-
Mount Misery. Progress reports and final report to licence expiry/full surrender, for the period 30/11/1981 to 29/11/1985.
Stratabound, chemically precipitated Telfer - type replacement style vein gold was the target of exploration undertaken over an area 25 km north-west of Yunta, which contains good exposures of Neoproterozoic Umberatana Group clastic metasediments that...-
Document
-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Leighton. Annual and final reports to licence surrender for the period 19/11/2007 to 21/8/2009.
Basal Umberatana Group glacial tillitic sedimentary sequences and upper Burra Group interglacial arenaceous sediments were explored for possible economic stratabound gold mineralisation in an area located about 10-40 km north-west of Burra. In the...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-03, Marathon South mineral prospect. Project interim and final reports.
During exploration of Exploration Licence 3209 situated on the northern Stuart Shelf, gravity and magnetic modelling performed in early 2004 highlighted several anomaly source bodies, which immediately became of much interest as potential iron-oxide...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 30/7/2003 to 6/10/2009.
The subject EL 3112 ground represents the continuation of tenure by Gunson Resources, over the same area, from its former EL 2516 Yeltacowie (for which see the relevant licence reports previously released in Envs 9530 and 9715). This replacement...-
Document
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Oak Dam North-east, Lake Torrens, Glenside, Winjabbie and Trimmer Inlet; plus Shore Hill and Red Swamp (initially the UXA Stuart Shelf South JV Project; then OZ Minerals' Stuart Shelf Project). Joint annual reports for the period 1/11/2010 to 6/1/2017.
In continued exploration for possible economic buried Olympic Dam or Prominent Hill type IOCG style mineralisation that may exist within Proterozoic bedrock, joint venture operator Straits Resources undertook the following work on the project...-
Document
Published: 06 Mar 1918
-
Data release - as updated : World's End. Annual reports to licence expiry/full surrender, for the period 3/3/2009 to 2/3/2016.
An area centred about 30 km south-east of Burra has been explored for possible buried economic Burra style copper mineralisation and for Mongolata Goldfield type alluvial and reef gold. The host metasedimentary unit to the Monster mine, the...-
Document
Published: 16 Mar 1916
-
Data release - as updated : Mongolata. Annual reports plus final report to licence expiry/renewal, for the period 13/2/2004 to 12/2/2009.
An area centred ~15 km east-northeast of Burra has been explored for possible economic buried porphyry style copper-gold deposits, initially by grant licensee Bonanza Gold Pty Ltd during the first year of tenure, and thereafter for the next three...-
Document
-
Oakden Hills. Annual reports plus final report to licence expiry/full surrender, for the period 12/12/2018 to 11/12/2022.
A small area centred ~50 km south-east of Woomera, in hilly terrain just west of Pernatty Lagoon, was taken up to cover an EM conductor identified from a recently flown SA Government SkyTEM survey, which coincides with a weak regional magnetic...-
Document
Published: 15 Dec 1922
-
Mount Gunson and Mount Moseley (part of the Mount Gunson JV Project). Partial surrender reports, for the overall tenure period 15/7/1994 to 25/5/2021.
No exploration work has been undertaken on either of the recently relinquished portions of the two subject licences. Within the JV project tenements, exploration targets being addressed are: (1) possible economic buried IOCG (iron oxide-associated...-
Document
Published: 17 Oct 1918
-
Mount Fitton. Third partial surrender report, for the period 20/9/2010 to 19/9/2019.
The south-western portion of EL 5731 Mount Fitton has now been relinquished. It lies proximal to Adelaidean sedimentary cover to the Mount Painter Inlier basement rocks, which sediments were thought to have the potential to host SEDEX or MVT style...-
Document
Published: 18 Jun 1920
-
Woordlemmie (aka the Mount Gunson South Project). First partial surrender report, for the period 22/6/2011 to 21/6/2018.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings is being explored for possible buried economic base metal deposits that may exist in a variety of geological settings and...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Fitton. Annual reports for the period 20/9/2010 to 19/9/2018.
An area comprising two separate sub-blocks located in the northern Flinders Ranges, which adjoins outside the western outcrop edge of the Mount Painter Inlier, has been taken up to explore for possible buried primary, bedrock-hosted vein or breccia...-
Document
Published: 13 Nov 1918
-
South Gap. Annual reports and final report to licence expiry/full surrender, for the period 24/7/2017 to 23/7/2021.
A small area situated just north of the Beda Arm of Lake Torrens, and ~20 km north-northeast of the Carrapateena deposit, has been explored for possible buried high grade IOCG mineralisation that may be present in Proterozoic basement rocks. It was...-
Document
Published: 23 Aug 1921
-
Data release - as updated : Woordlemmie. Annual reports to licence full surrender, for the period 22/6/2011 to 22/11/2019.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings, covering ground adjacent to the south-western and southern margins of Pernatty Lagoon, has been explored for possible buried economic...-
Document
Published: 26 Nov 1919
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document