-
Bundulla. Progress reports for the period 24/5/79 to 19/10/82.
Airborne and ground magnetic surveys were conducted in the Bundulla area of the Nullarbor Plain (SA), prior to drilling a prominent circular aeromagnetic feature. 2 percussion/rotary mud holes, each drilled to TD 369.5 m, penetrated crystalline...-
Document
-
North Fowlers Bay - Chundaria. Annual reports and progress reports for the periods 15/9/1993 to 14/9/1998, and 28/10/1998 to 12/3/1999.
North Ltd's Barton Project commenced in 1990 across a number of licences progressively taken out over the western Gawler Craton, which eventually came to include EL 1865. Initial exploration for heavy mineral sand in the Barton-Ooldea area, 100-200...-
Document
Published: 06 May 1999
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Western Gawler Project. Final report, Magneto Telluric, Passive Seismic and Magnetic Modelling Study. Project ADI RD02-296 [Accelerated Discovery Initiative Round 2, 2022].
This report summarises geophysical studies conducted by Western Areas between October 2021 and October 2022, under the ADI Agreement ADI: RD02/296-GP Magneto Telluric (MT), Passive Seismic and Magnetic Modelling Study. The discovery of magmatic Ni-Cu...-
Document
Published: 06 May 1923
-
Fig Tree Corner, Ooldea South, Barton, Colona North, Ooldea Range and Pidinga (the Eucla Basin HMS Project tenement Group One). Joint annual reports for the period 1/3/2011 to 31/12/2015.
During the 2011-2012 joint reporting year, Iluka undertook drilling on ELs 3638, 3742 and 4544 with three aims: to extend the Typhoon HM deposit resource, to follow-up results of brownfields drilling at the Sonoran prospect, and to do further infill...-
Document
Published: 28 Feb 1916
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports for the period 17/2/2010 to 20/6/2015.
During the sixth licence year, in February 2011, new licence owner Marmota Energy Limited ('Marmota') undertook a reconnaissance biogeochemical survey at the Pundinya prospect, collecting 54 x 30 g grab samples of vegetation of Mulga trees, in the...-
Document
Published: 06 Oct 1915
-
SADME / Amdel Project 1/1/232 : Officer Basin [South Australian portion] stratigraphic drilling project - petrographic sampling and analyses. Progress reports 3, 5 and 7 re. Wilkinson 1 drillhole.
32 rock samples, of unknown age, taken from the carbonate sequence intersected above the salt diapir section in SADME Wilkinson 1 stratigraphic drillhole, were examined petrographically to determine their possible depositional environment. Another 21...-
Document
Published: 24 May 1979
-
Barton West and Barton East (initially part of the Gawler Joint Venture Project). Data release made in lieu of submitting a third partial surrender report for the latter licence : joint annual reports for the period 14/3/2001 to 11/1/2011.
The trigger event causing this data release to be made is that three portions of licence ground that together cover ~289 square km or 19.5% of the former area of EL 4217 Barton East have now been relinquished, as of 11/1/2011. No corresponding partial...-
Document
Published: 09 Mar 1911
-
Wildingi Claypan (part of the Central Gawler Project). Annual reports to licence expiry/full surrender, for the period 5/10/2005 to 13/1/2015.
Two separate small areas located just north of Comet Outstation, that were originally taken up to explore for possible diamonds and Triassic-Jurassic kimberlite intrusions that could be associated with intensely faulted shallow basement, have also...-
Document
Published: 19 Dec 1914
-
Data release - as updated : Phar Lap Outstation. Annual reports plus final report to licence expiry/full surrender, for the period 27/8/2007 to 26/8/2017.
An area centred ~85 km south-southeast of Coober Pedy, at the southern margin of the Lake Phillipson Trough, a long active tectonic feature now occupied by deep sedimentary fill, was taken up by a wholly-owned subsidiary to Monax Mining Ltd primarily...-
Document
Published: 24 May 1917
-
Data release [made at SA Director of Mines’ discretion] : Carnding. Annual reports to licence expiry/renewal, for the period 5/7/2005 to 4/7/2009.
EL 3369 is located in the central Gawler Craton, and is centred approximately 35 km west and west-northwest of Tarcoola. The licence area consists of two geographically separate [by ~5 km] blocks – exploration activity in the eastern block has...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Ceduna. Licence-specific annual reports submitted until the commencement of project joint reporting, for the period 28/11/2001 to 18/4/2008.
EL 2870 Ceduna covers 1390 square km located adjacent to the coast near Ceduna on north-western Eyre Peninsula. Minotaur believed that the area, which lies relatively close to the continental Fowler Suture Zone, was prospective for Proterozoic...-
Document
Published: 12 Jun 1908
-
Data release [made at SA Director of Mines’ discretion] : Kottata Well, Eldale, Tootla and Broadacres (also part of the Yaninee Project). First annual report for EL 3135, plus subsequent joint annual reports, for the period 29/9/2003 to 5/6/2009.
An area located on central western Eyre Peninsula between Minnipa and Port Kenny was taken up to explore the Precambrian basement rocks, which are poorly exposed there, for possible economic buried iron oxide - associated copper-gold (IOCG) deposits....-
Document
-
Data release - as updated : Muckanippie. Annual reports to licence expiry/full surrender, for the period 20/10/2005 to 23/2/2019.
EL 3438 Muckanippie is located in the northern Gawler Craton, on the western margin of the Gawler Range Volcanics Domain, and is centred approximately 60 km north-west of Tarcoola. Basement outcrop on the licence area is sparse, with a thin cover of...-
Document
Published: 25 Feb 1919
-
Trial Well. Progress and final reports to licence surrender for the period 15/6/79 to 4/1/82.
TARGET: An assessment of the potential for uranium and lignite deposits within the Eocene Pidinga Formation, and separate investigations of coincident, possible Olympic Dam target type magnetic and gravity anomalies in the crystalline Precambrian...-
Document