-
Mount Misery. Progress reports and final report to licence expiry/full surrender, for the period 30/11/1981 to 29/11/1985.
Stratabound, chemically precipitated Telfer - type replacement style vein gold was the target of exploration undertaken over an area 25 km north-west of Yunta, which contains good exposures of Neoproterozoic Umberatana Group clastic metasediments that...-
Document
-
Carrick Hill. Combined first annual / final report at licence surrender for the period 18/8/2008 to 17/8/2009.
An area located approximately 80 km north-east of Orroroo was assessed for its potential to contain alluvial and hard rock gold deposits. Quartz veins developed within a narrow zone in the Tarcowie Siltstone at the historic Erina prospect have high...-
Document
Published: 24 Oct 1909
-
Lobethal (part of the Adelaide Hills Project). Data release made upon the commencement of project licences' joint reporting] : annual reports for the period 29/9/1993 to 3/3/2003.
A large, 722 square km area of the central Adelaide Hills extending between Jupiter Creek and the Warren Conservation Park is being explored for diamonds, gold and base metals, in host geological structures that appeared to be associated with...-
Document
-
Teetulpa. Progress and final reports to licence surrender for the period 7/1/1983 to 1/4/1985.
Investigation of the quartz - (sulphide) gossan vein systems within Proterozoic metasedimentary bedrock at the alluvial Teetulpa Goldfield north of Yunta, for stratigraphic and structural clues to loci of primary gold mineralisation elsewhere in the...-
Document
-
Macclesfield (part of the Mount Barker Project). Annual reports and final report to licence expiry/full surrender, for the period 6/4/2016 to 5/6/2019.
An area surrounding the township of Macclesfield, and lying a short distance south-east of Terramin Limited's Bird-in-Hand historic gold mine redevelopment project, has been explored for inferred sediment-hosted primary gold mineralisation that may...-
Document
Published: 13 Jun 1919
-
Echunga (part of the Mount Barker Project). Annual reports, first partial surrender report and final report to licence full surrender, for the period 7/7/2016 to 5/6/2019.
An area surrounding the historic Echunga goldfield locality, and lying a short distance south-east of Terramin Limited's Bird-in-Hand historic gold mine redevelopment project, has been explored for inferred sediment-hosted primary gold mineralisation...-
Document
Published: 13 Jun 1919
-
Meadows (part of the Mount Barker Project). First annual report plus final report to licence expiry/full surrender, for the period 20/4/2017 to 19/4/2019.
A small area covering part of the Meadows Fault scarp and part of the adjoining Tertiary-Recent Meadows Basin has been explored for inferred sediment-hosted primary gold mineralisation that may have formed in favourable Neoproterozoic bedrock...-
Document
Published: 13 Jun 1919
-
Data release [made at SA Director of Mines’ discretion] : Teetulpa Goldfield. Combined annual, annual and progress reports, plus related technical consultants' reports, submitted until licence renewal/re-issue, for the period 24/11/1995 to 14/11/2006.
An area surrounding and extending to the south of the Teetulpa Goldfield, which is centred about 60 km west of Olary and 31 km north of Yunta, was taken up primarily to try to find the source for the significant (>100,000 ounces so far recovered)...-
Document
Published: 05 Jun 1906
-
Data release - as updated [made at SA Director of Mines' discretion] : the Adelaide Hills Project. Joint annual reports for the period 16/5/2005 to 31/12/2013.
The Adelaide Hills Project consists of 3419 square km of land covered by eight contiguous exploration licences, ELs 3057, 3064, 3141, 3215, 3239, 3277, 3425 and 3534, which are owned by or joint ventured to Flinders Diamonds Limited (FDL). By an...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-49, Bird-In-Hand Mine Deeps Project gold mineral prospects. Project final report.
At the historic Bird-In-Hand mining claim, where previous mine exploration drilling beneath the old workings by current licence operator Maximus Resources had delineated an inferred remaining gold resource of 53,000 ounces over the depth extent from...-
Document
-
Copperlinka. First partial surrender report, for the period 24/1/1983 to 23/1/1985.
The primary exploration target in an area located about 20 km south of Olary is the stratigraphic contact between the Late Proterozoic Tapley Hill Formation and the Tarcowie Siltstone, selected for its potential to host stratabound, Telfer - type...-
Document
-
Nackara. First partial surrender report, for the period 24/9/1984 to 22/8/1985.
Exploration was undertaken for Telfer - style stratabound gold at the contact between the Tapley Hill Formation and the Tarcowie Siltstone, and for placer type gold in glacial sequences such as the Appila Tillite and Wilyerpa Formation (94 stream...-
Document
-
Eukaby. Progress and final reports to licence expiry/full surrender for the period 26/1/1984 to 25/1/1986.
Exploration for possible large tonnage, low to medium grade, open pit mineable epigenetic vein gold deposits in the Baratta Mining Field district commenced by working within the three mining leases currently held over the principal historic mine...-
Document
Published: 05 Feb 1986
-
Waukaringa North, Waukaringa Creek and Euro Hill (the Waukaringa JV Project). Data release made at the joint first partial surrenders of the latter two licences: joint annual reports for the period 13/12/1993 to 12/6/1995.
Gold/copper exploration being undertaken north-west of Yunta has comprised rock chip geochemical sampling and BLEG stream sediment sampling. No significant gold anomalies were identified from the drainage bulk samples. High assay values of up to 8.8...-
Document