Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
RB 98/00008 Geochemical studies of the regolith at the Mount Gunson copper deposits, Stuart Shelf, South Australia.
The principal objective of the Cooperative Research Centre for Landscape Evolution and Mineral Exploration (CRC LEME) Shields Program and the Primary Industry and Resources of South Australia (PIRSA) Regolith Terranes Group in South Australia is to...-
Document
Published: 01 Feb 1998
-
Mount Gunson ore controls as a basis for further exploration.
This report presents the geological setting and postulated ore controls for the Mount Gunson style of mineralisation, with an expansion on the inferred metal concentration mechanism and its quantitative feasibility. Recommendations for two optimal...-
Document
Published: 17 Aug 1971
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document
-
Woomera and Wirrappa. Annual reports and first joint annual report, plus final report to licences' joint full surrender, for the period 14/1/2013 to 13/11/2018.
Two adjacent areas located immediately south and east of Woomera township were taken up to search for possible buried economic stratabound deposits of copper or other metals that may have formed in the Neoproterozoic and Mesoproterozoic cover sequence...-
Document
Published: 07 Jan 1919
-
Lake Torrens - Port Augusta and Point Paterson areas. Progress reports to licence expiry/renewal, for the period 26/11/1977 to 30/11/1979.
SALT MINING STUDY: Field tests on the feasibility of Lake Torrens salt production to supply raw material for the planned Redcliff Petrochemical Project were continued, with project planning technical data demonstrations given to visiting officials of...-
Document
-
Mount Gunson district. Geological mapping data, 1971-1972.
A mapping programme was undertaken by the licensees to test the possibility of the near-mine area to Mount Gunson being a suitable host environment for stratiform copper mineralisation. The exploration hypothesis used was that such mineralisation...-
Document
Published: 21 Apr 1972
-
Salt Creek. Progress reports to licence expiry/renewal, for the period 13/9/1976 to 12/9/1978.
Possible buried stratabound copper mineralisation of Mount Gunson / Cattlegrid type was the target of exploration performed on an area of the Stuart Shelf located 60 km east of Woomera. After conducting detailed 1:12,000 and 1:16,000 scale geological...-
Document
-
Cattlegrid mine and surrounding lease areas. Mine planning calculations of deposit reserves, including those of orebody extensions, plus a report on a review of copper resources, for the period 1983-1984.
There is no abstract created for this record-
Document
-
Dingo Hill. Progress reports to licence expiry/renewal, for the period 23/3/1977 to 22/3/1979.
An area of the southern Stuart Shelf, with untested potential for hosting possible stratiform base metal deposits within a probable concealed Early Proterozoic sedimentary basin embayment, was explored by BP as part of their regional mineral...-
Document
-
Mount Eba. Progress reports and final report to licence expiry/full surrender, for the period 23/2/1978 to 22/2/1979.
In a search for possible buried stratiform base metal deposits of Mount Gunson type in an area surrounding Mount Eba Homestead, Carpentaria undertook a field reconnaissance of surface geological structures, followed by a study of aerial photographs...-
Document
-
Data release [made at SA Director of Mines' discretion] : Pernatty Lagoon [East]. Annual reports to licence expiry/renewal, for the period 27/6/1997 to 26/6/2002.
An area of the Stuart Shelf located between Pernatty Lagoon and the Beda Arm of Lake Torrens, with its western boundary lying 15 km east of the historic Mount Gunson copper mining field, is being explored for possible economic basement-hosted IOCG...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Pernatty [Station]. Annual reports for the period 29/11/2005 to 28/11/2009.
An area centred approximately 110 km north of Port Augusta, covering part of the Pernatty Ridge plateau on the south-western side of Lake Torrens, approximately 145 km south-east of the Olympic Dam mine, was taken up to explore for possible economic...-
Document
Published: 24 May 1910
-
RB 2016/00024 Mineral Systems Drilling Program Rock Shack - [a pictorial catalogue of the] outcrop sample collection for the MSDP southern Gawler Ranges margin.
Between July 2015 and April 2016, the Geological Survey of South Australia, in collaboration with the Deep Exploration Technologies Cooperative Research Centre (DET CRC), Minotaur Exploration Limited and Kingston Resources Limited, carried out a...-
Document
Published: 01 Dec 2016
-
RB 2016/00014 Geology of the Six Mile Hill 1:75 000 Special Edition Map Sheet.
The Six Mile Hill 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Dec 2016
-
Regolith map of the southern Gawler Ranges margin (300 dpi & 600 dpi pdf formats).
This inaugural regolith map of the southern Gawler Ranges margin provides a valuable regional overview of the main regolith types and their associated landforms, plus a general outline of the major areas of bedrock or regolith-dominated terrain, as...-
Map
Published: 14 Jul 2016
- ZIP
-
Hesso, Bookaloo, Arcoona and Lake Torrens South (the Torrens Project). Annual reports and final reports to project licences' respective sequential full surrender or expiry/full surrender, for the period 23/9/2002 to 18/4/2006.
Olympic Dam or Moonta-Wallaroo style concealed iron-oxide copper-gold mineralisation hosted in Palaeoproterozoic and Mesoproterozoic basement rocks of the Stuart Shelf, and Mount Gunson type younger Neoproterozoic sediment-hosted buried copper...-
Document
Published: 12 Oct 1906
-
Pernatty Lagoon. First partial surrender report at licence expiry/renewal, for the period 20/7/1973 to 19/7/1975.
Exploration conducted by CSR Ltd for possible economic stratiform base metal deposits in the western part of EL 81 addressed several targets, including Cattle Grid type disconformity - related copper mineralisation, Sweet Nell / MG14 type...-
Document