-
Data release - as updated [made at SA Director of Mines' discretion] : North Mulga, Wooltana and Paralana areas (Frome Basin Project). Joint annual reports for the period 24/9/2012 to 31/12/2018.
The continuation of Heathgate's programme of exploration for economic buried Tertiary sediment-hosted uranium mineralisation within part of the north-western Frome Embayment during 2012-2013 has comprised exploratory drilling of 36 vertical rotary mud...-
Document
-
Curnamona (part of the Siccus JV Project). Annual reports and final report to licence surrender, for the period 4/8/1997 to 7/11/2001.
Sedimentary uranium orebodies within Tertiary palaeochannels were the target of exploration in the area of the Siccus River, south of Lake Frome. Extensive research into available open file past exploration data allowed the identification of both...-
Document
-
Beverley Uranium Project - Groundwater resources, management and monitoring.
The technical development and operational commencement stage of the Beverley in situ leach uranium mining project are herein discussed from the viewpoint of hydrogeological factors. The author summarises the uranium deposit's hydrogeological setting...-
Document
-
Lake Frome East. Progress and final reports to licence expiry for the period 13/11/79 to 12/5/80.
As part of a wider search over SA for possible continental salt lake occurrences of NaCO3-rich brines and of fossil crystalline trona beds, presumed to be equivalent to the Lake Magadi (Kenya) / Green River Basin (Utah - Wyoming) style Tertiary...-
Document
Published: 30 Apr 1980
-
Mount Yerila. First partial surrender report for the period 26/8/2002 to 25/8/2004.
Two peripheral areas of the subject licence have been relinquished owing to their perceived poor potential for containing economic palaeochannel uranium mineralisation within Tertiary sediments. Two rotary mud drillholes were drilled in the western...-
Document
-
Lake Frome [West]. First partial surrender report, for the period 18/10/2013 to 17/10/2016.
An area on the south-western edge of the Frome Embayment, that is centred ~100 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation...-
Document
Published: 02 Nov 2017
-
North Mulga. First partial relinquishment report for the period 25/8/2003 to 24/8/2004.
Drilling of fourteen exploration holes has been completed to date within the subject licence area, in a search for economic roll-front uranium occurrences within Tertiary sediments. Based on the current available data, the eastern portion of the...-
Document
Published: 02 Mar 2005
-
Wooltana. First partial relinquishment report for the period 19/9/2002 to 18/9/2004.
Two small peripheral areas of the subject licence have been relinquished owing to their perceived poor potential for containing economic palaeochannel uranium mineralisation within Tertiary sediments. The western area is seen as being almost devoid...-
Document
Published: 02 Mar 2005
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-13, Lake Frome area Holocene and Neogene calcrete - hosted uranium mineral prospects. Project interim and final reports.
Surficial sedimentary uranium deposits are estimated to comprise about 4% of world uranium resources. Calcrete deposits form approximately 5% of Australia's total uranium reserves and resources. Exploration for calcrete - hosted uranium of Neogene age...-
Document
Published: 11 Jun 2008
-
Data release [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports and technical reports to licence expiry/renewal, for the period 29/8/1992 to 28/9/2009.
In the reporting period to 30th June 1995 for Exploration Licence 1944, Heathgate Pty Ltd completed no fieldwork, however geological evaluation work was undertaken. This work consisted of laboratory testing of drill core from a 1991 drilling program...-
Document
Published: 18 Jun 2010
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 2015