-
Kalabity. Progress reports to licence expiry/renewal for the period 15/3/1971 to 17/6/1973, plus related technical reports about in situ leach uranium mining methods in Wyoming.
The recently completed drilling of 189 open rotary holes (total penetration 22,427 m), plus the redrilling and geophysical re-logging by joint venturer Minad-Teton of 19 previously completed Carpentaria Exploration Co. uranium exploration holes (for a...-
Document
Published: 02 Jan 1974
-
Emu Hill. Progress and annual reports plus final report to licence expiry/full surrender, for the period 22/4/1991 to 21/4/1996.
Diamond exploration undertaken north-west of Moolawatana included the acquisition of airborne magnetic / radiometric and ground magnetic surveys, plus soil, stream sediment, gravel, loam and rock chip sampling, and aircore/diamond drilling (25 holes,...-
Document
-
RB 41/00134 Mineral investigations in the Mount Painter region. Progress report.
There is no abstract created for this record-
Document
Published: 06 Jan 1956
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Data release - as updated : Security Dam. Annual reports plus final report to licence expiry/full surrender, for the period 27/8/2007 to 26/8/2017.
A small licence area located ~30 km north of Cockburn has been being explored for possible economic shallowly buried sedimentary roll front style uranium mineralisation that may have formed within inferred Tertiary fluvial channel sands of the...-
Document
Published: 10 Oct 1917
-
Data release - as updated [made at SA Director of Mines’ discretion] : Bimbowrie. Annual reports for the period 4/11/2009 to 11/11/2018.
During licence Year 6 (2009-2010), the first year of tenure of renewed EL 4375, the main exploration activities undertaken by Sinosteel-PepinNini Curnamona Management Pty Ltd (SPCM) were to conduct two drilling campaigns, the first designed to...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kalabity. Annual reports for the period 25/2/2009 to 11/3/2019.
The main exploration activities undertaken during the first year of tenure of renewed EL 4239 (licence Year 6, 2009-2010) consisted of drill testing of uraniferous prospects defined by previous exploration, after the prior acquisition of an airborne...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kalkaroo (part of the Mundi Mundi Plains JV Project). Annual reports for the period 21/4/2005 to 20/4/2010.
An area of shallowly covered Curnamona Province metalliferous basement rocks abutting the South Australia / New South Wales border, approximately 80 km north-east of Olary, is believed to be prospective for Broken Hill and McArthur River style...-
Document
Published: 06 Oct 1910
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Fitton. Annual reports for the period 20/9/2010 to 19/9/2018.
An area comprising two separate sub-blocks located in the northern Flinders Ranges, which adjoins outside the western outcrop edge of the Mount Painter Inlier, has been taken up to explore for possible buried primary, bedrock-hosted vein or breccia...-
Document
Published: 13 Nov 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo mine, Bonython Hill, Mutooroo West, Oratan [Rock] and Cutana (the Curnamona South Project). Joint annual reports for the period 1/1/2014 to 31/12/2015.
Several separate areas that cover ground straddling the major tectonic boundary between the Olary and Broken Hill domains of the southern Curnamona Province are being explored for possible economic buried stratabound Proterozoic iron ore, epithermal...-
Document
-
Freeling Heights - Mount Adams area. Progress reports for the period 10/6/1968 to 9/12/1969.
As part of a regional search for economic uranium and copper mineralisation, the US-based company Kennecott Copper in November 1968 performed a semi-detailed airborne spectrometer survey of 550 line miles in the Shamrock Valley - Freeling Heights -...-
Document
-
Crocker Well and Jackson Hill. Joint and separate progress reports, and separate final reports to licences' full surrender, for the period 21/10/1991 to 23/9/1993.
Exploration for diamonds and for base and precious metals over an extensive area located 50 km north-west of Olary comprised regional helicopter-supported drainage sampling of gravel and stream sediments. Kimberlite indicators (chromite) were...-
Document
Published: 23 Sep 1993
-
Data release - as updated [made at SA Director of Mines' discretion] : Kalkaroo (part of the Mundi Mundi Plains JV Project). Annual reports for the period 21/4/2010 to 1/6/2018.
During 2010-2011, the sixth year of the subject licence, as part of its continuing search for buried economic Tertiary sediment-hosted roll front style secondary uranium deposits, Marmota conducted the following work: • acquired a 58.6 line km moving...-
Document
Published: 17 Jul 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Curnamona Project (uranium exploration spinoff). Joint annual reports for the period 1/1/2009 to 31/12/2011.
During the fifth year of the Curnamona - Uranium Project JV, during the 2009 calendar year, Curnamona Energy drilled a total of 124 holes for an aggregate depth of 11,777 m on EL 4262 (including RL 123). The drilling tested “blanket sands” at Oban...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Arkaroola (part of the Frome Basin Project). Annual reports for the period 3/6/1996 to 4/12/2008. [ Index Part 1 of 2 ].
A 1243 square km rugged mountainous area in the far northern Flinders Ranges extending between Arkaroola, Moolawatana, Prospect Hill, Mount Livingston and Mount Saturday was taken up to explore primarily for gold that it was hoped could exist in...-
Document
-
Parabarana. Progress and final reports to licence surrender, for the period 19/5/1969 to February 1971.
TARGET: Copper and uranium in Adelaidean sediments and Mesoproterozoic igneous rocks. EXPLORATION: A trial low-level helicopter-borne radiometric survey (using a nominal 1/10th mile flight line spacing and 50 foot mean sensor elevation) with ground...-
Document
-
Olary area. Progress reports to licence expiry for the period 1/7/1968 to 30/6/1970.
As part of a search for possible concealed stratiform base metal and precious metal deposits in the Olary district, induced polarisation surveys have located several significant anomalies in the Luxemberg mine area. A diamond drilling campaign (5...-
Document
Published: 30 Jun 1970
-
Kalabity - Old Boolcoomata area [= Olary 'A' Farmin Block]. Progress reports to licence expiry/renewal for the period 14/1/1971 to 13/1/1972.
As part of exploration for economic metallic mineral deposits within an area of partly outcropping Precambrian calcsilicate rocks present on Kalabity Station, a field reconnaissance of all known mineralised areas was carried out initially. The...-
Document
-
RB 00524 Radium Hill prospect, Crocker Well, uranium deposit economic appraisement.
Cost estimates for the treatment of uraniferous ore from both Crocker Well and Mount Victoria have already recieved some attention by the former Director of Mines, Mr. S.B. Dickinson - vide file S.B.5/7/16 - September 12, 1956. In the light of the...-
Document
Published: 01 Jan 1956
-
RB 00067 The Radium Hill Mining Field. [A review of uranium deposit mining history, geology and ore reserves, prior to a planned government-led mining campaign].
Radium Hill developed from the discovery in 1906 of an outcrop of davidite, a complex oxide composed of rare earths, uranium, iron and titanium. The deposit was worked on a small scale up to World War 1 as a source of radium. In 1944, the Federal...-
Document
Published: 01 Jul 1900