-
RB 79/00024 Adelaidean sedimentation. The Adelaide Geosyncline and Stuart Shelf.
In southern South Australia, the meridional Torrens Hinge Zone, at approximately longitude 138º, separates the cratonic Stuart Shelf with its undeformed, relatively thin sedimentary cover in the west, from the folded Adelaide Geosyncline to the east....-
Document
Published: 01 Jan 1979
-
AMIRA Project P544: Proterozoic sediment-hosted copper deposits. Quarterly progress reports and final report for the period July 2000 to October 2003.
The original objectives of this project were: 1) To understand the processes responsible for transporting, concentrating and fixing copper and other ore constituents during sedimentary basin evolution 2) To document the various stages and paragenesis...-
Document
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 30/7/2003 to 6/10/2009.
The subject EL 3112 ground represents the continuation of tenure by Gunson Resources, over the same area, from its former EL 2516 Yeltacowie (for which see the relevant licence reports previously released in Envs 9530 and 9715). This replacement...-
Document
-
Data release - as updated : Pound Creek. Annual reports and final report to licence full surrender, for the period 1/12/2010 to 16/11/2017.
South Australia Ludi Mining Pty Ltd (“SALM”) acquired Exploration Licence 4619 in the vicinity of Coward Springs to explore it for large Mesoproterozoic copper/gold/uranium deposits analogous to Olympic Dam, which is located approximately 120 km to...-
Document
Published: 21 Nov 1917
-
Lake Torrens South, Beda Arm and Carrapateena Arm (latterly the Lake Torrens Joint Venture Project). Annual reports (singular and combined) to licences' respective expiry/renewal, for the period 21/2/1996 to 7/1/2008.
Economic Olympic Dam style iron oxide - associated copper-gold (IOCG) mineralisation has been the target of exploration carried out in three adjoining areas which together extend for about 55 to 170 km north of Port Augusta, covering southern Lake...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2009 to 6/10/2013.
New work undertaken on EL 4187 during the 2009-2010 licence year has included: • Ongoing documentation and interpretation of MGD 55 & 56 • Drilling of MGD57 to 1243 m at Emmie Bluff prospect • Down hole EM and IP logging of MGD57 •...-
Document
-
Woocalla (part of the Mount Gunson Project). Fourth partial surrender report for the period 4/8/1995 to 29/10/2009.
As part of a project examining the sequence of Adelaidean cover rocks that surrounds the Pernatty Culmination on the southern Stuart Shelf for possible economic stratiform copper mineralisation of the various styles known to be present in the Mount...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-01 - South Australia Ludi Mining Pty Ltd, Coward Springs area gravity/magnetic anomaly IOCG targets. Drilling project interim report and final report.
South Australia Ludi Mining Pty Ltd (“SALM”) acquired Exploration Licence 4619 “Coward Springs” to explore for large Mesoproterozoic copper/gold/uranium deposits analogous to Olympic Dam, which is located approximately 120 km to the south. The licence...-
Document
-
RB 2007/00006 The geology and mineral potential of the PORT AUGUSTA [mapsheet] area, eastern Gawler Craton.
The PORT AUGUSTA 1:250,000 mapsheet area covers the north-eastern part of the Eyre Peninsula, the northern Spencer Gulf and the south-western Flinders Ranges, and extends from latitude 32°00'S to 33°00'S and longitude 136°30'S to 138°00'S. The main...-
Document
Published: 01 Apr 2007
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014
-
Port Pirie. Progress reports and final report to licence full surrender, for the period 21/8/1979 to 30/6/1982.
Continuing exploration for possible buried Mount Gunson and Olympic Dam type copper deposits, or other stratabound base metal occurrences within shelfal facies of Adelaidean sediments or in the pre-Adelaidean Wandearah Formation Carpentarian age...-
Document
-
Pernatty Lagoon [East]. First partial surrender report, for the period 27/6/1997 to 26/6/2001.
No work performed. Relinquished portions of the licence were considered to have low potential for economically viable Olympic Dam and Tunkillia style copper mineralisation, a conclusion based on the outcome of literature research, reconnaisance field...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-02, Carrapateena mineral prospect. Project final report.
PACE Initiative Year 2 funding, to assist with drilling two deep holes on the Carra-east anomaly located near Salt Creek, 8 km west of where the Carrapateena Arm southern shoreline meets central Lake Torrens, was granted to RMG Services in May 2005....-
Document
-
Bopeechee and Cadnia Hill/Stuart Creek and Porter Hill (The Lake Torrens Project). Data release made at two licences' surrender/two latter licences' fifth partial relinquishment: annual reports and final reports for the period 9/4/1998 to 31/12/2006.
The reports comprising this data release package describe exploration for economic deposits of base and precious metals that have possibly formed within Neoproterozoic metasediments, the underlying Palaeoproterozoic basement, and in Cambrian carbonate...-
Document
Published: 29 Sep 1909
-
Island Lagoon [South]. Progress reports to licence expiry/renewal for the period 2/4/1970 to 1/4/1971.
In a search for possible Mount Gunson - type copper mineralisation thought to have been formed within Adelaidean dolomitic metasediments in the southern Island Lagoon shore area, a field reconnaissance was carried out to look for postulated vectors to...-
Document
Published: 24 Mar 1971
-
Willouran Ranges. Progress reports to licence expiry for the period 1/6/1966 to 30/11/1966.
In a search for possible economic stratiform copper occurrences in Upper Proterozoic sediments of the Willouran Ranges, the licensee undertook photogeological and field mapping studies plus a regional geochemical survey of outcropping rocks and...-
Document