-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
Mount Edarteenya (part of the Woodmurra Project). First annual report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 70 km east of Oodnadatta for possible economic, buried Broken Hill or Cannington type Pb-Zn-Ag mineralisation hosted by inferred prospective basement metasedimentary and metavolcanic rocks, has consisted of...-
Document
-
Mount Perrypollkot (part of the Woodmurra Project). First annual report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 80 km east-southeast of Oodnadatta for possible economic, buried Broken Hill or Cannington type Pb-Zn-Ag mineralisation hosted by inferred prospective basement metasedimentary and metavolcanic rocks, has...-
Document
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 1 of 2].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. Exploration carried out over the Peake and Denison Inliers by the joint venturers since mid-2000 has targeted possible large-scale Proterozoic ironstone-hosted...-
Document
Published: 15 Oct 1909
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release upon the expiry/full surrender of subsequent licences : respective annual and combined annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 2 of 2 ].
[ Note - here is only Part 2 of an abstract relating to 2 separately indexed parts ]. During the latter half of 1997, just before it transferred project management to BHP Minerals, Renison Gold Corp. carried out reconnaissance bedrock geochemical...-
Document
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 2 of 2].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. In the latter half of 2003, new project partner Phelps Dodge reprocessed aeromagnetic and gravity data and produced a magnetic/structural interpretation, from which...-
Document
Published: 15 Oct 1909
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated : Mount Toodla. Annual reports to licence expiry/full surrender, for the period 23/8/2005 to 18/11/2015.
Within a licence area centred ~65 km east of Oodnadatta and located about 320 km NNW of Olympic Dam, a major, high amplitude (10 mGal) regional gravity anomaly associated with magnetic anomalies and lying within the G2 transcontinental lineament...-
Document
-
Davenport. Annual reports and final report to licence expiry/full surrender, for the period 1/5/2014 to 30/4/2018.
An area located on and adjacent to the north-eastern side of the Margaret Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 120 km south-east of Oodnadatta, has been explored for possible buried economic IOCG...-
Document
Published: 21 May 1918
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 1916
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Peake Hill. Annual reports to licence expiry/full surrender, for the period 9/7/2013 to 8/7/2017.
A small area located on and adjacent to the eastern margin of the Denison Range, ~ 60 km south-east of Oodnadatta, has been explored for possible buried economic sediment-hosted uranium mineralisation. During licence Year 1 the licensee reviewed all...-
Document
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 1910
-
Mount Kingston. Progress reports and final report to licence expiry/full surrender, for the period 10/10/1979 to 26/4/1984.
Diamond exploration undertaken over an area situated 70 km south-east of Oodnadatta included photogeological studies, the acquisition of a 2400 line km low level aerial magnetic and radiometric survey, and geochemical analyses of 452 reconnaissance...-
Document
-
Mount Charles. Progress reports and final report to licence full surrender, for the period 9/12/1991 to 26/10/1992.
Possible economic epithermal/hydrothermal uranium and base metal deposits, hosted by Early to Middle Proterozoic meta-igneous and metasedimentary basement rocks partly concealed by Mesozoic and Cainozoic cover in the north-eastern Peake and Denison...-
Document
Published: 13 Nov 1992
-
West Lake Eyre. First progress report plus final report to licence full surrender, for the period 25/1/1980 to 13/6/1980.
Dampier Mining's main objective in taking out this licence was to test a large magnetic complex, situated east of the Peake and Denison Ranges and west of Lake Eyre, for possible economic buried base and precious metal deposits. Grid-based ground...-
Document
-
Peake and Denison Project [Part]. Data release upon the surrender of licence. Annual report (15/4/1999) submitted until the commencement of the BHP Billiton - Rio Tinto JV combined reporting. Plus the JV final report on this licence, to 15/4/2003.
Exploration carried out over a south-eastern flanking portion of the Peake and Denison Inliers has targeted possible large-scale Proterozoic ironstone-hosted Cu-Au deposits within a highly magnetic, multiply deformed and metamorphosed buried basement...-
Document
-
Algebuckina and Peake [Algebuckina South]. Third and second partial surrender respectively : reports for the period 3/8/2004 to 2/8/2009.
Data from part of a heliborne EM survey conducted in September 2007 over the now relinquished portions of EL 3226 has been released. This survey was flown in a search for possible stratabound roll-front style or palaeochannel hosted sedimentary...-
Document
Published: 12 Mar 1910
-
Mount Charles (part of the Peake and Denison Project). Annual reports plus final report to licence full surrender, for the period 9/8/2010 to 6/8/2013.
An area centred ~130 km south-east of Oodnadatta, and covering part of the exposed eastern flank of the Margaret Inlier of the Peake and Denison Ranges, has been explored for possible buried IOCG mineralisation which may have formed in the...-
Document
-
Algebuckina. Fifth partial surrender report, for the period 3/8/2004 to 28/9/2012.
Portions of the subject licence located at the northern end of the Peake and Denison Ranges have been relinquished owing to their perceived lower exploration potential. All of the reported work that was done within these licence portions pertains to...-
Document
Published: 12 Oct 1912