-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release made upon the expiry/full surrender of subsequent licences : respective annual and joint annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 1 of 2 ].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. The subject two areas covering the northern outcropping Peake and Denison Ranges basement inliers were taken up by Pancontinental Mining to test for possible...-
Document
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 1 of 2].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. Exploration carried out over the Peake and Denison Inliers by the joint venturers since mid-2000 has targeted possible large-scale Proterozoic ironstone-hosted...-
Document
Published: 15 Oct 1909
-
Peake and Denison Ranges. Data release made at subsequent licences' expiry/full surrender : annual reports for the period 12/7/1993 to 11/7/1995.
An area covering most of the northern outcropping Peake and Denison Ranges basement inliers was taken up by Pancontinental Mining to test for possible economic occurrences of lead-zinc and copper-gold mineralisation (broadly matching Mount Isa Block,...-
Document
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 2 of 2].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. In the latter half of 2003, new project partner Phelps Dodge reprocessed aeromagnetic and gravity data and produced a magnetic/structural interpretation, from which...-
Document
Published: 15 Oct 1909
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated : Mount Toodla. Annual reports to licence expiry/full surrender, for the period 23/8/2005 to 18/11/2015.
Within a licence area centred ~65 km east of Oodnadatta and located about 320 km NNW of Olympic Dam, a major, high amplitude (10 mGal) regional gravity anomaly associated with magnetic anomalies and lying within the G2 transcontinental lineament...-
Document
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
Anna Creek (the Peake and Denison Project). Annual reports to licence expiry/full surrender, for the period 25/10/2019 to 24/10/2021.
A large area centred ~15 km to the south-east of Algebuckina on the Oodnadatta Track has been explored for possible buried economic IOCG type basement-hosted mineralisation, that may have formed within Paleo- to Mesoproterozoic rocks like those...-
Document
Published: 15 Nov 1921
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Cootanoorina Hill. Data release made in lieu of submitting a partial surrender report at licence expiry/renewal : annual reports for the period 6/4/2010 to 5/4/2015.
No work took place on the subject licence area, located ~ 60 km south of Oodnadatta on the western side of the Peake and Denison Ranges, during its first four years of tenure. It had been taken up originally to explore for possible undercover roll...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Denison. Annual report for the period 13/3/2015 to 12/3/2019.
A small area centred ~80 km south-east of Oodnadatta is being explored for possible buried economic iron-oxide associated copper-gold-uranium (IOCGU) style mineralisation, as typified by the Olympic Dam and Prominent Hill deposits. The tenement was...-
Document
Published: 12 Mar 1916
-
North-eastern Peake and Denison Inliers. Final report for approved geophysical work programme, Project ADI RD01-094 [part of Accelerated Discovery Initiative Round 1, 2021].
Licenceholder Minotaur Exploration has received a grant of ADI Round 1 subsidy funds from DEM to assist it in understanding the Proterozoic basement geology of the Peake and Denison Inliers, with the aim of making a step-change in the modelling of...-
Document
-
Mount Charles (part of the Peake and Denison Project). Annual reports plus final report to licence full surrender, for the period 9/8/2010 to 6/8/2013.
An area centred ~130 km south-east of Oodnadatta, and covering part of the exposed eastern flank of the Margaret Inlier of the Peake and Denison Ranges, has been explored for possible buried IOCG mineralisation which may have formed in the...-
Document
-
Sunny Creek. First partial surrender report for the period 8/10/2007 to 7/10/2008.
Within the now relinquished portions of an area located near the western shoreline of Lake Eyre North, approximately 60 km north of William Creek, part of a new regional gravity survey was undertaken during July 2007, with 274 stations read at a...-
Document
-
Sunny Creek. Annual reports to licence surrender for the period 8/10/2007 to 26/3/2010.
In an area located near the western shoreline of Lake Eyre North, approximately 60 km north of William Creek, part of a new regional gravity survey was undertaken during July 2007, with 601 stations read at a station spacing of 500 m in order to...-
Document
Published: 09 Dec 1910
-
Mount Margaret (part of the Peake and Denison Project). Annual reports plus final report to licence full surrender, for the period 22/10/2009 to 6/8/2013.
An area centred ~110 km north of William Creek, and covering part of the exposed eastern flank of the Margaret Inlier of the Peake and Denison Ranges, has been explored for possible buried IOCG mineralisation which may have formed in the...-
Document
-
Neales River (part of the Oodnadatta Project). Annual reports and final report to licence expiry/full surrender, for the period 26/4/2002 to 11/7/2010.
The subject licence, located immediately south of Oodnadatta, was selected as an area with the potential to host economic iron oxide - associated copper-gold (IOCG) mineralisation similar to that discovered at Olympic Dam and Prominent Hill....-
Document
Published: 30 Jul 1910
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress reports and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 1 of 2 ].
Diamond exploration undertaken within the southern of two adjoining licence areas taken up along part of the western flank of the Peake and Denison Ranges, that is centred ~100 km south-east of Oodnadatta, was aimed at discovering the source(s) of...-
Document
-
Blyth Creek. Annual reports and final report to licence surrender, for the period 2/1/2007 to 30/9/2013.
Exploration for possible economic IOCG type base and precious metal deposits in buried basement rocks, and for possible roll front style sedimentary uranium mineralisation in overlying Jurassic-Cretaceous Eromanga Basin sediments, within an area...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-26 - Energia Minerals Limited Gawler Craton Project, IOCG-prospective Blyth Creek BC4 gravity anomaly. Drilling project final report.
During July 2012, at a location approximately 90 km south-east of Oodnadatta, EL 3680 licensee Energia Minerals completed the drilling at the BC4 gravity anomaly target of a single vertical rotary mud/diamond tailed hole to a total depth of 144.3 m...-
Document