Skip to content
Search Home
SARIG catalogue
  • HomeHome
  • Search Records
  • FAQs
  • Vocabularies
  • SARIG map SARIG map
  1. Datasets

Datasets

The mesac Open Data Portal datasets contain detailed records of seismic surveys and geochemical data, and they are made available here to industry, researchers and the public.
FILTER RESULTS
RESET
draw to search by area BY DRAWN AREA
RESET
Location SA

TYPE OF RECORD

  • document - (149)
  • model - (2)

TOPIC

  • Geoscientific Information - (151)

CATEGORY TYPE

  • Earth Sciences - (151)
    • Geophysics - (151)
      • Electrical And Electromagnetic Methods In Geophysics - (151)
      • Magnetics - (137)
      • Gravity - (63)
      • Petrophysics - (61)
      • Radiometrics - (57)
      • Seismology And Seismic Exploration - (11)
        • Passive Seismic - (1)
    • Geology - (150)
      • Mineral System Geology - (137)
      • Petrology - (137)
        • Igneous And Metamorphic Petrology - (91)
        • Sedimentary Petrology - (5)
      • Resource Geology - (135)
        • Mineral Resource Geology - (137)
        • Quarry And Extractive Resource Geology - (36)
        • Geothermal Resource Geology - (2)
      • Stratigraphy - (133)
      • Regional Geology - (130)
      • Basement Geology - (105)
      • Mineralogy And Crystallography - (101)
      • Historical Geology - (88)
      • Sedimentology - (82)
      • Surface Geology - (72)
      • Volcanology - (41)
      • Geochronology - (22)
      • Basin Analysis - (17)
      • Marine Geoscience - (17)
      • Paleontology - (5)
        • Palynology - (2)
    • Geochemistry - (148)
      • Exploration Geochemistry - (143)
      • Isotope Geochemistry - (16)
      • Hydrogeochemistry - (5)
      • Biogeochemistry - (2)
      • Organic Geochemistry - (1)
    • Physical Geography - (101)
      • Geomorphology And Regolith And Landscape Evolution - (56)
      • Surfacewater Hydrology - (32)
      • Hydrogeology - (29)
      • Quaternary Environments - (23)
      • Surface Processes - (16)
      • Paleoclimatology - (3)
      • Glaciology - (2)
    • Atmospheric Sciences - (1)
  • Engineering - (144)
    • Geomatic Engineering - (141)
      • Geospatial Information Systems - (14)
      • Remote Sensing - (8)
      • Photogrammetry And Remote Sensing - (7)
      • Cartography - (5)
    • Resources Engineering - (122)
      • Drilling Engineering - (124)
      • Mineral Processing/Beneficiation - (19)
      • Mining Engineering - (12)
      • Geomechanics And Resources Geotechnical Engineering - (3)
      • Petroleum And Reservoir Engineering - (2)
      • Electrometallurgy - (1)
      • Hydrometallurgy - (1)
    • Civil Engineering - (12)
    • Chemical Engineering - (3)
    • Environemental Engineering - (1)
  • Policy And Administration - (135)
  • Mineral Resources (Excl. Energy Resources) - (108)
    • Mineral Exploration - (149)
    • Primary Mining And Extraction Of Mineral Resources - (43)
    • First Stage Treatment Of Ores And Minerals - (1)
  • Information And Computing Sciences - (86)
    • Artificial Intelligence And Image Processing - (33)
      • Image Processing - (31)
      • Simulation And Modelling - (5)
      • Computer Graphics - (4)
      • Expert Systems - (4)
    • Computation Theory And Mathematics - (5)
  • Environmental Sciences - (85)
    • Environmental Science And Management - (67)
      • Environmental Management - (23)
      • Natural Resource Management - (7)
      • Environmental Monitoring - (5)
      • Environmental Impact Assessment - (1)
    • Soil Science - (60)
      • Soil Chemistry - (46)
  • Energy - (64)
    • Energy Exploration - (61)
    • Environmentally Sustainable Mineral Resource Activities - (6)
    • Preparation And Production Of Energy Sources - (4)
    • Mining And Extraction Of Energy Resources - (2)
    • Renewable Energy - (1)
  • Biological Sciences - (6)
    • Ecology - (8)
  • Built Environment And Design - (6)
    • Urban And Regional Planning - (6)
  • Cultural Understanding - (5)
  • History And Archaeology - (5)
    • Conserving Aboriginal And Torres Strait Islander Heritage - (5)
    • Archaeology - (3)

DOCUMENT TYPE

  • Mineral Company Report - (129)
    • Mineral Exploration - (129)
  • Departmental Publication - (15)
    • Geological Survey Geoscience Publication - (15)
  • Exploration Initiative - (2)
    • Collaborative Drilling - (1)
  • Geophysical Report - (2)
    • Final - (2)
  • External Publication - (1)
    • Laboratory Analyses - (1)

