-
Mount Gunson ore controls as a basis for further exploration.
This report presents the geological setting and postulated ore controls for the Mount Gunson style of mineralisation, with an expansion on the inferred metal concentration mechanism and its quantitative feasibility. Recommendations for two optimal...-
Document
Published: 17 Aug 1971
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 30/7/2003 to 6/10/2009.
The subject EL 3112 ground represents the continuation of tenure by Gunson Resources, over the same area, from its former EL 2516 Yeltacowie (for which see the relevant licence reports previously released in Envs 9530 and 9715). This replacement...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Hydrogeological data, lithologs and sample assays for water bores drilled during the period January 1974 to March 1976 in the Mount Gunson area.
During the period from January 1974 to March 1976, 35 vertical rotary percussion water wells were drilled and many were cased off, perforated and then fitted with submersible electric pumps and offtake piping, to supply mine process water to the Mount...-
Document
-
Mount Gunson. Reports on trial seismic refraction surveys conducted in 1966 and 1972 to map possible ore-bearing horizons.
Reports describe the results of two attempts to use seismic refraction methods to map an unconformable subsurface interface between lithic sandstone and quartzite units within the Whyalla Sandstone. This palaeosurface is important as a locus for...-
Document
-
Mount Gunson copper deposit. Operator's reports about mine geology, mineralisation and ore genesis, for the period 1970-1983.
There is no abstract created for this record-
Document
Published: 25 Jul 1983
-
Pernatty Lagoon - Woocalla - Mount Gunson area. Progress reports and annual reports to licence expiry/full surrender, for the period 1/8/1963 to 25/8/1966.
TARGET: The area of abandoned shallow historic workings for secondary copper and manganese ore aligned along a sandstone - dolomitic limestone contact on the western edge of Pernatty Lagoon. EXPLORATION: A field inspection of the above workings,...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2009 to 6/10/2013.
New work undertaken on EL 4187 during the 2009-2010 licence year has included: • Ongoing documentation and interpretation of MGD 55 & 56 • Drilling of MGD57 to 1243 m at Emmie Bluff prospect • Down hole EM and IP logging of MGD57 •...-
Document
-
Cattlegrid. Progress report, 1976.
Summary of geological knowledge to date, including mineralogy, paragenesis and ore handling problems.-
Document
-
Report on diamond drilling, February-March 1975, Gully area, Mount Gunson.
16 diamond drill holes tested the distribution and grade of copper mineralization occuring in the Woocalla shales. Drilling results suggest that no economically viable copper deposit exists in the Gully due to the low grade, high overburden and...-
Document
Published: 01 Jan 1976
-
Petrology of samples from Charlinga, Pandurra and Mount Gunson DDHs LD24, LD25, J-12, MG11 - MG14 and WOB-12.
Samples studied for stratigraphic identification.-
Document
Published: 01 Jan 1979
-
Report on geophysical surveys, MG14 area, Mount Gunson.
Follow up of an orientation INPUT survey anomaly with ground magnetic and IP surveys focussed attention on the MG14 area. This report describes the geophysical results and subsequent drill testing (DDH LY3), and their interpretation.-
Document
-
Pernatty Lagoon. Progress reports and final report to licence expiry/renewal, for the period 20/7/1975 to 19/7/1977.
As part of continuing brownfields exploration for extensions to known stratiform base metal mineralisation in the area lying to the west of Pernatty Lagoon, much stratigraphic drilling (210 rotary percussion holes totalling 12,441 m, including 1167 m...-
Document
-
Pernatty Lagoon. Progress reports and final report to licence expiry/renewal, for the period 20/7/1973 to 19/7/1975.
Ongoing appraisal work conducted by CSR at the company's newly discovered Cattlegrid copper deposit that lies at the top of the Pandurra Formation has included infill rotary percussion and diamond drilling (13 holes for 554 m, including 166 m cored),...-
Document
-
Uro Bluff. Progress reports to licence expiry/renewal, for the period 16/4/1975 to 15/4/1977.
Stratiform copper sulphides, hosted within the basal Tapley Hill Formation, and extensions of known kimberlite bodies were targeted in this program. Reconnaissance and closer (down to 1 km x 1 km) spaced diamond and percussion drilling (28 and 83...-
Document
-
RB 72/00189 Base metal mineralization in the Pernatty Lagoon region, South Australia.
Concentrations of copper occur in sandstone (Whyalla Sandstone Member) and dolomite (Woocalla Dolomite) which rest disconformably on an undulating surface of quartzite (Pandurra Formation) in the Mount Gunson area. Several attempts have been made to...-
Document
Published: 04 Oct 1972
-
Pandurra. First partial surrender report, for the period 23/3/1973 to 6/4/1976.
Surface geological mapping and open hole rotary drilling of 21 stratigraphic holes totalling 8717 m were carried out within the relinquished ground portion, which from reviewing the results is regarded as having low potential for copper and other base...-
Document
-
Lake Dutton. Progress reports to licence expiry/renewal, for the period 1/10/1968 to 30/9/1970.
Possible economic stratiform base metal mineralisation formed within the Woocalla Dolomite Formation, which is shallowly buried over a wide area south-east of Lake Dutton, was targeted by ongoing work in an area located west and south-west of Pernatty...-
Document
-
Price. Progress and final reports to licence surrender, for the period 27/4/1977 to 6/12/1978.
Continuation by Aquitaine of its regional appraisal of the mineral potential in the Cambrian carbonate sequence on northern Yorke Peninsula, has recently involved them in acquiring and interpreting ground gravity and magnetic surveys, completing a...-
Document