-
Harris Bluff (Uno Station). Progress reports and final report to licence full surrender, for the period 7/9/1982 to July 1986.
Exploration undertaken over an area located 60 km west of Port Augusta targeted possible Broken Hill or Aggeneys - Gamsberg type massive Pb-Zn deposits within Early Proterozoic Hutchison Group banded iron formation metasediments, and also any Early...-
Document
-
Cooyerdoo Station. Progress reports to licence expiry/re-issue as part of another licence, for the period 14/9/1981 to 13/3/1983.
Following the signing of an eighteen month exploration joint venture agreement with Stockdale, farminee Mobil Energy Minerals undertook continuation of the uranium search over the anomalous ground lying east and south-east of Lake Gilles, besides...-
Document
Published: 12 Apr 1983
-
Landsat thematic mapper study of the Yardea Dacite, Gawler Range Volcanics, YARDEA 1:250 000 scale map sheet.
The South Australian Department of Mines and Energy (SADME) commissioned the South Australian Centre for Remote Sensing (SACRS) to undertake a digital analysis of Landsat Thematic Mapper (TM) data in an attempt to locate prospective areas for...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
Roopena and Iron Knob. Joint progress reports, joint annual reports and final report to licences' joint full surrender, for the period 22/4/1992 to 23/2/2000.
Exploration for Mount Isa style, Fe-oxide associated Cu-Au mineralisation has targeted Whyalla Group metasediments and associated Hiltaba Suite granitic intrusions within a 110 km long x 15 km wide, north - south aligned corridor situated west of...-
Document
-
Lake Gilles area. Data release made in lieu of submitting a partial surrender report upon licence renewal : progress reports for the period 26/10/1989 to 10/2/2001.
Menninnie Dam - style Pb-Zn mineralisation in areas north and east of Lake Gilles was the initial target of exploration. A ground magnetic survey conducted along five lines was followed by shallow auger drilling (302 holes, total 1099 m) plus lag,...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Morgans (part of the East Eyre Peninsula Project). Annual reports for the period 17/1/2012 to 16/1/2019.
An area of mainly covered bedrock consisting of two separate sub-blocks bordering the south-eastern Gawler Ranges, which is considered prospective for finding buried hypogene IOCG mineralisation and possible stratiform and metamorphic base metals in a...-
Document
Published: 21 Mar 1918
-
Nonning Homestead. Progress and final reports to licence expiry/full surrender, for the period 12/4/1983 to 11/4/1985.
The target of base metal exploration carried out over an area located 50 km north of Kimba was possible Broken Hill or Aggenys - Gamsberg exhalative type stratiform lead-zinc-copper-silver mineralisation associated with banded iron formations in the...-
Document
-
Goode Homestead. Progress reports to licence expiry/renewal, for the period 6/12/1982 to 5/12/1984.
TARGET: Possible diamondiferous kimberlites, Olympic Dam style Cu-Au-U mineralisation, and base metals associated with chemosedimentary iron formations. EXPLORATION: Ground magnetic and gravity surveys, rock chip and loam sampling, and stratigraphic...-
Document
Published: 11 Mar 1985
-
Mount Christie - Mulgathing - Wynbring area. Progress reports and final report to licence full surrender, for the period 29/4/1971 to 18/10/1971.
Special Mining Lease 491 covers an area of poorly exposed Precambrian rocks in the north-western sector of the Gawler Platform of western South Australia. General reconnaissance in late 1969 showed the geology of the area to be dominated by sediments...-
Document
-
Yarna Hill. Annual reports to licence expiry/full surrender for the period 19/11/2002 to 4/12/2010.
An area of sparse basement outcrop situated to the west of Lake Acraman in the central Gawler Ranges district was taken up to explore for possible economic Olympic Dam style mineralisation, based on the licensee's evaluation of past drillhole data...-
Document
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Palthrubie Hill. Annual reports to licence expiry/full surrender for the period 21/5/2002 to 4/12/2010.
An area situated to the west of Lake Acraman in the central Gawler Ranges district was taken up to explore for possible economic Olympic Dam style mineralisation, based on the licensee's evaluation of past drillhole data which indicated that a number...-
Document
-
Carne Outstation (part of the Commonwealth Hill Project). Annual reports to licence full surrender, for the period 10/10/2013 to 18/8/2016.
A very small area centred ~60 km north of Tarcoola has been explored for possible economic buried iron ore, gold, uranium, PGEs and base metals. The licensee's exploration attention here was directed primarily at possible buried IOCG and other style...-
Document
Published: 02 Aug 1916
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
ExpNotes COOBER PEDY: Explanatory Notes COOBER PEDY
There is no abstract created for this record-
Document
-
Nuckulla Hill. Annual reports and final report to licence expiry/full surrender, for the period 19/10/2002 to 28/11/2008.
Exploration for possible buried Ernest Henry or Olympic Dam style copper-gold mineralisation in the Nuckulla Hill area, 120 km north-east of Ceduna, did not progress during the first two years of tenure due to uncertainties in selecting a new remote...-
Document
Published: 22 May 1909
-
Lake Labyrinth (part of the Gawler and the Labyrinth Joint Venture Projects). Data release at second partial relinquishment : project licences' combined annual reports for the period 27/8/1999 to 28/9/2008.
In a continuation of exploration for economic deposits of gold and base metal mineralisation in the Lake Labyrith area, joint venture operator MIM Exploration carried out a proprietary 'MIMDAS' geophysical survey (utilising combined dipole-dipole IP...-
Document
Published: 18 Mar 1909
-
Bulgunnia. Second partial surrender report, for the period 27/10/1992 to 31/8/1996.
A 577 square km area north of Tarcoola, the subject of this report, was relinquished in August 1995. Aeromagnetic interpretation of bedrock geology yielded only a few magnetic anomalies with perceived low priority as epigenetic Cu-Au mineralisation...-
Document
-
Hesso, Bookaloo, Arcoona and Lake Torrens South (the Torrens Project). Annual reports and final reports to project licences' respective sequential full surrender or expiry/full surrender, for the period 23/9/2002 to 18/4/2006.
Olympic Dam or Moonta-Wallaroo style concealed iron-oxide copper-gold mineralisation hosted in Palaeoproterozoic and Mesoproterozoic basement rocks of the Stuart Shelf, and Mount Gunson type younger Neoproterozoic sediment-hosted buried copper...-
Document
Published: 12 Oct 1906