-
EL 272 Hamilton Creek. A regional assessment of the base metal potential of the Parabarana (to) Gunsight trend, and Callanna Beds (through) Yudnamutana sequence, northern Mount Painter Province, South Australia.
Aquitaine Australia Minerals Pty Ltd (Aquitaine) entered into a joint venture with North Flinders Mines on 21 August 1975, over an area defined by Exploration Licence 272 (ex EL 153). The area included two main prospective zones for copper deposits:...-
Document
-
Report on the Shamrock uranium prospect.
Uranium mineralisation was first discovered at the old Shamrock Copper Mine during a systematic search of old mine dumps by the South Australian Department of Mines in 1955. Follow-up investigations located a small high-grade uranium lode (Valley...-
Document
-
Moolawatana. Progress reports for the period 18/5/1972 to 17/5/1973.
There is no abstract created for this record-
Document
-
Data release [made at SA Director of Mines’ discretion] : Arkaroola (part of the Frome Basin Project). Annual reports for the period 3/6/1996 to 4/12/2008. [ Index Part 1 of 2 ].
A 1243 square km rugged mountainous area in the far northern Flinders Ranges extending between Arkaroola, Moolawatana, Prospect Hill, Mount Livingston and Mount Saturday was taken up to explore primarily for gold that it was hoped could exist in...-
Document
-
RB 76/00027 Explanatory Notes for the FROME 1:250 000 geological map.
There is no abstract created for this record-
Document
Published: 01 Mar 1976
-
Mount Pitt (the Mawson Project). Annual reports and final report to licence expiry/full surrender, for the period 18/1/2006 to 18/10/2013.
A small, two-part licence area, located 15 km west-northwest of Arkaroola Village and ~10 km west-southwest of the Mount Gee uranium occurrence, adjacent to the northern end of the Gammon Ranges National Park, has been explored for possible economic...-
Document
Published: 27 Nov 1913
-
Moolawatana. Progress and technical reports for the period 18/5/1972 to 17/5/1974.
There is no abstract created for this record-
Document
-
Moolawatana. Quarterly and final reports for the period 26/8/75 to 25/8/76.
Ongoing copper/uranium exploration of basement and Willouran cover southwest of Moolawatana comprised ground magnetic, IP, EM and TEM surveys, airborne EM (Turair) and magnetic surveys, prospect-scale geochemical surveys and limited diamond drilling...-
Document
Published: 01 Nov 1977
-
Yudnamutana Hill. Progress reports and annual reports to licence expiry/full surrender, for the period 20/5/1980 to 15/2/1995.
Base metal and gold exploration undertaken over a lengthy period since 1980 in the Yudnamutana Hill area, 20 km north-west of Arkaroola, has comprised detailed geological mapping of major basement and cover stratigraphic units and known mineral...-
Document
-
Mount Painter area (Yudnamutana Mining Field and Shamrock Valley). Progress and final relinquishment reports for the period 1/10/1968 to 31/3/1970.
Kennecott took up 3 SMLs in the Mount Painter district during 1968 to evaluate known copper-uranium occurrences and to search for new occurrences. At the same time, they secured the ground surrounding four 40-acre Mineral Claims already in their...-
Document
-
Paralana. Progress and final reports to licence surrender for the period 16/5/1966 to 15/12/1966.
Regional stream sediment sampling conducted over an area of historically prospective ?Archaean, Proterozoic and Palaeozoic rocks in the Mount Painter - Mount Babbage - Mount Livingstone - Yudnamutana area did not reveal any base or precious metal...-
Document