-
North Fowlers Bay - Chundaria. Annual reports and progress reports for the periods 15/9/1993 to 14/9/1998, and 28/10/1998 to 12/3/1999.
North Ltd's Barton Project commenced in 1990 across a number of licences progressively taken out over the western Gawler Craton, which eventually came to include EL 1865. Initial exploration for heavy mineral sand in the Barton-Ooldea area, 100-200...-
Document
Published: 06 May 1999
-
RB 96/00016 Review of mineral exploration - CHILDARA region.
Mineral exploration on CHILDARA 1:250 000 geological map sheet was reviewed from SADME open file Envelopes, to complement an overview of regional prospectivity supported via the recent acquisition of high quality aeromagnetic data and a compilation by...-
Document
Published: 01 May 1996
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-57, Streaky Bay area gravity highs and lows - IOCG and sedimentary uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 subsidised drilling programmes, Minotaur Exploration proposed exploring a large tenement package in the Streaky Bay area simultaneously for Prominent Hill style iron oxide copper gold (IOCG) and palaeochannel...-
Document
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Kottata Well and Broadacres (part of the Yaninee Project). Final report at licences' joint full surrender, for the period 29/9/2003 to 5/6/2008.
Mineral exploration in the Streaky Bay district has addressed the potential for finding Prominent Hill - style Proterozoic IOCG deposits, Phanerozoic iron-depleted gold mineralisation, and Tertiary palaeochannel - hosted sedimentary uranium...-
Document
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
Data release [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports to licence expiry/renewal, for the period 17/2/2005 to 16/2/2010.
Tasman Resources is exploring an area that is centred about 78 km north-west of Tarcoola for possible economic buried occurrences of sedimentary roll front style uranium in Tertiary palaeochannels and nickel mineralisation in Archaean -...-
Document
Published: 19 Apr 1910
-
The Eyre Peninsula Joint Venture Project. Joint annual reports for the period 19/9/2002 to 31/12/2008.
A number of tenements on central northern Eyre Peninsula are being explored by Adelaide Resources and its joint venture partner Newmont Mining for possible economic buried deposits of gold, copper and other base metals which may have formed in the...-
Document
Published: 27 Feb 1909
-
Ilkina Hill. Progress reports to licence expiry/renewal, for the period 8/1/1979 to 7/1/1981.
Drilling of 70 holes (4441 metres) located substantial Tertiary drainage system in excess of 8 km wide in search for sedimentary uranium. Further drilling recommended.-
Document
Published: 01 Jan 1981
-
Yarranna Hill (part of the Narlaby Palaeochannel Project). Data release made in lieu of submitting a first partial surrender report: progress reports for the period 25/10/1979 to 30/6/1981.
Drilling of 490 rotary drillholes (total 43,000 m) in EL 539, the majority being located on a 200 m grid spacing, has revealed the western end of a major Tertiary palaeochannel system, and has intersected significant and widespread subsurface uranium...-
Document
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Thermoluminescence studies of a uraniferous Tertiary palaeochannel, Eyre Peninsula, South Australia. (Appendix 1 to progress report on EL 1214, Dunn Hill, for period ending 18/2/1986).
The research project's aims were : 1. to apply thermoluminescence (TL) methods to the uraniferous Narlaby Palaeochannel 2. to study the granite palaeochannel basement as a possible source of uranium. Artificial TL applied to 162 samples revealed...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports for the period 17/2/2010 to 20/6/2015.
During the sixth licence year, in February 2011, new licence owner Marmota Energy Limited ('Marmota') undertook a reconnaissance biogeochemical survey at the Pundinya prospect, collecting 54 x 30 g grab samples of vegetation of Mulga trees, in the...-
Document
Published: 06 Oct 1915
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
Eureka Bluff. Annual reports and combined 4th-5th annual/final report to licence expiry/full surrender, for the period 29/11/2005 to 28/11/2010.
An area located 50 km north-northeast of Wudinna, and situated on the southern margin of the Gawler Ranges, has been explored for possible economic deposits of both Olympic Dam style epithermal copper-gold-uranium and Tanami style orogenic lode gold,...-
Document
Published: 28 Feb 1911
-
Pinding. Annual reports and final report to licence expiry/full surrender, for the period 10/5/2004 to 24/8/2012.
An area centred approximately 30 km south-west of Tarcoola has been explored primarily for possible economic shear-hosted or epithermal/hydrothermal IOCG style Proterozoic gold, and for inferred Archaean magmatic nickel deposits associated with...-
Document
Published: 14 Sep 1912
-
Yarlbrinda South. Annual reports and final report to licence full surrender, for the period 20/1/2004 to 10/1/2011.
An area located approximately 80 km north-east of Streaky Bay was taken up to explore for possible Hiltaba Suite intrusion-related, structurally controlled gold mineralisation formed at the southern end of the Yarlbrinda Shear Zone (YSZ) , in a...-
Document
-
Carnding. Annual reports and final report to licence full surrender, for the period 18/1/2006 to 22/2/2012.
Three separate small sub-blocks forming a licence in the Tarcoola district have been explored for possible economic buried Tertiary sandstone-hosted uranium mineralisation and for any other metallic mineralisation that may have formed in underlying...-
Document
Published: 29 Feb 1912
-
Warrior. First partial surrender report at licence expiry/renewal, for the period 8/7/2005 to 20/9/2012.
An area located just north of the Trans Australia Railway, between Malbooma and Lyons sidings, has been explored for possible economic secondary uranium mineralisation that could exist in Proterozoic and Tertiary strata overlying known uraniferous...-
Document
Published: 01 Feb 1913
-
Cocata and Palkagee Well. Annual reports and final reports to licences' joint expiry/full surrender, for the period 1/12/2005 to 30/11/2010.
Exploration carried out over two adjacent areas located 50 to 70 km south-west and south of Wudinna was progressed under the terms of two separate joint venture agreements made by the licensee in October 2006, firstly with GE Resources (a subsidiary...-
Document
Published: 27 Jan 1911