-
Goolwa - Strathalbyn - Murray Bridge - Mannum area. Progress reports and final report to licence full surrender/re-issue as part of a larger tenement, for the period 13/11/1979 to 21/2/1985.
A multi-commodity mineral exploration programme carried out over an area between Mannum and Strathalbyn, seeking buried targets concealed in Tertiary sediments and basement rocks, comprised aerial magnetic, radiometric and EM surveys; groundwater,...-
Document
Published: 01 May 1985
-
RB 79/00131 Upper Murray groundwater investigations. Progress report no. 1 - 1979 drilling programme.
Between February and July 1979, six deep regional investigation holes and thirteen shallow local investigation holes were drilled in the Upper Murraylands area of South Australia. ATS values range from 7000 to 25,000 mg/1 within the Morgan/Mannum...-
Document
Published: 01 Jan 1980
-
RB 80/00042 Murray Basin hydrogeological investigation. Data assessment. Upper Murray and northern region.
The regional hydrogeology of a major portion (Counties Young, Hamley, part Albert and part Alfred) of the northern Murray Basin has been assessed to assist salinity control investigations. 5 main aquifer systems are defined. 2 are pre-Tertiary...-
Document
Published: 01 Jun 1980
-
RB 88/00056 Murray Basin hydrogeological investigation, drilling programme western margin (north). Progress report no. 6.
As part of a comprehensive investigation on the effect of groundwater on River Murray salinity, 23 investigation wells were drilled to depths of 44 to 229 metres. 8 wells were completed in the Murray Group unconfined aquifer with water table ranging...-
Document
Published: 01 Aug 1988
-
The Murray Basin Project. Joint progress reports and joint final report to remnant licences' full surrender, for the period 7/10/1980 to 6/12/1984.
Thirteen contiguous exploration licences located along the western margin of the Tertiary Murray Basin were taken up by CRA to search for economic buried brown coal / lignite deposits of the type already known from small discoveries that had been made...-
Document
Published: 07 Mar 1985
-
1981 and 1983 seismic surveys, Overland Corner OC81 and OC83, final reoprt.
AIM: The principal objective of the OC81 Seismic Survey and a calculated, normal moveout velocity-based seismic reflection time stratigraphic well tie to North Renmark 1 was to determine the areal extent of the prospective Permian (and Devonian?)...-
Document
-
Mannum area (including the Anna and Sedan coal deposits). Data release at licence expiry/renewal : coal exploration progress reports and data, plus Sedan coal deposit mine planning management progress reports, for the period 13/11/1978 to 20/8/1992.
TARGET: Possible Tertiary brown coal deposits near Sedan, in the western Murray Basin. EXPLORATION: Evaluation of data as obtained earlier by SADM/SADME drilling and more recently by subject licensees Thiess/CSR from rotary mud vertical open hole and...-
Document
-
RB 66/00047 Groundwater supplies at Keith and its surroundings. Progress report no. 6, micropalaeontological examination of bores, Hds Stirling and Laffer.
Foraminifera and stratigraphy of four water bores in the Hundred of Stirling and one bore in the Hundred of Laffer have been examined. The total thickness of the Cainozoic sequence to bedrock, proved in two bores, varies from 398 feet near Emu Flat, 4...-
Document
Published: 01 Jan 1968
-
SAMDE IS S11 - Groundwater in the Murray Mallee, February 1991
There is no abstract created for this record-
Document