-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Mount Gunson and Mount Moseley (part of the Mount Gunson JV Project). Partial surrender reports, for the overall tenure period 15/7/1994 to 25/5/2021.
No exploration work has been undertaken on either of the recently relinquished portions of the two subject licences. Within the JV project tenements, exploration targets being addressed are: (1) possible economic buried IOCG (iron oxide-associated...-
Document
Published: 17 Oct 1918
-
South Gap. Annual reports and final report to licence expiry/full surrender, for the period 24/7/2017 to 23/7/2021.
A small area situated just north of the Beda Arm of Lake Torrens, and ~20 km north-northeast of the Carrapateena deposit, has been explored for possible buried high grade IOCG mineralisation that may be present in Proterozoic basement rocks. It was...-
Document
Published: 23 Aug 1921
-
Data release - as updated : Woordlemmie. Annual reports to licence full surrender, for the period 22/6/2011 to 22/11/2019.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings, covering ground adjacent to the south-western and southern margins of Pernatty Lagoon, has been explored for possible buried economic...-
Document
Published: 26 Nov 1919
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2013 to 6/10/2018.
An area located ~25 km north-east of Woomera is being explored for possible economic buried Cu-Co-Au mineralisation which may have formed in the Adelaidean metasedimentary cover rocks of the Stuart Shelf. Under Gunson Resource's prior tenure of EL...-
Document
Published: 07 Dec 1918
-
Yudnapinna [West]. Combined first annual/final report to licence expiry/full surrender, for the period 22/9/2020 to 21/9/2021.
Two contiguous exploration licences, ELs 6522 and 6523, were secured in the Yudnapinna district to apply new concepts and techniques aimed at revitalising the rate of copper-gold mineral deposit discovery in South Australia. The licences’ area lay...-
Document
Published: 03 Nov 1921
-
Yudnapinna [East]. Combined first annual/final report to licence expiry/full surrender, for the period 22/9/2020 to 21/9/2021.
Two contiguous exploration licences, ELs 6522 and 6523, were secured in the Yudnapinna district to apply new concepts and techniques aimed at revitalising the rate of copper-gold mineral deposit discovery in South Australia. The licences’ area lay...-
Document
Published: 03 Nov 1921
-
Yalymboo (part of the West Roxby Project). Annual reports to licence expiry/transfer, for the period 7/3/2007 to 6/3/2012.
An area centred approximately 60 km south-southwest of Woomera was taken up to explore the IOCG mineralisation potential of an isolated, oval-shaped regional gravity anomaly called the Evelyn Dam prospect, which licensee Archer Exploration thought...-
Document
Published: 08 Apr 1912
-
Data release [made at SA Director of Mines' discretion] : Andamooka (part of the Stuart Shelf Project). Progress reports to licence expiry/renewal, for the period 2/5/1975 to 1/5/1977. [ Index Part 1 of 2 ].
An inaugural exploration licence covering land in the Roxby Downs Station and Andamooka Station holdings was taken up by Western Mining Corp. (WMC) to document the stratigraphic section present in the northern portion of the Stuart Shelf tectonic...-
Document
-
The Lookout (part of the Mintabyng Project). Annual reports plus final report to licence full surrender, for the period 29/11/2012 to 9/6/2015.
In late November 2012, three adjoining areas in the central Gawler Craton were taken up by Woomera Exploration Limited (WEX), an unlisted public company, for the purpose of minerals exploration. Within the subject licence area, the easternmost of the...-
Document
Published: 23 Jun 1915
-
Mount Sabine (part of the Mintabyng Project). Annual reports plus final report to licence full surrender, for the period 29/11/2012 to 9/6/2015.
In late November 2012, three adjoining areas in the central Gawler Craton were taken up by Woomera Exploration Limited (WEX), an unlisted public company, for the purpose of minerals exploration. Within the subject licence area, the central of the...-
Document
Published: 23 Jun 1915