-
RB 58/00031 Geological investigation of a quartzite deposit, section 147, Hundred of Lincoln.
200,000 tonnes of ballast are required by the BHP Co. to construct a proposed tramway that will connect the calcareous sand deposits of Coffin Bay with its bulk loading installation being constructed at Proper Bay, 3 miles south-west of Port Lincoln....-
Document
Published: 10 Feb 1964
-
RB 85/00005 Gneiss and amphibolite deposits. Drilling and testing pavement materials, Poonindie to Tumby, section 7, Hd Koppio.
3 backhoe trenches and 5 drill holes (127 metres) outlined quarry site to yield 80 000 m3 of interbanded gneiss and amphibolite beneath 17 000 m3 of silty soil, clay and weathered rock to an average depth of 2 metres. Additional reserves are available...-
Document
Published: 01 Jan 1985
-
RB 79/00047 Port Lincoln planning study, engineering geology investigation.
The area surrounding Port Lincoln can be divided into three main physiographic regions, the aeolianite plain, the coastal plain, and the highlands. Soil types range from shallow, well-drained terra rossa overlying the aeolianite, to imperfectly...-
Document
Published: 01 Jan 1979
-
RB 90/00074 Explanatory Notes for the ELLISTON 1:250 000 map sheet.
There is no abstract created for this record-
Document
Published: 01 Nov 1990
-
RB 93/00037 Review of exploration for kaolin in the Kimba area, Eyre Peninsula, South Australia.
During 1969-72, kaolinised bedrock south of Kimba on northern Eyre Peninsula was investigated by Pechiney and CSR Ltd as a potential source of alumina. Exploration drilling of 102 holes outlined 4 broad areas of kaolinisation at Kelly Tank,...-
Document
Published: 01 Sep 1993
-
RB 93/00036 Review of mineral exploration, BARTON and OOLDEA 1:250 000 sheets.
Mineral exploration data from the BARTON and OOLDEA 1:250 000 sheet areas, which are held in the SADME open file Envelope system, are summarized and anomalous or significant data highlighted. Targets: - Base metal mineralization from anomalous drill...-
Document
Published: 01 Sep 1993
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-12, Chianti mineral prospect. Project final report.
The subject report describes the results of drilling two fully cored rotary holes totalling 1161.10 m at the Chianti prospect, an unusually-shaped residual gravity anomaly located in Gunson Resources' EL 3264, 20 km north-east of the Mount Gunson...-
Document
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Streaky Bay Lakes. Data release made in lieu of submitting a first partial surrender report at licence expiry/renewal on 18/2/1999: progress reports for the period 19/2/1993 to 18/2/1995.
At the subject licence's Year 6 expiry/renewal on 18/2/1999, a partial relinquishment of 190 square km or ~49.35% of the former area of EL 2489 was effected, in the form of two separate ground portions covering its northern and southern ends. To...-
Document
Published: 13 Mar 1900
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Data release [made at SA Director of Mines' discretion] : Malbrom. First annual report submitted until the commencement of joint venture project joint reporting, for the period 5/4/2013 to 4/4/2014.
A licence composed of four separate small sub-blocks which generally lie ~90 to 120 km north-northeast of Port Lincoln is being explored primarily for extensions to known graphite-bearing horizons which may exist to the north and south of the...-
Document
Published: 29 May 1914
-
Data release - as updated [made at SA Director of Mines' discretion] : Verran and Malbrom (the Verran Project, then the Arno Graphite Project). Joint annual reports plus annual report, for the period 29/1/2014 to 28/1/2019.
Two licence areas together covering the hinterland to Arno Bay and Port Gibbon on eastern Eyre Peninsula, and extending as far north-westwards as Rudall, are being explored for economic buried graphite deposits that may have formed in deformed high...-
Document
-
ExpNotes ELLISTON: Explanatory Notes ELLISTON
There is no abstract created for this record-
Document
-
Port Lincoln - Kimba area. Progress reports to licence expiry/full surrender, for the period 1/11/1967 to 31/10/1969.
The possible areal extent and potential in-ground resources of secondary kaolin developed from deep lateritic weathering of Early Proterozoic basement rocks on central-eastern Eyre Peninsula were investigated by the licensee, with a view to obtaining...-
Document
-
Yalanda Hill. Second partial surrender report for the period 5/12/2005 to 4/12/2008.
Exploration for possible economic deposits of primary uranium mineralisation, undertaken within the now relinquished portions of the subject licence which is centred approximately 65 km north of Cowell, has consisted of field reconnaissance and...-
Document
-
Yalanda Hill. First partial surrender report for the period 5/12/2005 to 4/12/2007.
Exploration for possible economic deposits of primary uranium mineralisation, undertaken within the now relinquished portion of the subject licence which is centred approximately 55 km north-northwest of Cowell, has consisted of field reconnaissance...-
Document
-
Data release - as updated : Cockabidnie. Annual reports and final report to licence expiry/full surrender, for the period 31/5/2001 to 13/8/2015.
Early in 2001, Helix Resources Ltd entered into a joint venture agreement with Centrex Resources Limited to allow it to explore for precious and base metals on some of the tenements held by Centrex on the Eyre Peninsula in South Australia, including...-
Document
-
RB 2000/00033 Mineral potential of the proposed Gawler Ranges National Park.
In late 1999, the South Australian Government approved the purchase of 1000 square km of land in, and adjacent to, the Gawler Ranges, for the creation of the Gawler Ranges National Park. This land has significant mineral potential, and has been...-
Document
Published: 01 Sep 2000
-
Cowell nephrite deposit. Consultant's geological appraisal reports (including a progress report about detailed mapping of nephrite pods on Schiller's leases), compiled over the period June to November 1970.
A mining consultant was engaged by mineral claim option holder Murumba Minerals to assess the commercial potential of a rare (for Australia) grouping of lens style nephrite deposits located about 20 km north of Cowell, which had only been mined on a...-
Document
Published: 11 Nov 1970