COMMODITY

  • industrial material - (151)
  • Critical minerals - (66)
  • copper - (54)
  • gold - (46)
  • uranium - (39)
  • precious metal - (34)
  • iron - (29)
  • iron ore - (29)
  • granite - (26)
  • graphite - (23)
  • zircon - (19)
  • magnetite - (18)
  • Heavy mineral sands - (17)
  • nickel - (15)
  • diamond - (12)
  • dimension stone - (12)
  • rare earth element - (12)
  • gemstone - (11)
  • base metal - (7)
  • kaolin - (7)

GEOLOGICAL PROVINCE

  • Gawler Craton - (151)
  • Cleve Subdomain - (34)
  • Eucla Basin - (21)
  • Stuart Shelf - (16)
  • Olympic Domain - (13)
  • Christie Subdomain - (9)
  • Coulta Subdomain - (9)
  • Cariewerloo Basin - (7)
  • Eromanga Basin - (6)
  • Gawler Range Volcanic Province - (6)
  • Mount Woods Inlier - (6)
  • Nuyts Subdomain - (6)
  • Adelaide Geosyncline - (5)
  • Coober Pedy Ridge - (5)
  • Mabel Creek Ridge - (5)
  • Peake And Denison Inliers - (5)
  • Torrens Hinge Zone - (5)
  • Arckaringa Basin - (4)
  • Lake Eyre Basin - (4)
  • Nawa Subdomain - (4)

STRATIGRAPHY

  • Hutchison Group - (39)
  • Gawler Range Volcanics - (32)
  • Hiltaba Suite - (21)
  • Middleback Subgroup - (18)
  • Pandurra Formation - (16)
  • Lincoln Complex - (12)
  • Gairdner Dolerite - (10)
  • Lower Middleback Jaspilite - (10)
  • Pidinga Formation - (10)
  • Katunga Dolomite - (9)
  • Ooldea Sand - (9)
  • Cook Gap Schist - (8)
  • Donington Suite - (8)
  • Blue Range Beds - (7)
  • Christie Gneiss - (7)
  • Mulgathing Complex - (7)
  • Sleaford Complex - (7)
  • Corunna Conglomerate - (6)
  • Tapley Hill Formation - (6)
  • Warrow Quartzite - (6)

FORMAT

  • PDF - (143)
  • PNG - (5)
  • ZIP - (2)

UPDATE FREQUENCY

There are no UPDATE FREQUENCY that match this search

PUBLICATION DATE

Specific date: 1980, 20/04/1980, 04/1980

Date range: 1980-2022, 04/1980-08/1990

close
Search records
ADVANCED KEYWORD SEARCH
Include the following keywords:

151 records found

Category type: Electrical And Electromagnetic Methods In Geophysics Commodity: Industrial material Geological province: Gawler Craton

Filter Results
  • Mount Mitchell. Progress reports and final report to licence full surrender, for the period 20/10/1980 to 19/10/1982.

    Exploration was undertaken for lode and alluvial tin mineralisation which might exist within ground adjacent to the abandoned Mount Mitchell tin mine, and also for reef gold in altered granite and dolerites outcropping adjacent to the numerous small...
      Document
    • PDF
  • Lake Hart. Progress reports to licence expiry/full surrender, for the period 5/9/1980 to 4/9/1982.

    Airborne magnetic/radiometric surveys and follow-up gravity surveys carried out in a search for possible Olympic Dam type orebodies have indicated depths to magnetic basement in excess of 1000 m in the Lake Hart area of the Stuart Shelf. The...
      Document Published: 06 Oct 1982
    • PDF
  • Bundulla. Progress reports for the period 24/5/79 to 19/10/82.

    Airborne and ground magnetic surveys were conducted in the Bundulla area of the Nullarbor Plain (SA), prior to drilling a prominent circular aeromagnetic feature. 2 percussion/rotary mud holes, each drilled to TD 369.5 m, penetrated crystalline...
      Document
    • PDF
  • The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.

    Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...
      Document
    • PDF
  • RB 94/00019 BARTON Bedrock Drilling Project, 1993.

    Between June and December 1993, 184 vertical RC stratigraphic drillholes totalling 10,126.2 m (average hole depth 55 m) were drilled by Mines and Energy South Australia at 2 km spacing along roadsides traversing much of the BARTON 1:250k map sheet...
      Document Published: 01 Jun 1994
    • PDF
  • RB 96/00043 Report on a transient electromagnetic survey around Garford Palaeochannel, SA.

    There are no known major groundwater resources in the Garford area, which borders the Barton and Ooldea Ranges dunefield and Great Victoria Desert southwest of Coober Pedy. The groundwater that is used by graziers for stock watering occurs in...
      Document Published: 01 Sep 1996
    • PDF
  • Cooper Hill. Annual reports and final report to licence expiry/full surrender, for the period 4/7/2003 to 24/8/2009.

    An area located approximately 90 km west-northwest of Ceduna, which was considered prospective for economic buried nickel, copper and cobalt mineralisation in Voisey's Bay type deposits that could possibly have formed in Proterozoic basement...
      Document Published: 23 Oct 1909
    • PDF
  • Lake Labyrinth (part of the Gawler Joint Venture Project). Data release made at the surrender of a subsequently renewed licence (EL 3252) : annual reports for the period 27/7/1994 to 26/7/1999.

