Mount Gunson ore controls as a basis for further exploration.
This report presents the geological setting and postulated ore controls for the Mount Gunson style of mineralisation, with an expansion on the inferred metal concentration mechanism and its quantitative feasibility. Recommendations for two optimal...-
Document
Published: 17 Aug 1971
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Hydrogeological data, lithologs and sample assays for water bores drilled during the period January 1974 to March 1976 in the Mount Gunson area.
During the period from January 1974 to March 1976, 35 vertical rotary percussion water wells were drilled and many were cased off, perforated and then fitted with submersible electric pumps and offtake piping, to supply mine process water to the Mount...-
Document
-
Mount Gunson district. Geological mapping data, 1971-1972.
A mapping programme was undertaken by the licensees to test the possibility of the near-mine area to Mount Gunson being a suitable host environment for stratiform copper mineralisation. The exploration hypothesis used was that such mineralisation...-
Document
Published: 21 Apr 1972
-
Mount Gunson. Reports on trial seismic refraction surveys conducted in 1966 and 1972 to map possible ore-bearing horizons.
Reports describe the results of two attempts to use seismic refraction methods to map an unconformable subsurface interface between lithic sandstone and quartzite units within the Whyalla Sandstone. This palaeosurface is important as a locus for...-
Document
-
Mount Gunson copper deposit. Operator's reports about mine geology, mineralisation and ore genesis, for the period 1970-1983.
There is no abstract created for this record-
Document
Published: 25 Jul 1983
-
Cattlegrid. Progress report, 1976.
Summary of geological knowledge to date, including mineralogy, paragenesis and ore handling problems.-
Document
-
Report on diamond drilling, February-March 1975, Gully area, Mount Gunson.
16 diamond drill holes tested the distribution and grade of copper mineralization occuring in the Woocalla shales. Drilling results suggest that no economically viable copper deposit exists in the Gully due to the low grade, high overburden and...-
Document
Published: 01 Jan 1976
-
Uro Bluff. Progress reports to licence expiry/renewal, for the period 16/4/1975 to 15/4/1977.
Stratiform copper sulphides, hosted within the basal Tapley Hill Formation, and extensions of known kimberlite bodies were targeted in this program. Reconnaissance and closer (down to 1 km x 1 km) spaced diamond and percussion drilling (28 and 83...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
Lake Dutton. Progress reports to licence expiry/renewal, for the period 1/10/1968 to 30/9/1970.
Possible economic stratiform base metal mineralisation formed within the Woocalla Dolomite Formation, which is shallowly buried over a wide area south-east of Lake Dutton, was targeted by ongoing work in an area located west and south-west of Pernatty...-
Document
-
Price. Progress and final reports to licence surrender, for the period 27/4/1977 to 6/12/1978.
Continuation by Aquitaine of its regional appraisal of the mineral potential in the Cambrian carbonate sequence on northern Yorke Peninsula, has recently involved them in acquiring and interpreting ground gravity and magnetic surveys, completing a...-
Document
-
Pernatty Lagoon. Progress reports to licence expiry/full surrender, for the period 16/6/1969 to 15/9/1970.
There is no abstract created for this record-
Document
-
Lake Macfarlane - Lake Finniss area. Progress reports to licence expiry/full surrender, for the period 1/7/1967 to 31/12/1967.
Consultants were engaged by the licensee to conduct an extensive geological and geochemical investigation of a 2700 square mile area surrounding the Mount Gunson copper deposit, and to perform an interpretation of available regional aeromagnetic data....-
Document