-
Tarlton Knob and Cadnia Hill. Joint progress and final reports to licences' expiry/full surrender for the period 23/3/1973 to 22/3/1974.
A consultant's detailed regional geological study of the northern Willouran Ranges, and then his very close examination of the apparent controls on known diapir-related exposed epigenetic / stratabound copper mineralisation, have identified three...-
Document
-
Mount Gunson - Pernatty. Quarterly reports and annual reports to licence expiry/full surrender, for the period 14/2/1987 to 15/4/1994.
Ongoing copper exploration in the Mount Gunson area was directed primarily at locating economic stratiform mineralisation in the Tapley Hill Formation, which overlies Pandurra Formation and the associated Cattlegrid orebody. New work comprised...-
Document
-
AMIRA Project P544: Proterozoic sediment-hosted copper deposits. Quarterly progress reports and final report for the period July 2000 to October 2003.
The original objectives of this project were: 1) To understand the processes responsible for transporting, concentrating and fixing copper and other ore constituents during sedimentary basin evolution 2) To document the various stages and paragenesis...-
Document
-
Mount Gunson. Extension of ore reserves proposal (as revised).
There is no abstract created for this record-
Document
-
Mount Gunson Mines' lease areas. Review of copper resources.
There is no abstract created for this record-
Document
-
Data release - as updated : Wilmington. Annual reports to licence full surrender, for the period 15/4/2009 to 8/3/2018.
An area located within the western Adelaide Fold Belt adjacent to the eastern margin of the Gawler Craton, and centred approximately 20 km south-east of Port Augusta, has been explored for possible economic buried copper mineralisation associated with...-
Document
Published: 09 Mar 1918
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Breaden Hill. Progress reports and final report to licence expiry/full surrender, for the period 13/11/1967 to 12/11/1969.
Evaluation of possible commercial, buried stratiform copper deposits in the Willouran Ranges south of Marree was the objective of geological mapping, geochemical sampling and shallow drilling undertaken by Noranda. Their interest in the region was...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 1918
-
Cattlegrid mine and surrounding lease areas. Mine planning calculations of deposit reserves, including those of orebody extensions, plus a report on a review of copper resources, for the period 1983-1984.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Boolooroo Goldfield and Kate Hill. Joint annual reports for the period 2/1/2009 to 8/2/2019.
Two adjoining licence areas located ~ 40 km north-east of Leigh Creek township, in the ranges lying immediately east of the Telford coal basin, are being explored for possible economic occurrences of marble rock which are believed to hold enormous...-
Document
-
Copley and Leigh Creek. Progress reports for the period 4/10/1982 to 27/1/1991.
TARGET: Exploration and evaluation of known secondary copper occurrences and exploration for gold and phosphates in the Lyndhurst-Copley region. EXPLORATION: Including the work done previously in EL 929, exploration activities undertaken since 1981...-
Document
Published: 01 Jan 1991
-
Groundwater investigations. Rosmann East and Paltridge North mines near Copley, South Australia. (Appendix 3 to EL 1580, Leigh Creek. Third quarterly report to 27/1/90.).
Existing test results from dewatering wells over the proposed open cut mining pit were reanalysed and a recharge experiment carried out in an area hydraulically separate from the operating pit.-
Document
Published: 01 Jan 1990
-
Kapunda copper prospect. Exploration progress reports and related consultants' technical reports for the period February 1972 to April 1973.
There is no abstract created for this record-
Document
Published: 27 Apr 1973
-
RB 69/00006 Exploration of the Mount Coffin Diapir, northern Flinders Ranges (logs not published).
Diapiric marbles and dolomitic siltstone breccia of presumed Willouran age intrude younger Umberatana Group rocks which have been folded into an elongate domal structure and, in part, rest unconformably on the diapiric core. Within the diapir several...-
Document
Published: 01 Jan 1971
-
Kapunda (part of the Adelaide Fold Belt Project). Annual and final reports to licence expiry/full surrender for the period 3/5/2007 to 2/5/2009.
Exploration for possible extensions of or structurally controlled analogues to the Kapunda copper deposit, in an area located just 1.5 km to the south of the historic mine, has examined part of a regional target fault structural corridor which...-
Document
Published: 14 Apr 1909
-
Data release [made at SA Director of Mines’ discretion] : Teetulpa Goldfield. Combined annual, annual and progress reports, plus related technical consultants' reports, submitted until licence renewal/re-issue, for the period 24/11/1995 to 14/11/2006.
An area surrounding and extending to the south of the Teetulpa Goldfield, which is centred about 60 km west of Olary and 31 km north of Yunta, was taken up primarily to try to find the source for the significant (>100,000 ounces so far recovered)...-
Document
Published: 05 Jun 1906
-
Yednalue. Annual reports to licence expiry/full surrender, for the period 13/2/2012 to 12/2/2016.
During licence Year 11 (2012-2013), David Miller rehabilitated his three drillsites that had been used in April 2011, delivered representative drill samples from his six holes to the DMITRE Drill Core Library, and further considered the logistics of...-
Document
Published: 10 Feb 1916
-
Data release - as updated [made at SA Director of Mines' discretion] : the Adelaide Hills Project. Joint annual reports for the period 16/5/2005 to 31/12/2013.
The Adelaide Hills Project consists of 3419 square km of land covered by eight contiguous exploration licences, ELs 3057, 3064, 3141, 3215, 3239, 3277, 3425 and 3534, which are owned by or joint ventured to Flinders Diamonds Limited (FDL). By an...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Bagot Well North, Tarnma, Bagot Well and Australia Plains (the Eudunda Group of tenements). Joint annual reports for the period 5/10/2009 to 4/8/2017.
As part of a renewed search for possible buried economic volcanogenic or epigenetic stratiform copper oxide or copper carbonate deposits, thought to be associated with poorly exposed fault structures and related hydrothermal alteration of Adelaidean...-
Document
Published: 19 Sep 1917