    Exploration for possible economic buried magmatic/epithermal/hydrothermal/metamorphic gold and copper deposits, which may have formed within Archaean and Proterozoic basement rocks in an area located approximately 24 km north-west of Kingoonya,...
      Document
    • PDF
  • Commonwealth Hill, Perfection Well, Wirrida North, Nelson Bore and Ingomar (the Commonwealth Hill Joint Venture Project). Joint annual reports and final report to licences' respective expiry/renewal, for the period 6/10/1995 to 6/12/1998.

    Exploration for Challenger - type primary gold deposits that may possibly have formed within buried Archaean basement rocks in the Commonwealth Hill area, which is the purpose of one of two joint venture agreements currently in force between Minotaur...
      Document Published: 06 Jan 1999
    • PDF
  • PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.

    It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...
      Document
    • PDF
  • PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-14, Pernatty Lagoon area (eastern Gawler Craton) IOCG mineral prospects. Project final report.

    PACE proposal DPY3-14 aimed to discover a new iron oxide - associated copper-gold (IOCG) mineralised magmatic centre, similar to the Olympic Dam setting, within the eastern margin of the Gawler Craton. The Pernatty Lagoon project is located less than...
      Document Published: 20 Sep 1906
    • PDF
  • Manguri (part of the Mount Woods Joint Venture Project). Annual reports and final report to licence surrender, for the period 13/12/1999 to 4/10/2006.

    Possible craton margin magmatic nickel deposits or iron oxide - associated copper-gold (IOCG) type large base and precious metal deposits within buried Proterozoic basement were targeted in an area lying just to the north-west of Coober Pedy. Delays...
      Document Published: 20 Nov 1906
    • PDF
  • Sandstone Outstation. Annual reports to licence expiry/full surrender, for the period 22/11/1996 to 17/1/2006.

    A collection of eight land parcels recently relinquished from the Resolute Resources / Dominion Mining JV EL 2018, and covering 215 square km in an area located approximately 110 km south-west of Coober Pedy, was taken up by a new consortium intending...
      Document Published: 28 Feb 1906
    • PDF
  • PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.

    Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...
      Document Published: 28 Nov 1908
    • PDF
  • Verran and Fair View (the Corunna Project). Joint annual reports and final report to licences' joint expiry/full surrender, for the period 29/4/2005 to 28/4/2009.

    A search for possible economic North/South Alligator Rivers or McArthur River (NT) style epicratonic, unconformity - related sedimentary uranium deposits was conducted across two licences taken up over areas located west and south of Cleve on central...
      Document
    • PDF
  • Data release - as updated [made at SA Director of Mines’ discretion] : Aurora Tank. First annual report for the period 2/2/2010 to 1/2/2012, plus the next submitted licence-specific annual reports for the period 21/3/2013 to 1/2/2016.

    No field work was done on the subject licence during its first year, while land access permissions were being organised with the required authorities. The licence area is located approximately 100 km south-west of Coober Pedy and lies within the...
      Document
    • PDF
  • Data release - as updated [made at SA Director of Mines' discretion] : Uley. Annual reports for the period 16/9/2005 to 12/10/2018.

    A licence area located 20 km west-southwest of Port Lincoln, which covers the historically worked Uley graphite deposit and environs, was taken up to try to delineate sufficient mineral resources and, eventually, ore reserves of graphite in the Mining...
      Document Published: 25 Mar 1919
    • PDF
  • Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.

    Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...
      Document Published: 01 Apr 1970
    • PDF
  • PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-09 - Margaret Dam, southern margin, Peake and Denison Inliers, kimberlite diamond prospect. Drilling project final report.

    Monax Alliance's Margaret Dam Project is located on their EL 5347 Francis Creek, which is centred approximately 40 km south of William Creek in northern South Australia. The initial project work done for licence operator Monax Mining by geophysical...
      Document
    • PDF
  • Streaky Bay Lakes. Data release made in lieu of submitting a first partial surrender report at licence expiry/renewal on 18/2/1999: progress reports for the period 19/2/1993 to 18/2/1995.

    At the subject licence's Year 6 expiry/renewal on 18/2/1999, a partial relinquishment of 190 square km or ~49.35% of the former area of EL 2489 was effected, in the form of two separate ground portions covering its northern and southern ends. To...
      Document Published: 13 Mar 1900
    • PDF
  • 1
  • 2
  • 3
  • ...
  • 8
  • Next
Download in queue. Do not close this page.

Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.

Don’t want to wait? Request for a download link to be sent to you

Download started...

Your download will start automatically in a few seconds.

Request delivery

It usually takes us a few business days to deliver your selected downloads to you via an S3 bucket. Please leave your email address and we’ll be in touch when it’s ready.

Request submitted.

We’ll be in touch in the next few business days. Sometimes we can get a large number of requests, but we strive to get back to you quickly. If, after a few days you haven’t received an email, please email us on mesacOpenData@dnrme.qld.gov.au

Made with CKAN 2.9.7(1.79)
Acknowledgement
Copyright
Disclaimer
Privacy
Contact Us
South Australia Government