-
1981 and 1983 seismic surveys, Overland Corner OC81 and OC83, final reoprt.
AIM: The principal objective of the OC81 Seismic Survey and a calculated, normal moveout velocity-based seismic reflection time stratigraphic well tie to North Renmark 1 was to determine the areal extent of the prospective Permian (and Devonian?)...-
Document
-
1987 seismic survey, Cooltong, final report.
AIM: A detailed grid of 9 lines totalling 71.6 line kms was shot in this survey to firm up two previously recognised but insufficiently profiled leads mapped on line OC85-22, near the Renmark Trough Permian depocentre. METHODS: Survey dates: 23 July -...-
Document
-
1986 seismic survey, Calperum, final report.
AIM: Two small seismic grids comprising 2 groups each of 6 close-spaced lines, totalling 81.76 line kms, were shot within the Renmark Trough to detail 2 previously identified leads interpreted along line OC85-22. METHODS: Survey dates: 23-30 January...-
Document
-
PEL 16. Progress and technical reports for the period 16/6/80 to 15/5/90.
Reports document the petroleum exploration history and search philosophy behind PEL 16 over two licence terms, and provide some new raw and interpretative geophysical and geochemical data based on the conduct of 5 seismic surveys and the drilling of 2...-
Document
Published: 15 May 1990
-
1985 seismic survey, Overland Corner OC85, final report.
AIM:Three regional lines totalling 45.24 line kms were shot in this survey to - infill the existing 1983 and 1981 vintage IMC seismic grid and investigate a possible low side fault closure previously identified along the Renmark Fault Zone; -...-
Document