-
RB 77/00080 Kalangadoo town water supply. Well completion report, Kalangadoo TWS no. 1 (MA 94).
Kalangdoo Town Water Supply (T.W.S.) No. 1 well was drilled cable tool during February - May, 1977, and subsequently production tested. The unconfined Gambier Limestone aquifer was encountered between 5.5 and 86m, and was later cemented off down to...-
Document
Published: 01 Jan 1977
-
RB 78/00009 EWS Department - Mount Gambier town water supply standby well no. 7.
The first of a series of high yielding standby wells exploring the confined aquifer was drilled to 208 metres using both rotary and cable tool. Production interval is from 184.6 to 205.3 metres in unconsolidated sands of Dilwyn Formation.-
Document
Published: 01 Jan 1978
-
RB 79/00076 Naracoorte town water supply, completion report for well no. 10 - EWS Department.
A new town water supply well, Naracoorte no. 10, encountered permeable confined aquifer sands at 160 m depth. Subsequent testing showed the well to have a yield of from 6000 to 7000 cubic m/day at a recommended pump intake depth of 85 m, with less...-
Document
Published: 01 Jan 1979
-
RB 95/00006 Micropalaeontological analysis of 26 petroleum wells in the Gambier Basin, South Australia.
More than 400 samples (cuttings and core) from 26 petroleum wells in the South Australian part of the Gambier Basin were examined. Their lithology and foraminiferal fauna were recorded and their age and environment of deposition deduced where...-
Document
Published: 01 Jan 1995
-
RB 00734 Stratigraphy and correlation of the marine sediments of the Gambier Embayment (Otway Basin).
The sediments of the Gambier Embayment are mainly of Cretaceous and Tertiary age. Lower Cretaceous subsurface units have been referred to outcropping rocks of the Otway and Merino Groups, but satisfactory criteria for their identification with...-
Document
Published: 01 Apr 1900
-
RB 71/00077 Observation bore no.1, Hundred Townsend, section 125. Micropalaeontology and stratigraphy.
The drilled section was subdivided into Cainozoic units. The Gambier - Lacepede contact is probably disconformable. The planktonic foraminiferal sequence in the Lacepede Formation was studied in detail, and important biostratigraphic datums selected....-
Document
Published: 12 May 1971
-
RB 71/00200 Observation bore no. 2, Gambier Embayment of the Otway Basin. Tertiary micropalaeontology and stratigraphy.
The bore penetrated Coomandook Formation, Gambier Limestone, Lacepede Formation and Knight Formation including Burrungule Member. The three-part structure of the Gambier Limestone in the Oligocene might be formalized as members, and two zones are...-
Document
Published: 16 Dec 1971
-
RB 76/00038 Completion report and well test, Kingston town water supply bore no. 10, secn 504 Hundred of Lacepede - EWS Department.
A new well, Kingston No. 10, was drilled on section 504, hundred of Lacepede to augment Kingston's water supply. A flow of water (5 1/sec) was obtained after intersecting Kongorong Sand at 86m. Subsequent well testing showed it to have a safe yield of...-
Document
Published: 22 Mar 1976