-
RB 88/00057 Torrens Hinge Zone Project - Bute region. Second and final report.
The Torrens Hinge Zone Project aimed to demonstrate the existence of prospective metalliferous rocks beneath the Cainozoic cover, to stimulate exploration and to investigate the transition between the Adelaidean sequences of the well-exposed Adelaide...-
Document
Published: 01 Aug 1988
-
Data release - as updated : Crystal Brook and Port Pirie (the Wandearah Project). Joint annual reports to licences' respective full surrenders, for the period 2/8/2008 to 26/4/2018.
Buried basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation of either Moonta-Wallaroo or Olympic Dam style is the target of ongoing exploration on the two adjacent subject tenements. In addition, the current holder considers that...-
Document
Published: 29 May 1918
-
The Hummocks. Annual reports and final report to licence full surrender, for the period 30/6/2009 to 17/8/2017.
EL 4278 was Southern Uranium's first mineral exploration foray into the northern Yorke Peninsula. The subject tenement was pegged in January 2009 in order to secure ground surrounding the northern reaches of the Pine Point Fault. This particular...-
Document
Published: 31 Aug 1917
-
Bute - Port Broughton area. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 7/6/1979 to 18/1/1991.
TARGET: Uranium and base metal deposits associated with Early to Middle Proterozoic basement geological structures and rock units in Spencer Gulf coastal areas east and south of Port Broughton. EXPLORATION: Aerial magnetic and radiometric surveys,...-
Document
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 1 of 2].
An area on the Stuart Shelf which is centred ~45 km north-northwest of Mount Gunson and 70 km south-east of Olympic Dam was taken up to explore primarily for possible economic buried Mesoproterozoic basement-hosted copper-gold deposits, perhaps of...-
Document
Published: 15 Nov 1913
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 2 of 2].
In March 2010, once the terms of the joint venture agreement had been finalised, Argo passed its complete data sets to Xstrata, who immediately commenced a re-logging of Argo's drill cores besides conducting comprehensive unconstrained 3-D modelling...-
Document
Published: 15 Nov 1913
-
RB 2007/00006 The geology and mineral potential of the PORT AUGUSTA [mapsheet] area, eastern Gawler Craton.
The PORT AUGUSTA 1:250,000 mapsheet area covers the north-eastern part of the Eyre Peninsula, the northern Spencer Gulf and the south-western Flinders Ranges, and extends from latitude 32°00'S to 33°00'S and longitude 136°30'S to 138°00'S. The main...-
Document
Published: 01 Apr 2007
-
Bute. Progress reports and final report to licence full surrender, for the period 16/1/1980 to 30/6/1982.
In the latter stages of its search for possible economic base and precious metal deposits in the Bute area, North Broken Hill targeted the concealed pre-Adelaidean basement rocks for Mount Gunson or ?Olympic Dam type hydrothermal ores, and for Mount...-
Document
-
Port Pirie district (part of the G2 [Lineament] Project). Annual reports plus final report to licence expiry/full surrender, for the period 29/3/1996 to 28/3/2000.
An airborne magnetic/radiometric survey to infill recent SAEI regional survey coverage was carried out within the G2 structural corridor, south-east of Port Pirie. Six bullseye magnetic highs, consistent with kimberlite emplacement, and one having...-
Document
Published: 20 Mar 1997
-
Bute. Annual reports and final report to licence full surrender, for the period 23/3/1993 to 11/12/1998.
Gold and base metal exploration conducted near the SA Lower North township of Bute, 140 km north-west of Adelaide, comprised the conduct of IP and ground magnetic surveys and RC drilling (4 holes, total 350 m). Two holes drilled on magnetic anomaly...-
Document
Published: 23 Mar 1999
-
Crystal Brook area (part of G2 [Lineament] Project). Annual and final reports for the period 29/3/1996 to 28/3/2000.
An aeromagnetic / radiometric survey was carried out within the G2 structural corridor, south-east of Port Pirie, as part of a search for possible Moonta, Olympic Dam or Ernest Henry type gold - copper mineralisation, and for any diamond-bearing...-
Document
-
Cultana basement regional geology 3D Model.
The Cultana basement 3D Geological Model covers a region which includes the Roopena, and western half of the Cultana, 1:100,000 mapsheet areas. The subsurface geology that has been modelled comprises a succession of deformed Palaeoproterozoic...-
Model
- PDF,
- ZIP
-
ExpNotes MAITLAND: Explanatory Notes MAITLAND, SI 53-12.
The MAITLAND Special 1:250,000 scale geological map covers the greater part of South Australia's Yorke Peninsula. The rocks in the map area comprise deformed Palaeoproterozoic and early Mesoproterozoic basement of the south-eastern Gawler Craton, and...-
Document
Published: 01 Jul 2006