RB 77/00080 Kalangadoo town water supply. Well completion report, Kalangadoo TWS no. 1 (MA 94).
Kalangdoo Town Water Supply (T.W.S.) No. 1 well was drilled cable tool during February - May, 1977, and subsequently production tested. The unconfined Gambier Limestone aquifer was encountered between 5.5 and 86m, and was later cemented off down to...-
Document
Published: 01 Jan 1977
-
RB 80/00023 Groundwater pollution potential at Naracoorte abattoir.
Effluent is initially treated in waste disposal lagoons near ridge of Gambier Limestone which is a widespread and important water table aquifer. Consequently the risk of groundwater pollution is high. There is also risk of collapse of the floor of the...-
Document
Published: 01 Feb 1980
-
RB 78/00034 Mount Gambier town water supply - Completion report for well no. 8.
Water well was drilled to 250 metres into the confined aquifer Dilwyn Formation.-
Document
Published: 01 Jan 1978
-
RB 84/00084 Kongorong groundwater pollution investigation.
An SA government investigation has been undertaken to determine the extent of groundwater pollution resulting from the waste disposal practices used at the now abandoned Kongorong cheese factory. During the period 1924 to 1971, liquid effluent from...-
Document
Published: 01 Oct 1984
-
RB 78/00036 Kingston town water supply completion report for well no. 11 - EWS Department.
New production water well was drilled to 71 metres.-
Document
Published: 01 Jan 1978
-
RB 79/00034 Hydrogeological investigations, Apcel Pty Ltd, Snuggery. Report no. 3.
Drilling and testing of a new groundwater production well APCEL 14 at Snuggery has indicated a production rate of about 8000 cubic m/day (80,000 gallons per hour), which should have only minimal effects on groundwater levels in both the upper...-
Document
Published: 01 Jan 1979
-
RB 79/00076 Naracoorte town water supply, completion report for well no. 10 - EWS Department.
A new town water supply well, Naracoorte no. 10, encountered permeable confined aquifer sands at 160 m depth. Subsequent testing showed the well to have a yield of from 6000 to 7000 cubic m/day at a recommended pump intake depth of 85 m, with less...-
Document
Published: 01 Jan 1979
-
RB 80/00009 Groundwater pollution potential - Mount Gambier City Council rubbish dump. Report no. 2.
Investigations aimed to determine if leachate from the municipal dump is likely to reach the water table and travel toward the Blue Lake - Mount Gambiers water supply 1 km to the east. Network of observation wells were established to monitor the...-
Document
Published: 01 Feb 1980
-
RB 89/00074 Industrial and non metallic minerals - Operations in South Australia.
This data package discusses mining and processing operations of the major non metallic and industrial mineral commodities in South Australia and is of interest to those in the industry and to manufacturers and suppliers of a range of machinery and...-
Document
Published: 01 May 1989
-
RB 92/00045 Upper South-East dryland salinity and flood management plan. Excavation characteristics and slope design for the drainage channels.
The Upper South-East Dryland Salinity and Flood Management Plan proposals aim to address the worsening salinisation problems now clearly visible in the area. This report provides feasibility and preliminary project design data to the EWS engineers who...-
Document
Published: 01 Sep 1992
-
Lochaber. Data release : final report at licence full surrender, for the period 29/8/2006 to 6/7/2009.
EL 3623 is located 220 km south-east of Adelaide, and lies to the west of the township of Naracoorte. The tenement is also located ~35 km to the south-east of the much larger Kingston lignite deposit contained within the subject licencee's related EL...-
Document
Published: 02 Sep 1909
-
Data release [made at SA Director of Mines' discretion] : Mount Gambier. Final geological report on drilling.
There is no abstract created for this record-
Document
Published: 09 Aug 1999
-
Blackford and Lochaber (the Kingston Lignite Project). Individual licence reports and a joint annual report, plus final report at the full surrender of the remaining (Blackford) licence, for the period 3/8/2005 to 20/2/2015.
The Kingston coal (lignite) deposit, delineated by Western Mining Corp. in the early 1980s, has been re-assessed for the energy generation potential its coal represents, viewed in the context of recent increased demand for liquid transport fuels and...-
Document
Published: 02 Mar 1915
-
1969 gravity and seismic survey, Mayurra-Panhandle, final report.Final report for Mayurra-Panhandle Gravity and Seismic Survey 1969, PEL 8, SA.
Comprises details of the operations, field acquisition, results and interpretation of the seismic and gravity survey. A 12 mile 6-fold CDP line was shot from Millicent to the coast. The line tied previous and new surveys. Reprocessing and repicking of...-
Document
-
1967 seismic survey (marine), Otway Basin EOV, final report.
A report by the seismic operator details the operations and field acquisition techniques for the seismic survey. Also included are 27 interpretive maps prepared by the licence operator: stratigraphic cross section, time depth curves, time structure...-
Document
Published: 01 Jan 1967
-
Blackford, near Naracoorte (part of the South-East, South Australia (SESA) Coal Project). Data release made at licence's most recent partial surrender - Part 2 : related individual and multi-licence progress reports for the period 4/11/1978 to 22/2/1990.
TARGET: Coal in the Otway Basin in the Kingston area. EXPLORATION: Rotary drilling, core drilling and geophysical logging. RESULTS: Discovery and delineation of the Kingston coal deposit.-
Document
-
Geological study and petroleum potential, offshore Otway Basin - King Island. 1965 seismic survey (marine), Cape Grim to Cape Jaffa, final report.
AIM:The Cape Grim to Cape Jaffa Marine Seismic Survey was undertaken by Haematite Explorations Pty Ltd in its petroleum exploration leases held over the Otway Basin, to provide subsurface seismic reflector data along the narrow continental shelf from...-
Document
Published: 05 Aug 1965
-
1988 Lake Hawdon Seismic Survey. Final report.
AIM: To mature an intra-Pretty Hill Sandstone lead, which had been observed from the 1986 Lake Eliza Seismic Survey to exist as an unfaulted four-way dip closure within the downthrown fault block on the northern flank of the Lake Eliza High, and also...-
Document
Published: 01 Jan 1989
-
1963 seismic survey (marine), Gippsland, Bass Strait - Anglesea, final report.
AIM:This reconnaissance reflection seismic survey was conducted by OEL 26 licensee Haematite Explorations (a subsidiary of BHP Ltd) in three separate offshore areas of southeastern Australia, after receiving persuasive advice on the region's likely...-
Document
-
1992 Beachport Seismic Survey. Reports for the period February to June 1992.
AIM: To acquire further detailed reflection seismic coverage of the south-west of the licence area to resolve doubts about the currently mapped closures on the following structures: (i) The Woakwine Prospect, a tilted fault block near the intersection...-
Document