG) mineralisation potential of an area centred ~20 km south of Tarcoola, which appeared to contain untested but interesting gravity and soil geochemical anomalies, was investigated by Minotaur to try to...-
Document
Published: 28 Oct 1913
-
Data release [made at SA Director of Mines’ discretion] : Lake Gairdner South [SW margin]. Annual reports to licence expiry/renewal, for the period 25/10/2002 to 24/10/2007.
An area flanking the south-western margin of Lake Gairdner was taken up by Rudy Gomez to explore for possible economic buried precious and base metal epithermal mineralisation of Olympic Dam or Tunkillia style within volcanic rocks of the Proterozoic...-
Document
Published: 05 Apr 1908
-
Data release - as updated [made at SA Director of Mines' discretion] : Kolendo (part of the Menninnie Zinc Project). Annual reports for the period 27/7/2009 to 26/7/2012.
An area located adjacent to the southern margin of the Gawler Ranges that includes some exposures of Mesoproterozoic Gawler Range Volcanics (GRV), and which at its south-eastern corner lies approximately 12 km north-west of the Menninnie Dam Pb-Zn-Ag...-
Document
-
The Lookout (part of the Mintabyng Project). Annual reports plus final report to licence full surrender, for the period 29/11/2012 to 9/6/2015.
In late November 2012, three adjoining areas in the central Gawler Craton were taken up by Woomera Exploration Limited (WEX), an unlisted public company, for the purpose of minerals exploration. Within the subject licence area, the easternmost of the...-
Document
Published: 23 Jun 1915