-
Mulga Well Outstation. First partial surrender report at licence expiry/renewal, for the period 22/6/2004 to 21/6/2009.
Soil and calcrete geochemical data is presented for the now relinquished portions of EL 3211.-
Document
Published: 09 Sep 1909
-
Coondambo. Second partial surrender report, for the period 7/6/2001 to 6/6/2009.
As part of a search for possible buried economic Olympic Dam type IOCG-U deposits in volcanic basement, or for stratiform Athabasca Basin type uranium occurrences in the overlying cover, farminee Marathon Resources carried out detailed calcrete...-
Document
-
Data release - as updated : McDouall Peak. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
Quasar Resources has been exploring a large licence area centred approximately 40 km south-west of the Prominent Hill mine for possible economic buried iron-oxide-copper-gold (IOCG) style mineralisation, epithermal base metal mineralisation of the...-
Document
Published: 27 Oct 1922
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Centre Hill (the Kingoonya JV Project). Annual reports to licence expiry/full surrender, for the period 7/3/2006 to 10/5/2012.
An area extending for approximately 80-115 km south-east of Tarcoola has been explored for possible economic mesothermal gold±copper mineralisation formed in Mesoproterozoic igneous basement, possible unconformity - related uranium mineralisation at...-
Document
Published: 12 Jul 1912
-
Coondambo. Annual reports and final report to licence expiry/full surrender, for the period 7/6/2001 to 4/7/2011.
An area located close to the western margin of the Stuart Shelf, and approximately 120 km south-west of the Olympic Dam deposit, was taken up to explore for possible economic IOCG mineralisation hosted by Gawler Range Volcanics (GRV) and Hiltaba Suite...-
Document
Published: 13 Apr 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
Lake Gairdner North (part of the West Roxby Project). Data release: annual reports for the period 23/7/2007 to 22/7/2012.
An area centred approximately 55 km west-southwest of Woomera was taken up to explore its IOCG mineralisation potential. Early field work consisted of the acquisition of infill gravity coverage over an irregular outline regional gravity low anomaly...-
Document
-
Pandurra. Combined first annual/final report to licence full surrender, for the period 26/6/2013 to 23/10/2014.
A small area centred ~50 km west of Port Augusta was taken up to explore for possible buried epigenetic and structurally controlled gold mineralisation in Archaean and Proterozoic basement rocks. The target was related to a 3.5 km long, >3 ppb Au...-
Document
-
Woocalla. First partial surrender report, for the period 4/8/1995 to 3/8/1999.
The area now relinquished, which comprises 322 square km or 13.5% of the originally granted area, is the northern of two discrete licence sub-blocks located approximately 25 km south-east of Pimba. Scattered base metal geochemical anomalies found in...-
Document