-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-03, Marathon South mineral prospect. Project interim and final reports.
During exploration of Exploration Licence 3209 situated on the northern Stuart Shelf, gravity and magnetic modelling performed in early 2004 highlighted several anomaly source bodies, which immediately became of much interest as potential iron-oxide...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Mount Gunson. Progress reports and technical reports to licence expiry/re-issue over a larger area, for the period 25/10/1979 to 20/12/1985.
As part of an ongoing search for extensions to the Cattlegrid orebody style of stratiform Cu-Fe-Mn mineralisation within its exploration licences on the Stuart Shelf, besides testing for any indications of Olympic Dam type Cu-U-Au deposits in the...-
Document
-
Data release - as updated : One Tree Hill (part of the Manna Hill Project). Annual reports and final report to licence expiry/full surrender, for the period 5/11/2007 to 4/11/2017.
Exploration for possible economic vein-style and structurally controlled gold with Adelaidean bedrock sediments in an area located between the towns of Yunta and Manna Hill was conducted using low cost remote sensing, geochemical and geophysical...-
Document
Published: 15 Dec 1917
-
Data release - as updated : Kapunda North / Bagot Well North (part of the Eudunda Project). Licence-specific annual reports and final report submitted to licence expiry/full surrender, for the period 15/11/2005 to 12/12/2015.
Exploration for copper mineralisation within an area centred immediately north-northeast of Kapunda has as its initial objective to find shallow deposits of oxide and carbonate ores similar to those mined historically at Burra and Kapunda, focussing...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1998 to 17/10/2008 [ Index Part 2 of 4 ].
Stuart Metals is primarily exploring EL 1946 for stratiform copper mineralisation of the various styles known to be present in the Mount Gunson district. In addition, the company regards the largely unknown Mesoproterozoic basement to have strong...-
Document
-
Pandurra. Progress reports and final report to licence expiry/renewal, for the period 7/6/1977 to 6/6/1979.
In a continuing search for possible shallow Mount Gunson type stratiform copper deposits within Adelaidean strata of the southern Stuart Shelf, detailed investigations conducted near Pandurra Homestead have included geological mapping, rock chip...-
Document
-
Yudnapinna [West]. Combined first annual/final report to licence expiry/full surrender, for the period 22/9/2020 to 21/9/2021.
Two contiguous exploration licences, ELs 6522 and 6523, were secured in the Yudnapinna district to apply new concepts and techniques aimed at revitalising the rate of copper-gold mineral deposit discovery in South Australia. The licences’ area lay...-
Document
Published: 03 Nov 1921
-
Yudnapinna [East]. Combined first annual/final report to licence expiry/full surrender, for the period 22/9/2020 to 21/9/2021.
Two contiguous exploration licences, ELs 6522 and 6523, were secured in the Yudnapinna district to apply new concepts and techniques aimed at revitalising the rate of copper-gold mineral deposit discovery in South Australia. The licences’ area lay...-
Document
Published: 03 Nov 1921
-
Mount Craig Copper Project. Final report for June to December 2021 geophysical and drilling program, Project ADI RD02-268 [part of Accelerated Discovery Initiative Round 2, 2021].
An area centred ~28 km east of Hawker is being explored for possible buried epigenetic/hydrothermal, skarn style and sediment-hosted stratabound base and precious metals mineralisation that may have formed within prepared Adelaidean metasedimentary...-
Document
Published: 02 Nov 1921
-
Data release - as updated [made at SA Director of Mines’ discretion] : Boolooroo Goldfield and Kate Hill. Joint annual reports for the period 2/1/2009 to 8/2/2019.
Two adjoining licence areas located ~ 40 km north-east of Leigh Creek township, in the ranges lying immediately east of the Telford coal basin, are being explored for possible economic occurrences of marble rock which are believed to hold enormous...-
Document
-
Uro Bluff. Progress reports to licence expiry/full surrender, for the period 7/6/1977 to 6/6/1979.
Stratiform copper deposits, hosted within the Neoproterozoic Tapley Hill Formation, and possible diamondiferous kimberlite bodies were targeted in this exploration programme. Low value base metal intersections made from drilling (2 diamond holes,...-
Document
-
Tregalana - Sugarloaf Hill area. Progress reports to licence expiry/renewal, for the period 21/6/1976 to 20/6/1978.
Vertical percussion drilling (4 holes totalling 577 m) and diamond drilling (3 holes totalling 538.4 m) undertaken in the Tregalana and Sugarloaf Hill areas of the Stuart Shelf disclosed weak base metal mineralisation (0.05-0.65% Cu spread unevenly...-
Document
-
Price. Progress reports to licence expiry/renewal, for the period 24/2/1975 to 23/2/1977.
In continuing regional exploration conducted over north-eastern Yorke Peninsula, further reconnaissance stratigraphic drilling and wireline geophysical logging (in 3 vertical rotary percussion holes totalling 373 m) was carried out in May 1976 to test...-
Document
-
Australia Plains and The Gums Station. Final reports at licences' joint full surrender, for the period 31/5/2010 to ending 30/5/2012.
Exploration for possible economic buried gold and/or copper mineralisation that may have formed in a volcanic or porphyry- related setting, within an area of the Adelaide Geosyncline situated 130-140 km north-northeast of Adelaide, has comprised the...-
Document