Bundulla. Progress reports for the period 24/5/79 to 19/10/82.
Airborne and ground magnetic surveys were conducted in the Bundulla area of the Nullarbor Plain (SA), prior to drilling a prominent circular aeromagnetic feature. 2 percussion/rotary mud holes, each drilled to TD 369.5 m, penetrated crystalline...-
Document
-
RB 96/00016 Review of mineral exploration - CHILDARA region.
Mineral exploration on CHILDARA 1:250 000 geological map sheet was reviewed from SADME open file Envelopes, to complement an overview of regional prospectivity supported via the recent acquisition of high quality aeromagnetic data and a compilation by...-
Document
Published: 01 May 1996
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Chimpering Rock Hole, Yarrana Hill, Moornaba Rock Hole, Euria Well, Koonibba Mission, Lake Tallacootra, Dunn Hill, Wallala Hill, Mount Centre and Nalara. Quarterly and annual progress reports plus technical reports, for the period 25/7/1989 to 24/7/1992.
Hitherto untried exploration for heavy mineral sands on the eastern margin of the Eucla Basin, conducted by the Ceduna Joint Venture partners since 1989 over ten contiguous licence areas in the Ooldea - Barton area centred 150 km north-west of Ceduna,...-
Document
-
Petina, Puntabie and Maltee (Ceduna - Streaky Bay district). Joint first partial relinquishment report, for the period 13/2/2004 to 11/11/2004.
The seaward portion of the subject licences, comprising 52% of the combined original area granted, has been relinquished after a reconnaissance RC aircore drilling programme which targeted economic heavy mineral sands within Cainozoic marine placer...-
Document
Published: 10 Dec 1904
-
Waddikee Rocks and Corrobinnie (part of the Eyre Peninsula Project). Joint second and sixth respectively partial surrenders report, for the overall period 17/10/1996 to 11/7/2016.
The stated exploration strategy for the Joint Venture's Eyre Peninsula Project tenements (that are still extant) is to explore predominantly for gold and copper, with uranium as a secondary focus. Regional programmes of calcrete geochemical sampling,...-
Document
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
Data release [made at SA Director of Mines' discretion] : North-western Eyre Peninsula (eastern Eucla Basin) heavy mineral sands exploration tenement group [Group 3]. Joint annual reports for the period 1/7/2004 to 31/5/2010. [Index part 2 of 2].
Within the subject south-eastern Eucla Basin tenements, Iluka's ongoing exploration has targeted the Tertiary-aged beach sands deposited during the five marine incursions that occurred from the Middle Eocene to the Pliocene, with a focus on exploring...-
Document
Published: 01 Sep 1910
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Data release [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports to licence expiry/renewal, for the period 17/2/2005 to 16/2/2010.
Tasman Resources is exploring an area that is centred about 78 km north-west of Tarcoola for possible economic buried occurrences of sedimentary roll front style uranium in Tertiary palaeochannels and nickel mineralisation in Archaean -...-
Document
Published: 19 Apr 1910
-
Wynbring. Second partial surrender report at licence expiry/renewal, for the period 23/5/2014 to 22/5/2019.
488 square km of EL 5417, located ~95 km north-west of Ceduna within the Yellabinna Regional Reserve, and extending for between 5 km and 29 km towards the south-southwest from Mount Christie Siding on the Trans Australia Railway, have been...-
Document
Published: 12 Apr 1919
-
Commonwealth Hill. Annual reports to licence expiry/non-renewal, for the period 9/8/2012 to 8/8/2017.
An area centred ~20 km north of the Challenger gold mine has been explored for possible buried primary Challenger type basement gold lodes and also for secondary roll-front style uranium mineralisation that may be hosted in buried Tertiary fluvial...-
Document
Published: 14 Nov 1915
-
Sahara Prospect. Final report, Model Test and Core Scanning. Project ADI RD02-270 [Accelerated Discovery Initiative Round 2, 2022].
This report summarises exploration conducted by Western Areas between May 2021 and October 2021, under the ADI Agreement ADI: RD02/270-ED Sahara Prospect Model Test and Core Scanning. The discovery of magmatic Ni-Cu sulphide at Sahara in 2020,...-
Document
Published: 31 Oct 1922
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Fowlers Bay (part of the Western Gawler JV Project). Annual report for the period 9/3/2015 to 8/3/2018.
During the 2015-2016 licence year, the Western Gawler JV Project exploration operator Western Areas Limited (WSA) conducted the first part of a regional reconnaissance bedrock drilling campaign targeting aeromagnetic anomalies which were interpreted...-
Document
-
Midgerie, Barton South, Immarna, Barton Siding, Mount Christie Siding, Lake Bring, Mulgathing, Wynbring (TARCOOLA and BARTON 1:250k mapsheets region). Joint progress reports and final reports, for the period 11/4/1981 to October 1990.
Stockdale's exploration for diamonds in the Barton region, at the start of the licence period, commenced with the evaluation of 136 potential kimberlite targets generated by the detailed in-house interpretation of data acquired from an extensive new...-
Document
-
Bull 037 Geology and Mineral Resources of Southern Eyre Peninsula
A regional geological survey covered 15 standard 1-mile map sheets. Detailed mapping established a 50 000 ft sequence of Archaean sedimentation of gneissose, schistose and granitoid rocks, migmatite, quartzite, dolomite and haematitic quartzite. These...-
Document
-
Reid Lookout (part of the Parkinson Dam Project). First annual report plus final report to licence full surrender, for the period 15/11/2005 to 31/12/2010.
An area located approximately 70 km west of Port Augusta has been explored for possible economic epithermal gold-silver (lead-zinc) mineralisation, similar to that which had earlier been located in outcrop within Proterozoic Corunna Conglomerate on...-
Document
Published: 06 Jan 1911
-
Barton West and Barton East (initially part of the Gawler Joint Venture Project). Data release made in lieu of submitting a third partial surrender report for the latter licence : joint annual reports for the period 14/3/2001 to 11/1/2011.
The trigger event causing this data release to be made is that three portions of licence ground that together cover ~289 square km or 19.5% of the former area of EL 4217 Barton East have now been relinquished, as of 11/1/2011. No corresponding partial...-
Document
Published: 09 Mar 1911