-
Cleve Central area. Progress and final reports to licence expiry for the period 7/6/1979 to 11/10/1985.
Exploration for Broken Hill or Aggeneys type Proterozoic stratiform base metal massive sulphides within the Hutchison Group in the Mount Shannan area, north of Cleve, has included the acquisition, processing and interpretation of airborne magnetic,...-
Document
-
Mount Allalone. Progress and annual reports for the period 14/6/89 to 31/7/95.
Base metal exploration of two lead-zinc mineralized areas previously discovered by Billiton and WMC within Hutchison Group metasediments near Mt Allalone, northwest of Buckleboo on central Eyre Peninsula, comprised ground magnetic and EM surveys, RAB...-
Document
Published: 02 Nov 1995
-
RB 93/00004 Tarcoola - Tallaringa bedrock drilling 1991. Summary.
Archaean and Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...-
Document
Published: 01 Feb 1993
-
RB 93/00037 Review of exploration for kaolin in the Kimba area, Eyre Peninsula, South Australia.
During 1969-72, kaolinised bedrock south of Kimba on northern Eyre Peninsula was investigated by Pechiney and CSR Ltd as a potential source of alumina. Exploration drilling of 102 holes outlined 4 broad areas of kaolinisation at Kelly Tank,...-
Document
Published: 01 Sep 1993
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-01, Central Eyre Peninsula (Karkarook area) Mesoproterozoic unconformity - style sedimentary uranium mineral prospects. Project interim and final reports.
Investigation of the potential of a known surface radiometrically-anomalous area 20 km west-southwest of Cleve to contain unconformity - style uranium mineralisation, inferred to occur at and just above the subsurface stratigraphic contact of...-
Document
Published: 31 Mar 1907
-
Data release - as updated [made at SA Director of Mines' discretion] : Wild Horse Plain. Annual reports for the period 8/7/2005 to 23/2/2019, plus partial surrender reports to 23/2/2021.
An upland area located approximately 100 km south-west of Whyalla on the eastern Eyre Peninsula, and with its eastern boundary running parallel to the coast at a distance of 15 km from Cowell and Franklin Harbour, is being explored for uranium,...-
Document
Published: 11 Jan 1921
-
Data release - as updated [made at SA Director of Mines' discretion] : Uley. Annual reports for the period 16/9/2005 to 12/10/2018.
A licence area located 20 km west-southwest of Port Lincoln, which covers the historically worked Uley graphite deposit and environs, was taken up to try to delineate sufficient mineral resources and, eventually, ore reserves of graphite in the Mining...-
Document
Published: 25 Mar 1919
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Data release - as updated [made at SA Director of Mines' discretion] : Eurilla, Lake Gilles, Moseley Nobs and Uno (the Northern Eyre Peninsula Project). Joint annual reports for the period 1/6/2010 to 31/5/2018.
Four tenements, which all lie within a 60 km radius to the north of the township of Kimba, and are mostly located around Lake Gilles, are continuing to be explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...-
Document
Published: 30 Jul 1918
-
Tarcoola - Tallaringa Bedrock Drilling Project.
Archaean, Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...-
Document
-
Caralue Bluff. Annual reports and final report to licence expiry/full surrender, for the period 10/1/1997 to 9/1/2002.
Olympic Dam style Cu-Au-U mineralisation associated with Hiltaba age intrusives, and Tennant Creek style Au mineralisation associated with ironstone units in Hutchison Group metasediments, were the targets in the area surrounding the township of...-
Document
Published: 13 Feb 1902
-
Roopena and Iron Knob. Joint progress reports, joint annual reports and final report to licences' joint full surrender, for the period 22/4/1992 to 23/2/2000.
Exploration for Mount Isa style, Fe-oxide associated Cu-Au mineralisation has targeted Whyalla Group metasediments and associated Hiltaba Suite granitic intrusions within a 110 km long x 15 km wide, north - south aligned corridor situated west of...-
Document
-
Lake Gilles district (the Barna Joint Venture). Annual reports to licence full surrender, for the period 15/3/1993 to 12/7/2000.
Exploration of mainly buried Proterozoic metasedimentary bedrock for possible Broken Hill type Pb-Zn-Ag mineralisation and for Olympic Dam type Cu-Au mineralisation has been performed over two separate areas located 25 km north-east and 50 km east of...-
Document
Published: 11 Aug 1900
-
Mikkira (south-west of Port Lincoln). Progress reports to licence expiry/full surrender for the period 2/3/1981 to 27/10/1987.
Exploration for graphite primarily, and secondarily for BIF-associated massive base metal sulphides, in the area surrounding the historic Uley graphite mine situated 15 km west south-west of Port Lincoln, initially comprised an airborne reconnaissance...-
Document
Published: 30 Oct 1987
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : Karkarook. Combined annual and annual reports to licence expiry/renewal/full surrender, for the period 24/6/2004 to 1/9/2014.
A area centred ~ 25 km west of Cleve is being explored for possible buried economic sediment-hosted or basement unconformity - related uranium mineralisation. The tenement covers part of the Driver River and Driver River Pan which contains a...-
Document
Published: 26 Sep 1914
-
Lake Gilles (latterly part of the Northern Eyre Peninsula Project). Annual reports until the commencement of project licences' joint reporting, plus the final report, for the respective periods 13/2/2007 to 31/5/2010 and 1/6/2014 to 31/5/2015.
A licence area originally comprising three separate sub-blocks located along the northern and southern sides of the Lake Gilles Conservation Park has been explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...-
Document
Published: 19 Jun 1915
-
Cockabidnie North (part of the Cockabidnie JV Project). Annual reports and final report to licence expiry/full surrender, for the period 23/8/2010 to 22/8/2015.
The subject very small licence area, located approximately 25 km north-west of Cleve, and which lies within the northern part of the NNE trending Kimban Campoona Syncline region located on central Eyre Peninsula, has been explored, in concert with...-
Document
Published: 06 Oct 1915
-
Data release [made at SA Director of Mines’ discretion] : Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Annual reports for the period 24/9/2001 to 23/9/2005.
The buried Menninnie Dam zinc-lead(-silver-copper) deposit, located approximately 55 km north of Kimba on northern Eyre Peninsula, and sitting adjacent to the south-eastern margin of the Gawler Ranges, is being evaluated for its future commercial...-
Document