-
Data release made at renewal of the Sturt Joint Venture Project ELs 4062 through 4090, in lieu of submitting a joint partial surrender report for them : joint annual reports, for the period 25/2/2008 to 24/2/2013.
A very large area of the remote far north-east of the State was taken up early in 2008 by the unlisted Thorne-Clarke family company, to explore for sediment-hosted secondary uranium mineralisation of the type found in intracratonic sedimentary basins...-
Document
-
Curnamona [Sedimentary Uranium Exploration] Project. Joint annual report for the calendar year 2012.
During 2012, Afmeco conducted a fourth exploratory drilling campaign spread over six of its eight Curnamona Project tenements, which was designed to test the extensions of the Erudina, Yarramba and Coolibah Palaeochannels, as well as probing in basin...-
Document
-
Mount Distance. Progress and final reports to licence expiry for the period 3/9/1970 to 2/9/1971.
In a search for possible roll-front type secondary uranium deposits emplaced in piedmont alluvial sediments over an area adjacent to the north-western edge of the Mount Painter Block, the licensees drilled 6 scout vertical rotary holes totalling 2151...-
Document
-
Warana Hill - Areas 1-3. Joint annual reports to licences' joint expiry/full surrender, for the period 30/6/2009 to 29/6/2011.
A conjoined multi-licence area located in the northern Strzelecki Desert, centred approximately 110 km north-northwest of Moomba, has been explored for possible economic buried Cenozoic heavy minerals sands (HMS) deposits, and also for shallow...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Callabonna / Petermorra (part of the Lake Elder Project). Annual reports for the period 19/3/1998 to 30/4/2015.
Exploration Licence 2494 was granted in March 1998 to Paladin Energy Minerals NL and Brightstar Power Corporation Pty Ltd - the Paladin Brightstar Joint Venture (PBJV), with Paladin Resources NL as manager. The target commodity being explored for by...-
Document
Published: 20 May 1915
-
PACE 2020 Initiative : PACE Targeting, Year 1 partnership no. 14 - Lake Blanche Project area, prospects A to F, airborne SkyTEM508 electromagnetic (AEM) geophysical survey. Project PT1-14 final report.
With the assistance of the SA Government's PACE 2020 Targeting Initiative, Cameco Australia has recently acquired an airborne electromagnetic (AEM) survey to look for possible buried sedimentary uranium mineralisation on the western edge of the...-
Document
-
Innamincka 3 area (part of the Sturt Joint Venture Project). Final report at licence expiry/full surrender, for the period 25/2/2008 to 24/2/2013.
A large area centred ~80 km north-east of Moomba has been explored for possible buried economic Tertiary to Recent sedimentary uranium mineralisation of roll front style, similar to what occurs as fluvial sandstone - hosted giant secondary deposits...-
Document
Published: 20 Jan 1914
-
Sturt Joint Venture Project. Final report at 14 (of 18) project licences' combined surrender, for the period 25/2/2008 to 31/12/2013.
A very large area of the remote far north-east of the State was taken up early in 2008 by the unlisted Thorne-Clarke family company, to explore for sediment-hosted secondary uranium mineralisation of the type found in intracratonic sedimentary basins...-
Document
Published: 30 Apr 1914
-
EL 4005 - EL 4011, Lake Blanche Project. Combined annual technical reports for the period 16/12/2007 to 16/12/2011.
The Lake Blanche Project lies on the western edge of the Eromanga Basin in South Australia to the north Frome Embayment. The Eromanga Basin of central Australia is a major oil-producing, sedimentary basin of Mesozoic age. Sediments in this basin...-
Document
-
RB 2012/00004 MARREE, South Australia, [geological map] sheet SH54-5. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The MARREE mapsheet area includes the south-western portion of the Strzelecki Desert plus parts of the Tirari Desert, north-western Flinders Ranges and north-eastern Willouran Ranges, between latitudes 29 to 30 degrees S and longitudes 138 to 139...-
Document
Published: 01 Apr 2012
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-48 - Lake Blanche area - Mesozoic to Cenozoic sedimentary uranium mineral prospects. Project final report.
Uranium Equities Ltd, with the assistance of PACE Initiative Year 5 drilling project partial subsidy funds, have completed a greenfields exploration drilling programme to look for possible buried sedimentary uranium mineralisation on the western edge...-
Document
Published: 24 Aug 1909
-
Lake Pundalpa and Lake Amerarkoo. Progress and final reports to licences' joint expiry/full surrender, for the period 7/9/1972 to 6/12/1973.
Exploration for possible buried roll-front or sandstone type sedimentary uranium deposits was carried out over a broad area lying northeast of Lake Frome by a South African - French joint venture. A large reconnaissance open hole rotary drilling and...-
Document
-
Lake Blanche. Progress and final reports for the period 18/6/1970 to 17/6/1972.
TARGET: Roll-front uranium deposits in buried Tertiary sediments. EXPLORATION: An airborne radiometric survey of 600 line miles, and reconnaissance groundwater sampling, followed by the drilling of 42 rotary holes (total 17,928 feet), 24 of which were...-
Document
-
ExpNotes MARREE: Explanatory Notes MARREE
A new generation, second edition MARREE 1:250 000 scale geological map and its explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's latest geological mapping program (1993 to...-
Document
-
Lake Tinko. Progress and final reports for the period 1/6/1973 to 31/5/1974.
A 50-hole rotary drilling program (total 3898 m) conducted near Lake Tinko and Billeroo Creek, south-east of Lake Frome, has partly delineated a north-south trending basement trough which, as a controlling influence on subsurface drainage, represents...-
Document
Published: 20 May 1974